[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,9,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,272,284,296,306,318,330,342,354,366,378,387,399,411,423,435,447,459,471,483,495,507,519,531,542,554,566,578,587,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1124893,1,"单选题","承担燃气钢质管道、设备焊接的人员，不能上岗的条件是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","具有锅炉压力容器、压力管道特种设备操作人员资格证（焊接）焊工合格证书",false,{"key":24,"text":25,"correct":22},"B","焊接范围在证书注明的合格范围内",{"key":27,"text":28,"correct":22},"C","证书在有效期内",{"key":30,"text":31,"correct":32},"D","间断焊接时间超过6个月",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1124894,"计划批准的开工项目应由（ ）向有关部门申请办理施工许可证手续。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目总承包单位",{"key":24,"text":41,"correct":22},"施工总承包单位",{"key":27,"text":43,"correct":32},"建设单位",{"key":30,"text":45,"correct":22},"监理单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1124897,"根据《地下铁道工程施工及验收规范》（GB50299-1999）的有关规定，隧道采用钻爆法施工时，必须事先编制爆破方案，在实施前还需履行的程序是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"报业主批准，并经城市主管部门同意",{"key":24,"text":53,"correct":22},"报监理批准，并经公安部门同意",{"key":27,"text":55,"correct":22},"报上级公司批准，并经城市主管部门同意",{"key":30,"text":57,"correct":32},"报城市主管部门批准，并经公安部门同意",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1124898,"喷锚暗挖隧道施工应充分利用围岩支承作用，开挖后及时施工初期支护结构并应适时（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"闭合",{"key":24,"text":65,"correct":22},"注浆",{"key":27,"text":67,"correct":22},"超前支护",{"key":30,"text":69,"correct":22},"施工二衬",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1124899,"隧道施工中，应对地面、地层和支护结构进行动态监测，并及时（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"采取措施",{"key":24,"text":77,"correct":32},"反馈信息",{"key":27,"text":79,"correct":22},"报告监理",{"key":30,"text":81,"correct":22},"报告业主",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1124900,"隧道采用（ ）时，必须事先编制爆破方案，报城市主管部门批准，并经公安部门同意后方可实施。",[86,88,90,92],{"key":20,"text":87,"correct":22},"降水施工",{"key":24,"text":89,"correct":22},"无水施工",{"key":27,"text":91,"correct":22},"喷锚暗挖施工",{"key":30,"text":93,"correct":32},"钻爆法施工",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1124901,"隧道开挖面必须保持在（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"降水条件下施工",{"key":24,"text":101,"correct":32},"无水条件下施工",{"key":27,"text":103,"correct":22},"暗挖条件下施工",{"key":30,"text":105,"correct":22},"爆破条件下施工",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1124903,"钢管焊接人员间断焊接时间超过（ ）个月，再次上岗前应重新考试。",[110,112,114,116],{"key":20,"text":111,"correct":22},"3",{"key":24,"text":113,"correct":22},"4",{"key":27,"text":115,"correct":22},"5",{"key":30,"text":117,"correct":32},"6",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1124906,"非承包方原因导致项目拖延和成本增加的，其需在（ ）内向监理工程师以正式函件提出索赔要求。",[122,124,126,128],{"key":20,"text":123,"correct":22},"14d",{"key":24,"text":125,"correct":22},"21d",{"key":27,"text":127,"correct":32},"28d",{"key":30,"text":129,"correct":22},"15d",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1124907,"承包方根据施工合同，向监理工程师提出变更申请；监理工程师进行审查通过向承包方提出（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"变更令",{"key":24,"text":137,"correct":22},"通知单",{"key":27,"text":139,"correct":22},"会审单",{"key":30,"text":141,"correct":22},"开工令",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1124908,"分包人因过失给发包人造成损失的，承包人（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"承担连带责任",{"key":24,"text":149,"correct":22},"不承担相关损失",{"key":27,"text":151,"correct":22},"承担分包费用",{"key":30,"text":153,"correct":22},"承担主要责任",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1124909,"延期发出图纸产生的索赔一般为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"工期索赔",{"key":24,"text":161,"correct":22},"费用索赔",{"key":27,"text":163,"correct":22},"人员索赔",{"key":30,"text":165,"correct":22},"机械索赔",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1124910,"在国内工程总承包中，往往同时存在（ ）等方面风险。",[170,172,174,176],{"key":20,"text":171,"correct":22},"经济.技术.商务",{"key":24,"text":173,"correct":32},"经济.技术.公共关系",{"key":27,"text":175,"correct":22},"政治.技术.法律",{"key":30,"text":177,"correct":22},"政治.经济.法律",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1124911,"索赔的最终报告不包含（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"索赔申请表",{"key":24,"text":185,"correct":22},"批复的索赔意向书",{"key":27,"text":187,"correct":22},"编制说明",{"key":30,"text":189,"correct":32},"招标文件及合同",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1124912,"下列不属于施工项目合同管理依据的是( )。",[194,196,198,200],{"key":20,"text":195,"correct":32},"必须遵守《合同法》或《建筑法》以及有关法律法规",{"key":24,"text":197,"correct":22},"合同订立主体是发包方和承包方，由其法定代表人行使法律行为",{"key":27,"text":199,"correct":22},"项目负责人受承包方委托，具体履行合同的各项约定",{"key":30,"text":201,"correct":22},"必须依据与承包方订立的合同条款执行，依照合同约定行使权力，履行义务",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1124913,"施工项目管理的核心是施工（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"安全管理",{"key":24,"text":209,"correct":22},"进度管理",{"key":27,"text":211,"correct":22},"质量管理",{"key":30,"text":213,"correct":32},"成本管理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1124914,"轮番假定多因素中一个因素变化，逐个计算、确定其对成本的影响，该方法为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"比较法",{"key":24,"text":221,"correct":32},"因素分析法",{"key":27,"text":223,"correct":22},"比率法",{"key":30,"text":225,"correct":22},"差额计算法",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},1124915,"下列哪个不是施工成本目标控制的原则（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"成本最低原则",{"key":24,"text":233,"correct":22},"全员成本原则",{"key":27,"text":235,"correct":22},"目标分解原则",{"key":30,"text":237,"correct":32},"方便实用原则",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1124916,"施工成本管理措施中的两算对比指的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":32},"施工图预算与施工预算的对比",{"key":24,"text":245,"correct":22},"设计概算与施工预算的对比",{"key":27,"text":247,"correct":22},"设计概算与施工图预算的对比",{"key":30,"text":249,"correct":22},"设计概算与估算指标的对比",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1124917,"下列属于项目施工成本核算方法的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"业务核算",{"key":24,"text":257,"correct":32},"会计核算",{"key":27,"text":259,"correct":22},"进度核算",{"key":30,"text":261,"correct":22},"分解核算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1124918,"专项方案需论证时，专家组成员应当由（ ）名及以上符合相关专业要求的专家组成。",[266,267,268,270],{"key":20,"text":111,"correct":22},{"key":24,"text":115,"correct":32},{"key":27,"text":269,"correct":22},"7",{"key":30,"text":271,"correct":22},"9",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":30,"analysis":33},1124919,"在施工总荷载（ ）的混凝土模板支撑工程中，需要组织专家论证。",[276,278,280,282],{"key":20,"text":277,"correct":22},"5kN\u002Fm2",{"key":24,"text":279,"correct":22},"10kN\u002Fm2",{"key":27,"text":281,"correct":22},"12kN\u002Fm2",{"key":30,"text":283,"correct":32},"15kN\u002Fm2",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1124920,"（ ）是施工技术方案的核心内容。",[288,290,292,294],{"key":20,"text":289,"correct":32},"施工方法",{"key":24,"text":291,"correct":22},"施工机械",{"key":27,"text":293,"correct":22},"施工组织",{"key":30,"text":295,"correct":22},"施工顺序",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1124921,"施工方案的核心内容是（ ）。",[300,302,303,304],{"key":20,"text":301,"correct":22},"施工环境",{"key":24,"text":295,"correct":22},{"key":27,"text":289,"correct":32},{"key":30,"text":305,"correct":22},"施工组织条件",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1124922,"交通导行方案的的设计，应与（ ）协调一致。",[310,312,314,316],{"key":20,"text":311,"correct":32},"现场平面布置图",{"key":24,"text":313,"correct":22},"施工方案",{"key":27,"text":315,"correct":22},"疏导方案",{"key":30,"text":317,"correct":22},"施工监测方案",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1124923,"施工组织设计应由（ ）主持编制。",[322,324,326,328],{"key":20,"text":323,"correct":32},"项目负责人",{"key":24,"text":325,"correct":22},"项目技术负责人",{"key":27,"text":327,"correct":22},"企业负责人",{"key":30,"text":329,"correct":22},"企业技术负责人",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1124924,"需要编制专项方案，但不需要组织专家论证的分部分项工程是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":32},"支架高度7m",{"key":24,"text":337,"correct":22},"搭设高度50m以上落地式钢管脚手架工程",{"key":27,"text":339,"correct":22},"地下隧道",{"key":30,"text":341,"correct":22},"飞模",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1124925,"根据《危险性较大的分部分项工程安全管理规定》，采用非常规起重设备、方法的起重作业且单件起吊重量在（ ）及以上的起重吊装工程，属于危险性较大的分部分项工程。",[346,348,350,352],{"key":20,"text":347,"correct":22},"5kN",{"key":24,"text":349,"correct":32},"100kN",{"key":27,"text":351,"correct":22},"15kN",{"key":30,"text":353,"correct":22},"20kN",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},1124926,"施工过程中，各种模板应按规格分类叠放整齐，地面应平整坚实，叠放高度一般不宜超过（ ）m。",[358,360,362,364],{"key":20,"text":359,"correct":22},"0.8",{"key":24,"text":361,"correct":22},"1.1",{"key":27,"text":363,"correct":32},"1.6",{"key":30,"text":365,"correct":22},"2",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":30,"analysis":33},1124927,"施工现场的围挡一般应高于（ ）m，在市区主要道路内应高于（ ）m，且应符合当地有关主管部门的规定。",[370,372,374,376],{"key":20,"text":371,"correct":22},"1.6；2",{"key":24,"text":373,"correct":22},"1.6；2.5",{"key":27,"text":375,"correct":22},"0.8；2",{"key":30,"text":377,"correct":32},"1.8；2.5",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":30,"analysis":33},1124928,"施工现场围挡在市区主要道路内应高于（ ）m，且应符合当地有关主管部门的规定。",[382,383,384,385],{"key":20,"text":365,"correct":22},{"key":24,"text":363,"correct":22},{"key":27,"text":365,"correct":22},{"key":30,"text":386,"correct":32},"2.5",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1124929,"关于临时设施的搭设，职工宿舍室内净高不得小于（ ）m，通道宽度不得小于（ ）m。",[391,393,395,397],{"key":20,"text":392,"correct":22},"2.2；0.9",{"key":24,"text":394,"correct":22},"2.2；1.2",{"key":27,"text":396,"correct":32},"2.5；0.9",{"key":30,"text":398,"correct":22},"2.4；1.2",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1124930,"夜间施工的时间段具体是指（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"22时～次日4时",{"key":24,"text":406,"correct":32},"22时～次日6时",{"key":27,"text":408,"correct":22},"24时～次日4时",{"key":30,"text":410,"correct":22},"24时～次日6时",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},1124931,"下列关于施工现场场地要求的说法错误的是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"场地应当整平，无障碍物",{"key":24,"text":418,"correct":22},"施工现场应设置排水系统及沉淀池",{"key":27,"text":420,"correct":32},"现场废水可直接排入市政污水管网",{"key":30,"text":422,"correct":22},"库房地面应进行防渗漏处理",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1124932,"劳务企业将劳务人员的基本身份信息，培训、继续教育等录入IC卡，这属于IC卡的（ ）管理功能。",[427,429,431,433],{"key":20,"text":428,"correct":22},"工资管理",{"key":24,"text":430,"correct":32},"人员信息管理",{"key":27,"text":432,"correct":22},"考勤管理",{"key":30,"text":434,"correct":22},"门禁管理",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1124933,"市政公用工程的施工平面布置图有明显的（ ）特性，必须详细考虑好每一步的平面布置及其合理衔接。",[439,441,443,445],{"key":20,"text":440,"correct":22},"静态",{"key":24,"text":442,"correct":32},"动态",{"key":27,"text":444,"correct":22},"稳定",{"key":30,"text":446,"correct":22},"辅助",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1124934,"关于材料堆放表述错误的是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"施工过程中做到“活完.料净.脚下清”",{"key":24,"text":454,"correct":22},"砖应丁码成方垛，不准超高并距离沟槽坑边不小于0.5m",{"key":27,"text":456,"correct":32},"各种模板叠放高度一般不宜超过1.5m",{"key":30,"text":458,"correct":22},"各种材料应当按照品种.规格堆放，并设明显标牌",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":30,"analysis":33},1124935,"关于施工文明施工的说法，错误的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"现场宿舍必须设置开启式窗户",{"key":24,"text":466,"correct":22},"现场食堂必须办理卫生许可证",{"key":27,"text":468,"correct":22},"施工现场必须实行封闭管理",{"key":30,"text":470,"correct":32},"现场食堂必须办理动火证",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1124937,"某市政工程网络计划图如下（单位为月），该工程的关键路线是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"①→②→⑤→⑥",{"key":24,"text":478,"correct":32},"①→②→③→④→⑤→⑥",{"key":27,"text":480,"correct":22},"①→③→④→⑥",{"key":30,"text":482,"correct":22},"①→③→④→⑤→⑥",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1124938,"分包工程施工进度控制说法错误的是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"分包单位的施工进度计划必须依据承包单位的施工进度计划编制",{"key":24,"text":490,"correct":32},"分包单位应将的承包施工进度计划纳入总进度计划的控制范围",{"key":27,"text":492,"correct":22},"总、分包之间相互协调，处理好进度执行过程中的相关关系",{"key":30,"text":494,"correct":22},"承包单位应协助分包单位解决施工进度控制中的相关问题",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":30,"analysis":33},1124939,"下列因素中，不属于施工进度计划编制依据的是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"工程项目所在地自然条件",{"key":24,"text":502,"correct":22},"施工单位投入资源情况",{"key":27,"text":504,"correct":22},"工程项目所在地资源情况",{"key":30,"text":506,"correct":32},"建设单位组织机构设置",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":27,"analysis":33},1124941,"施工进度总目标以（ ）为最终目标。",[511,513,515,517],{"key":20,"text":512,"correct":22},"缩短工期",{"key":24,"text":514,"correct":22},"保证质量",{"key":27,"text":516,"correct":32},"实现施工合同约定的竣工日期",{"key":30,"text":518,"correct":22},"节约成本",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},1124942,"项目进度控制总目标可按承包的专业或（ ）分解为完工分目标。",[523,525,527,529],{"key":20,"text":524,"correct":22},"完成阶段",{"key":24,"text":526,"correct":22},"合同阶段",{"key":27,"text":528,"correct":32},"施工阶段",{"key":30,"text":530,"correct":22},"检验阶段",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},1124943,"工程施工过程中，（ ）对施工进度计划应进行定期或不定期审核。",[535,537,539,541],{"key":20,"text":536,"correct":32},"项目部",{"key":24,"text":538,"correct":22},"施工单位技术负责人",{"key":27,"text":540,"correct":22},"监理工程师",{"key":30,"text":43,"correct":22},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1124944,"下列（ ）不属于质量保证计划中，明确质量目标的内容。",[546,548,550,552],{"key":20,"text":547,"correct":22},"贯彻执行企业的质量目标",{"key":24,"text":549,"correct":32},"制定项目部人员培训计划",{"key":27,"text":551,"correct":22},"确定质量目标及分解目标",{"key":30,"text":553,"correct":22},"兑现投标书的质量承诺",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":30,"analysis":33},1124945,"质量保证计划不包括（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"明确质量目标",{"key":24,"text":561,"correct":22},"质量管理措施",{"key":27,"text":563,"correct":22},"质量管理流程",{"key":30,"text":565,"correct":32},"质量事故预防",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},1124946,"单位工程、分部工程和分项工程开工前，项目技术负责人对承担施工的负责人或分包方（ ）进行书面技术交底。",[570,572,574,576],{"key":20,"text":571,"correct":22},"生产人员",{"key":24,"text":573,"correct":22},"技术人员",{"key":27,"text":575,"correct":32},"全体人员",{"key":30,"text":577,"correct":22},"管理人员",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1124947,"应建立以（ ）为首的质量保证体系与组织机构。",[582,583,584,585],{"key":20,"text":323,"correct":32},{"key":24,"text":325,"correct":22},{"key":27,"text":540,"correct":22},{"key":30,"text":586,"correct":22},"建设单位技术负责人",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},1124948,"单位工程、分部工程和分项工程开工前，应由（ ）对承担施工的负责人或分包方全体人员进行书面技术交底。",[591,592,594,595],{"key":20,"text":323,"correct":22},{"key":24,"text":593,"correct":22},"项目生产负责人",{"key":27,"text":325,"correct":32},{"key":30,"text":596,"correct":22},"项目质量负责人",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},1124949,"在施工过程中，（ ）对施工方案、技术措施及设计变更要求等，应在执行前进行书面交底。",[601,602,603,604],{"key":20,"text":325,"correct":32},{"key":24,"text":323,"correct":22},{"key":27,"text":586,"correct":22},{"key":30,"text":540,"correct":22},[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]