[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127839":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1127839,793,1,"单选题","（ ）是工程完成建设目标的标志。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","后评价",false,{"key":16,"text":17,"correct":18},"B","竣工验收",true,{"key":20,"text":21,"correct":14},"C","竣工决算",{"key":23,"text":24,"correct":14},"D","完工验收","本题考查的是水利工程建设项目的类型和建设阶段划分。竣工验收是工程完成建设目标的标志，是全面考核建设成果、检验设计和工程质量的重要步骤。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]