[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127642":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1127642,793,1,"单选题","根据《水利水电建设工程验收规程》SL223-2008，分部工程验收应由（）主持。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":18},"B","项目法人",true,{"key":20,"text":21,"correct":14},"C","施工单位",{"key":23,"text":24,"correct":14},"D","勘测单位","法人验收应包括分部工程验收、单位丁程验收、水电站（栗站中间机组启动验收、合同工程完工验收等；政府验收应包括阶段验收、专项验收、竣工验收等。验收主持单位可根据工程建设需要增设验收的类别和具体要求。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]