[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128414":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128414,793,1,"单选题","单元（工序）工程完工后，应及时评定其质量等级，并按现场检验结果，如实填写《评定表》。现场检验应遵守( )原则。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","试验验证",false,{"key":16,"text":17,"correct":18},"B","随机取样",true,{"key":20,"text":21,"correct":14},"C","抽查核定",{"key":23,"text":24,"correct":14},"D","质量核定","2020版教材P244 (1)单元（工序）工程完工后，应及时评定其质量等级，并按现场检验结果，如实填写《评定表》。现场检验应遵守随机取样原则。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]