[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128565":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128565,793,2,"多选题","（2020年真题）根据《水利建设项目后评价管理办法（试行）》，过程评价的内容包括（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","财务评价",false,{"key":16,"text":17,"correct":14},"B","国民经济评价",{"key":19,"text":20,"correct":14},"C","综合评价",{"key":22,"text":23,"correct":24},"D","前期工作",true,{"key":26,"text":27,"correct":24},"E","运行管理","DE","P132-134 过程评价：前期工作、建设实施、运行管理等。AB选项为经济评价，C选项为项目后评价中的综合评价。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]