[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128178":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128178,793,1,"单选题","水泵安装时，无底座直接传动的卧式机组安装的流程顺序正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","校正一吊水泵一水泵安装一动力机安装一验收",false,{"key":16,"text":17,"correct":18},"B","吊水泵一校正一水泵安装一动力机安装一验收",true,{"key":20,"text":21,"correct":14},"C","吊水泵一校正一水泵安装一验收一动力机安装",{"key":23,"text":24,"correct":14},"D","校正一吊水泵一水泵安装一验收一动力机安装","2021\u002F2020版教材P117 无底座直接传动的卧式机组安装流程是吊水泵、中心线校正、水平校正、标高校正、拧紧地脚螺栓、水泵安装、动力机安装、最后验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]