[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127826":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1127826,793,1,"单选题","某工程采用不过水土石围堰，基坑上游围堰挡水位为20m，下游围堰挡水位为19.4m，上下游水位差为0.6m，波浪爬高为0.5m，安全超高为1.0m，该工程下游围堰堰顶高程至少应为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A：20.9m",true,{"key":16,"text":17,"correct":18},"B","B：21.5m",false,{"key":20,"text":21,"correct":18},"C","C：21.6m",{"key":23,"text":24,"correct":18},"D","D：22.1m","下游围堰的堰顶高程由下式决定：Hd=hd+ha+δ，式中：Hd——下游围堰的堰顶高程（m）；hd——下游水位高程（m），可以直接由原河流水位流量关系曲线中找出；ha——波浪爬高（m）；δ——围堰的安全超高（m），一般对于不过水围堰可按规定选择，对于过水围堰可不予考虑。所以下游围堰堰顶高程=19.4+0.5+1.0=20.9(m)。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]