[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127603":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1127603,793,1,"单选题","（2017年）根据《水利工程工程量清单计价规范》（GB 50501-2007），下列费用中，不包含在土方明挖工程单价中，需另行支付的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","植被清理费",false,{"key":16,"text":17,"correct":18},"B","场地平整费",true,{"key":20,"text":21,"correct":14},"C","施工超挖费",{"key":23,"text":24,"correct":14},"D","测量放样费","考点:施工实施阶段成本管理。选项A，包含在《工程量清单》相应土方明挖项目有效工程量的每立方米工程单价中，不另行支付；选项C，测量放样，临时性排水措施（包括排水设备的安拆、运行和维修），土方开挖、装卸和运输，边坡整治和稳定观测均不另行支付；选项D，施工过程中增加的超挖量和施工附加量所需的费用，应包含在《工程量清单》相应项目有效工程量的每立方米工程单价中，不另行支付。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]