[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127655":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1127655,793,1,"单选题","《水土保持法》（2011年颁布）规定，水土保持方案实施过程中，水土保持措施需作重大变更的，应经()批准。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","方案编制单位",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":21},"C","原审批机关",true,{"key":23,"text":24,"correct":14},"D","监理单位","需要注意，水土保持方案实施过程中，水土保持措施需要作出重大变更的，应当经原审批机关批准。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]