[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128312":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1128312,793,1,"单选题","根据《水利工程设计概（估）算编制规定》，安全生产措施费属于( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","税费",false,{"key":16,"text":17,"correct":14},"B","间接费",{"key":19,"text":20,"correct":21},"C","其他直接费",true,{"key":23,"text":24,"correct":14},"D","现场经费","2020版教材P162 基本直接费包括人工费、材料费、施工机械使用费。 其他直接费包括冬雨期施工增加费、夜间施工增加费、特殊地区施工增加费、临时设施费、安全生产措施费和其他。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]