[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127887":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1127887,793,1,"单选题","《评定表》中，设计值按（ ）填写。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工图",true,{"key":16,"text":17,"correct":18},"B","实测值",false,{"key":20,"text":21,"correct":18},"C","偏差值",{"key":23,"text":24,"correct":18},"D","预算图","本题考查的是施工质量评定表的使用。《评定表》中设计值按施工图填写。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]