[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128335":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1128335,793,1,"单选题","根据《堤防和疏浚工程施工合同范本》，发生改变原设计标准和规模的设计变更时，应报( )批准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","监理人",false,{"key":16,"text":17,"correct":14},"B","发包人",{"key":19,"text":20,"correct":14},"C","原设计单位",{"key":22,"text":23,"correct":24},"D","原设计审批部门",true,"2020版教材P144 9)工程设计变更审批采取分级管理制度。重大设计变更文件，由项目法人按原报审程序报原初步设计审批部门审批。一般设计变更由项目法人组织审查确认后，并报项目主管部门核备，必要时寸艮项目主管部门审批。设计变更文件批准后由项目法人负责组织实施。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]