[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128276":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1128276,793,1,"单选题","为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","措施项目",true,{"key":16,"text":17,"correct":18},"B","零星工作项目",false,{"key":20,"text":21,"correct":18},"C","分类分项工程项目",{"key":23,"text":24,"correct":18},"D","其他项目","2020版教材P172 措施项目指为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目。措施项目清单，主要包括环境保护、文明施工、安全防护措施、小型临时工程、施工企业进退场费、大型施工设备安拆费等。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]