[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128291":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1128291,793,1,"单选题","招投标阶段，现浇混凝土应按招标设计图示尺寸计算的有效实体方体积计量。截面积小于( )的孔洞工程量不予扣除。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0.1平方米",true,{"key":16,"text":17,"correct":18},"B","0.2平方米",false,{"key":20,"text":21,"correct":18},"C","0.3平方米",{"key":23,"text":24,"correct":18},"D","0.4平方米","2020版教材P178 (2)混凝土有效工程量不扣除设计单体体积小于0.1m3的圆角或斜角，单体占用的空间体积小于0.1m3的钢筋和金属件，单体横截面积小于0.1m2的孔洞、排水管、预埋管和凹槽等所占的体积，按设计要求对上述孔洞回填的混凝土也不予计量。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]