[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128437":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1128437,793,1,"单选题","根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，阶段验收由( )或其委托单位主持。阶段验收委员会应由验收主持单位、质量和安全监督机构、运行管理单位的代表以及有关专家组成；必要时，可邀请地方政府及有关部门参加。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","承包单位",false,{"key":16,"text":17,"correct":14},"B","项目法人",{"key":19,"text":20,"correct":14},"C","分部验收主持单位",{"key":22,"text":23,"correct":24},"D","竣工验收主持单位",true,"2020版教材P278 (2)阶段验收应由竣工验收主持单位或其委托的单位主持。阶段验收委员会应由验收主持单位、质量和安全监督机构、运行管理单位的代表以及有关专家组成；必要时，可邀请地方人民政府以及有关部门参加。工程参建单位应派代表参加阶段验收，并作为被验收单位在验收鉴定书上签字。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]