[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128084":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1128084,793,1,"单选题","采用挖坑灌水（砂）法测堆石料密度，其试坑直径最大不超过（）m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":18},"B","2",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","4","2021\u002F2020版教材P92 对不同坝料密（密实度、含水率的检测方法详见表2F313032-2。堆石料、过渡 料采用挖坑灌水（砂）法测密度，试坑直径不小于坝料最大粒径的2 ~ 3倍，最大不超过 2m，试坑深度为碾压层厚。环刀法测密度时，应取压实层的下部；挖坑灌水（砂）法， 应挖至层间结合面。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]