[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128581":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128581,793,2,"多选题","水利水电工程施工质量评定结论须报质量监督机构核备的有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","重要隐蔽单元工程",true,{"key":16,"text":17,"correct":14},"B","关键部位单元工程",{"key":19,"text":20,"correct":21},"C","单位工程",false,{"key":23,"text":24,"correct":21},"D","工程外观",{"key":26,"text":27,"correct":21},"E","工程项目","AB","施工质量评定的要求，(2)重要隐蔽单元工程及关键部位单元工程质量经施工单位自评合格、监理单位抽检后，由项目法人（或委托监理）、监理、设计、施王、工程运行管理（施工阶段已经有时）等单位组成联合小组，共同检查核定其质量等级并填写签证表，报工程质量监督机构核备。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]