[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127641":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1127641,793,1,"单选题","水利工程竣工验收自查工作应由()组织。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位",false,{"key":16,"text":17,"correct":14},"B","监理单位",{"key":19,"text":20,"correct":21},"C","项目法人",true,{"key":23,"text":24,"correct":14},"D","质量监督机构","(三）竣工验收的程序(1)项目法人组织进行竣工验收自查。(2)项目法人提交竣工验收申请报告。(3)竣工验收主持单位批复竣工验收申请报告。(4)竣工验收技术鉴定（大型工程）。(5)进行竣工技术预验收。(6)召开竣工验收会议。(7)印发竣工验收鉴定书。可见C选项正确",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]