[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128125":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1128125,793,1,"单选题","当承重模板的跨度大于4m时，其设计起拱值通常取跨度的( )左右。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","0.10%",false,{"key":16,"text":17,"correct":14},"B","2%",{"key":19,"text":20,"correct":21},"C","0.30%",true,{"key":23,"text":24,"correct":14},"D","0.40%","2021\u002F2020版教材P94页 当承重模板的跨度大于4m时，其设计起拱值通常取跨度的0.3%左右。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]