[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127885":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1127885,793,1,"单选题","单位工程施工质量合格的标准中，其中要求工程外观质量得分率达到（ ）以上。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","70%",true,{"key":16,"text":17,"correct":18},"B","85%",false,{"key":20,"text":21,"correct":18},"C","90%",{"key":23,"text":24,"correct":18},"D","75%","本题考查的是施工质量评定的要求。单位工程施工质量合格标准：（1）所含分部工程质量全部合格；（2）质量事故已按要求进行处理；（3）工程外观质量得分率达到70%以上；（4）单位工程施工质量检验与评定资料基本齐全；（5）工程施工期及试运行期，单位工程观测资料分析结果符合国家和行业技术标准以及合同约定的标准要求。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]