[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127700":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1127700,793,1,"单选题","根据《堤防和疏浚工程施工合同范本》，承包人不能按合同约定的开工日期开工，应在开工日期()天前向监理机构提出延期开工申请，经批准后，完工日期方可顺延。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":21},"C","7",true,{"key":23,"text":24,"correct":14},"D","14","教材删除了《堤防和疏浚工程施工合同范本》的内容；增加了案例的数量；根据有关规定对相关知识进行了更新和补充。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]