[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1127856,793,1,"单选题","暂列金额一般可为分类分项工程项目和措施项目合价的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3%",false,{"key":16,"text":17,"correct":18},"B","5%",true,{"key":20,"text":21,"correct":14},"C","10%",{"key":23,"text":24,"correct":14},"D","30%","本题考查的是投标阶段成本管理。暂列金额一般可为分类分项工程项目和措施项目合价的5%。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]