[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128444,793,1,"单选题","根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，竣工验收应在工程建设项目全部完成并满足一定运行条件后1年内进行。不能按期进行竣工验收的，经竣工验收主持单位同意，可适当延长期限，但最长不得超过( )个月。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":18},"B","6",true,{"key":20,"text":21,"correct":14},"C","12",{"key":23,"text":24,"correct":14},"D","9","2020版教材P293 根据《水利水电建设工程验收规程》SL 223—2008,竣工验收应在工程建设项目全部完成并满足一定运行条件后1年内进行。不能按期进行竣工验收的，经竣工验收主持单位同意，可适当延长期限，但最长不得超过6个月。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]