[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128592":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128592,793,2,"多选题","根据《关于加强小型病险水库除险加固项目验收管理的指导意见》（水建管[2013]178号），小型病险水库除险加固项目政府验收包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","分部工程验收",false,{"key":16,"text":17,"correct":14},"B","单位工程验收",{"key":19,"text":20,"correct":21},"C","蓄水验收",true,{"key":23,"text":24,"correct":14},"D","合同工程完工验收",{"key":26,"text":27,"correct":21},"E","竣工验收","CE","(1)小型除险加固项目验收分为法人验收和政府验收，法人验收包括分部工程验收和单位工程验收，政府验收包括蓄水验收（或主体工程完工验收，下同）和竣工验收。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]