[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128373":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128373,793,1,"单选题","施工单位( )将其承接的水利建设项目的主体工程进行转包。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一般不得",false,{"key":16,"text":17,"correct":18},"B","不得",true,{"key":20,"text":21,"correct":14},"C","根据实际情况可以",{"key":23,"text":24,"correct":14},"D","可以","2020版教材P220 ②施工单位不得将其承接的水利建设项目的主体工程进行转包。对工程的分包，分包单位必须具备相应资质等级，并对其分包工程的施工质量向总包单位负责，总包单位对全部工程质量向项目法人（建设单位)负责。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]