[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128600":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128600,793,2,"多选题","根据《水土保持法》，建设项目中的水土保持设施应与主体工程同时()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","批准",false,{"key":16,"text":17,"correct":18},"B","设计",true,{"key":20,"text":21,"correct":18},"C","施工",{"key":23,"text":24,"correct":18},"D","投产使用",{"key":26,"text":27,"correct":14},"E","验收","BCD","水土保持设施“三同时”，为保证经过批准的水土保持方案的严格实施，建设项目中的水土保持设施，必须与主体工程同时设计、同时施工、同时投产使用（简称“三同时”)。建设工程竣工验收时，应当同时验收水土保持设施，并有水行政主管部门参加。水土保持设施验收不合格的，工程项目不得投入使用。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]