[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128427":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128427,793,1,"单选题","项目法人不得调减或挪用批准概算中所确定的水利工程建设有关安全作业环境及安全施工措施等所需费用。工程承包合同中( )安全作业环境及安全施工措施所需费用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不得明确",false,{"key":16,"text":17,"correct":18},"B","应当明确",true,{"key":20,"text":21,"correct":14},"C","根据施工需要明确",{"key":23,"text":24,"correct":14},"D","不提倡明确","2020版教材P245 (3)项目法人不得调减或挪用批准概算中所确定的水利工程建设有关安全作业环境及安全施工措施等所需费用。工程承包合同中应当明确安全作业环境及安全施工措施所需费用。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]