[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128248,793,1,"单选题","涉及工程开发任务和工程规模、设计标准、总体布局等方面发生较大变化的设计变更，应征得原（）报告批复部门的同意。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":18},"B","可行性研究",true,{"key":20,"text":21,"correct":14},"C","初步设计",{"key":23,"text":24,"correct":14},"D","规划","2020版教材P144 5)涉及工程开发任务变化和工程规模、设计标准、总体布局等方面较大变化的设计变更，应当征得原可行性研究报告批复部门的同意。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]