[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127783":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1127783,793,1,"单选题","拌合设备的小时生产能力可按混凝土（ ）高峰强度计算确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","月",true,{"key":16,"text":17,"correct":18},"B","旬",false,{"key":20,"text":21,"correct":18},"C","半年",{"key":23,"text":24,"correct":18},"D","年","本题考查的是拌合设备生产能力的确定。拌合设备的小时生产能力可按混凝土月高峰强度计算确定。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]