[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127881":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1127881,793,1,"单选题","根据《水电建设工程质量管理暂行办法》，监理单位对其验收合格项目的施工质量负（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","监督责任",false,{"key":16,"text":17,"correct":14},"B","间接责任",{"key":19,"text":20,"correct":14},"C","控制责任",{"key":22,"text":23,"correct":24},"D","直接责任",true,"本题考查的是水力发电工程质量管理的要求。监理单位对工程建设过程中的设计与施工质量负监督与控制责任，对其验收合格项目的施工质量负直接责任。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]