[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128307":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1128307,793,1,"单选题","水利建筑安装工程的施工成本直接费中的其他费用不包括（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工工具用具使用费",false,{"key":16,"text":17,"correct":14},"B","工程定位复测费",{"key":19,"text":20,"correct":21},"C","使用施工道路照明费用",true,{"key":23,"text":24,"correct":14},"D","设备仪表移交生产前的维护观察费","2020版教材P163 其他费用包括施工工具用具使用费、检验试验费、工程定位复测、工程点交、竣工场地清理、工程项目及设备仪表移交生产前的维护观察费。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]