[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127592":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1127592,793,1,"单选题","低温季节混凝土施工时，提高混凝土拌合料温度不能直接加热()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","砂",false,{"key":16,"text":17,"correct":14},"B","水",{"key":19,"text":20,"correct":14},"C","石子",{"key":22,"text":23,"correct":24},"D","水泥",true,"混凝土施工温控措施，选择混凝土预冷材料时，主要考虑用冷水拌合、加冰搅拌、预冷骨料等，一般不把胶凝材料（水泥、粉煤灰等）选作预冷材料。",{"id":6,"name":27,"category":28,"favorite":29},"二建水利水电实务","建筑工程",0]