[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127834":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1127834,793,1,"单选题","建设实施阶段是指主体工程的建设实施，（ ）按照批准的建设文件，组织工程建设，保证项目建设目标的实现。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目法人",true,{"key":16,"text":17,"correct":18},"B","承包商",false,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","设计单位","本题考查的是水利工程建设项目的类型和建设阶段划分。建设实施阶段是指主体工程的建设实施，项目法人按照批准的建设文件，组织工程建设，保证项目建设目标的实现。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]