[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128439":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1128439,793,1,"单选题","工程档案的归档时间，可由项目法人根据实际情况确定。可分阶段在单位工程或单项工程完工后向项目法人归档，也可在主体工程全部完工后向项目法人归档。整个项目的归档工作和项目法人向有关单位的档案移交工作，应在工程竣工验收后( )个月内完成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",true,{"key":16,"text":17,"correct":18},"B","6",false,{"key":20,"text":21,"correct":18},"C","9",{"key":23,"text":24,"correct":18},"D","12","2020版教材P291 (10)工程档案的归档时间，可由项目法人根据实际情况确定。可分阶段在单位工程或单项工程完工后向项目法人归档，也可在主体工程全部完工后向项目法人归档。整个项目的归档工作和项目法人向有关单位的档案移交工作，应在工程竣工验收后三个月内完成。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]