[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,7,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,163,175,187,199,211,223,235,244,256,268,280,292,304,316,328,340,352,364,376,388,399,411,423,435,447,459,468,480,492,504,516,528,540,552,564,575,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1124780,1,"单选题","土的孔隙比指的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","土粒体积之比与土的孔隙体积",false,{"key":24,"text":25,"correct":26},"B","土的孔隙体积与土粒体积之比",true,{"key":28,"text":29,"correct":22},"C","土粒体积之比与土中水的体积",{"key":31,"text":32,"correct":22},"D","土中水的体积与土粒体积之比","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1124781,"在土中放入抗拉强度高的补强材料形成复合路基的处理方式属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"土质改良",{"key":24,"text":41,"correct":22},"土的置换",{"key":28,"text":43,"correct":26},"土的补强",{"key":31,"text":45,"correct":22},"土的固结",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1124782,"路基工程中，新建的地下管线施工必须依照（ ）的原则进行。",[50,52,54,56],{"key":20,"text":51,"correct":22},"先地下，后地上，先浅后深",{"key":24,"text":53,"correct":22},"先地上，后地下，先深后浅",{"key":28,"text":55,"correct":22},"先地上，后地下，先浅后深",{"key":31,"text":57,"correct":26},"先地下，后地上，先深后浅",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1124783,"新建地下管线施工时，应按“（ ）”的原则施工。",[62,64,66,68],{"key":20,"text":63,"correct":22},"先地下后地上",{"key":24,"text":65,"correct":22},"先地上后地下、先浅后深",{"key":28,"text":67,"correct":26},"先地下后地上、先深后浅",{"key":31,"text":69,"correct":22},"先深后浅",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1124784,"施工控制桩放线测量是建立测量控制网，（ ），补钉转角桩、路两侧外边桩、增设临时水准点等。",[74,76,78,80],{"key":20,"text":75,"correct":22},"选择测量仪器",{"key":24,"text":77,"correct":26},"恢复中线",{"key":28,"text":79,"correct":22},"计算测量数据",{"key":31,"text":81,"correct":22},"埋设地下管线",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1124785,"对路基产生“弹簧”且急于赶工的路段，可以采取( )的措施。",[86,88,90,92],{"key":20,"text":87,"correct":22},"增大压实机具功率",{"key":24,"text":89,"correct":26},"掺生石灰粉翻拌",{"key":28,"text":91,"correct":22},"适量洒水",{"key":31,"text":93,"correct":22},"掺碎石翻拌",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1124786,"沥青混凝土混合料人工摊铺系数为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"1.15～1.35",{"key":24,"text":101,"correct":22},"1.15～1.30",{"key":28,"text":103,"correct":22},"1.20～1.45",{"key":31,"text":105,"correct":26},"1.25～1.50",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1124787,"混凝土面板施工，采用人工摊铺混凝土施工时，摊铺厚度达到混凝土板厚的（ ）时，应拔出模内钢钎，并填实钎孔。",[110,112,114,116],{"key":20,"text":111,"correct":22},"1\u002F3",{"key":24,"text":113,"correct":26},"2\u002F3",{"key":28,"text":115,"correct":22},"1\u002F2",{"key":31,"text":117,"correct":22},"3\u002F4",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1124788,"沥青混合料面层压实成型施工时，沥青混凝土路面压实层厚度不宜大于（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"100mm",{"key":24,"text":125,"correct":22},"150mm",{"key":28,"text":127,"correct":22},"200mm",{"key":31,"text":129,"correct":22},"300mm",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1124789,"改性沥青的生产过程中，间歇式拌合机宜备有保温性能好的成品储料仓，贮存过程中混合料温降不得大于（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"10℃",{"key":24,"text":137,"correct":22},"15℃",{"key":28,"text":139,"correct":22},"20℃",{"key":31,"text":141,"correct":22},"25℃",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1124790,"改性沥青混合料初压开始温度不低于（ ），碾压终了温度应不低于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"150℃，80℃",{"key":24,"text":149,"correct":26},"150℃，90℃",{"key":28,"text":151,"correct":22},"180℃，80℃",{"key":31,"text":153,"correct":22},"180℃，90℃",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1124791,"当水泥混凝土面层铺装厚度小于（ ）时，可采用振动梁。",[158,159,160,162],{"key":20,"text":125,"correct":26},{"key":24,"text":127,"correct":22},{"key":28,"text":161,"correct":22},"250mm",{"key":31,"text":129,"correct":22},{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1124792,"水泥混凝土路面高温施工时，混凝土拌合物的初凝时间不得小于（ ）h。",[167,169,171,173],{"key":20,"text":168,"correct":22},"2",{"key":24,"text":170,"correct":26},"3",{"key":28,"text":172,"correct":22},"4",{"key":31,"text":174,"correct":22},"5",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1124793,"在混凝土达到设计弯拉强度（ ）%以后，可允许行人通行。",[179,181,183,185],{"key":20,"text":180,"correct":22},"20",{"key":24,"text":182,"correct":26},"40",{"key":28,"text":184,"correct":22},"60",{"key":31,"text":186,"correct":22},"100",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1124794,"高温施工时，混凝土拌合物的初凝时间不得小于（ ）h，低温施工时，终凝时间不得大于（ ）h。",[191,193,195,197],{"key":20,"text":192,"correct":26},"3，10",{"key":24,"text":194,"correct":22},"2，10",{"key":28,"text":196,"correct":22},"3，12",{"key":31,"text":198,"correct":22},"2，12",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1124795,"沥青混合料面层施工中，1台摊铺机的铺筑宽度不宜超过（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"3米",{"key":24,"text":206,"correct":22},"4米",{"key":28,"text":208,"correct":22},"5米",{"key":31,"text":210,"correct":26},"6米",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1124796,"改性沥青混合料拌合时，间歇式拌合机每盘的干拌时间不少于（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"5～15s",{"key":24,"text":218,"correct":26},"5～10s",{"key":28,"text":220,"correct":22},"15～30s",{"key":31,"text":222,"correct":22},"10～30s",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1124797,"在沥青混合料面层运输与布料施工中，运料车应在摊铺机前（ ）处空挡等候，被摊铺机缓缓顶推前进并逐步卸料，避免撞击摊铺机。",[227,229,231,233],{"key":20,"text":228,"correct":22},"50cm",{"key":24,"text":230,"correct":26},"30cm",{"key":28,"text":232,"correct":22},"80cm",{"key":31,"text":234,"correct":22},"100cm",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1124798,"热拌沥青混合料面层纵缝应采用热接缝，上下层的纵缝应错开（ ）以上。",[239,241,242,243],{"key":20,"text":240,"correct":22},"50mm",{"key":24,"text":123,"correct":22},{"key":28,"text":125,"correct":26},{"key":31,"text":127,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1124799,"现行《城市道路设计规范》规定，以（ ）龄期的水泥混凝土弯拉强度控制面层混凝土的强度。",[248,250,252,254],{"key":20,"text":249,"correct":22},"7d",{"key":24,"text":251,"correct":22},"14d",{"key":28,"text":253,"correct":22},"21d",{"key":31,"text":255,"correct":26},"28d",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1124800,"适用于支路、停车场罩面的稀浆封层规格是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":26},"ES-1",{"key":24,"text":263,"correct":22},"ES-2",{"key":28,"text":265,"correct":22},"ES-3",{"key":31,"text":267,"correct":22},"ES-4",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1124801,"混凝土配合比设计中，严寒地区路面混凝土的抗冻等级不宜小于（ ），寒冷地区不宜小于（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"F100，F150",{"key":24,"text":275,"correct":22},"F150，F150",{"key":28,"text":277,"correct":22},"F200，F200",{"key":31,"text":279,"correct":26},"F250，F200",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1124802,"下列关于冬期沥青混合料面层施工的说法描述错误的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"城镇快速路、主干路的沥青混合料面层严禁冬期施工",{"key":24,"text":287,"correct":26},"次干路及透粘封层在施工温度低于5℃时应停止施工",{"key":28,"text":289,"correct":22},"快卸、快铺、快平，及时碾压、及时成型",{"key":31,"text":291,"correct":22},"适当提高拌合、出厂及施工时的温度",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1124803,"水泥砼路面灌填缝料表述错误的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"缝壁必须湿润.清洁",{"key":24,"text":299,"correct":22},"常温施工时缝料宜与板面平",{"key":28,"text":301,"correct":22},"冬期施工时缝料应填为凹液面",{"key":31,"text":303,"correct":22},"填缝料养护期间应封闭交通",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1124804,"水泥混凝土搅拌过程中，不属于应进行检验和控制以符合质量标准要求的技术指标是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"离析",{"key":24,"text":311,"correct":26},"砂率",{"key":28,"text":313,"correct":22},"视密度",{"key":31,"text":315,"correct":22},"含气量",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":28,"analysis":33},1124805,"引气剂与减水剂或高效减水剂等外加剂复配在同一水溶液中时，不得发生（ ）现象。",[320,322,324,326],{"key":20,"text":321,"correct":22},"冒气泡",{"key":24,"text":323,"correct":22},"反应",{"key":28,"text":325,"correct":26},"絮凝",{"key":31,"text":327,"correct":22},"沉淀",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":28,"analysis":33},1124806,"水泥混凝土路面浇筑完成后应及时养护，不宜采用的养护方式为（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"喷洒养护剂",{"key":24,"text":335,"correct":22},"保湿覆盖",{"key":28,"text":337,"correct":26},"围水养护",{"key":31,"text":339,"correct":22},"洒水养护",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1124807,"密级配沥青混合料复压宜优先采用（ ）进行碾压，其总质量不宜小于（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"轻型轮胎压路机，12t",{"key":24,"text":347,"correct":26},"重型轮胎压路机，25t",{"key":28,"text":349,"correct":22},"三轮钢筒式压路机，12t",{"key":31,"text":351,"correct":22},"重型轮胎压路机，12t",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1124808,"在沥青混合料面层施工，在铺筑沥青混合料面层前，应在基层表面喷洒（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"水",{"key":24,"text":359,"correct":26},"透层油",{"key":28,"text":361,"correct":22},"粘层油",{"key":31,"text":363,"correct":22},"隔离剂",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1124809,"SMA沥青混合料面层施工时，不宜采用（ ）碾压。",[368,370,372,374],{"key":20,"text":369,"correct":22},"小型振动压路机",{"key":24,"text":371,"correct":22},"钢筒式压路机",{"key":28,"text":373,"correct":22},"振动压路机",{"key":31,"text":375,"correct":26},"轮胎压路机",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1124810,"设置在沥青混凝土加铺层与旧水泥混凝土路面之间的应力消减层具有（ ）的效果。",[380,382,384,386],{"key":20,"text":381,"correct":26},"延缓和抑制反射裂缝",{"key":24,"text":383,"correct":22},"防止网裂",{"key":28,"text":385,"correct":22},"延缓车辙",{"key":31,"text":387,"correct":22},"抑制横向裂缝",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1124811,"水泥混凝土路面表述错误的是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"宜采用钢模板",{"key":24,"text":395,"correct":26},"可以在基层上挖槽嵌入模板",{"key":28,"text":397,"correct":22},"模板接头应粘贴胶带或塑料薄膜等密封",{"key":31,"text":303,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":28,"analysis":33},1124812,"关于水泥混凝土路面病害处理的做法正确的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"凿除路面板边角破损部分时，如有钢筋应予以割断",{"key":24,"text":406,"correct":22},"新.旧路面板间可不涂界面剂，直接加铺",{"key":28,"text":408,"correct":26},"路面发生板桩网状开裂时应将整个板全部凿除",{"key":31,"text":410,"correct":22},"基面清理后可用砂浆混凝土进行灌注",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},1124813,"关于普通混凝土路面胀缝施工技术要求，错误的是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"胀缝应与路面中心线垂直",{"key":24,"text":418,"correct":22},"缝壁必须垂直",{"key":28,"text":420,"correct":22},"缝宽必须一致，缝中不得连浆",{"key":31,"text":422,"correct":26},"缝上部安装胀缝板和传力杆",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1124814,"以下关于沥青混合料碾压说法正确是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"终压应振动压路机，紧接在复压后进行",{"key":24,"text":430,"correct":26},"初压宜采用静压压路机，紧跟摊铺机后进行",{"key":28,"text":432,"correct":22},"复压应紧跟在初压后开始，对密级配沥青混合料宜优先采用振动压路机",{"key":31,"text":434,"correct":22},"复压应紧跟在初压后开始，对较大粒径的混合料宜优先采用重型轮胎压机路",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},1124815,"在采用搭接法施工的土工合成材料中，为了保证材料的整体性，搭接长度宜为（ ）米。",[439,441,443,445],{"key":20,"text":440,"correct":22},"0.1～0.3",{"key":24,"text":442,"correct":22},"0.2～0.5",{"key":28,"text":444,"correct":26},"0.3～0.9",{"key":31,"text":446,"correct":22},"0.5～0.9",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1124816,"二灰混合料基层摊铺施工应在第一次重冰冻到来之前（ ）完成。",[451,453,455,457],{"key":20,"text":452,"correct":22},"0.5～1.0个月",{"key":24,"text":454,"correct":26},"1.0～1.5个月",{"key":28,"text":456,"correct":22},"1.5～2.0个月",{"key":31,"text":458,"correct":22},"2.0～2.5个月",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":31,"analysis":33},1124817,"常温季节，石灰土基层需洒水养护（ ），养护期应封闭交通。",[463,464,465,466],{"key":20,"text":255,"correct":22},{"key":24,"text":253,"correct":22},{"key":28,"text":251,"correct":22},{"key":31,"text":467,"correct":26},"直至上层结构施工为止",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":28,"analysis":33},1124818,"二灰土的（ ）比石灰土高得多。",[472,474,476,478],{"key":20,"text":473,"correct":22},"板体性",{"key":24,"text":475,"correct":22},"水稳性",{"key":28,"text":477,"correct":26},"抗冻性",{"key":31,"text":479,"correct":22},"力学性能",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},1124819,"在级配碎石基层摊铺施工时，混合料出现梅花现象，应（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"掺加减水剂",{"key":24,"text":487,"correct":22},"添加水泥",{"key":28,"text":489,"correct":22},"废弃",{"key":31,"text":491,"correct":26},"及时翻拌均匀",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},1124820,"下列不属于土工合成材料用途的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"路堤加筋",{"key":24,"text":499,"correct":22},"过滤与排水",{"key":28,"text":501,"correct":22},"路基防护",{"key":31,"text":503,"correct":26},"减少路基与构造物之间的不均匀沉降",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1124821,"关于级配碎石基层，下列说法不正确的是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"碾压前应先适量洒水",{"key":24,"text":511,"correct":22},"运输中应采取防止水分蒸发措施",{"key":28,"text":513,"correct":22},"宜采用机械摊铺",{"key":31,"text":515,"correct":26},"未铺装面层前可以开放交通",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},1124822,"下面关于水泥稳定土说法错误的是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"宜在春末和气温较高季节施工，施工期的日最低气温应在5℃以上",{"key":24,"text":523,"correct":22},"下雨时停止施工，已摊铺的水泥稳定土结构层应尽快碾压密实",{"key":28,"text":525,"correct":26},"应在混合料处于最佳含水量±5%时进行碾压",{"key":31,"text":527,"correct":22},"压实成活后立即洒水养护，保持湿润",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1124823,"在石灰稳定土基层压实施工中，直线和不设超高的平曲线段，压实应（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"由中心向两侧碾压",{"key":24,"text":535,"correct":26},"由两侧向中心碾压",{"key":28,"text":537,"correct":22},"由内侧向外侧碾压",{"key":31,"text":539,"correct":22},"由外侧向内侧碾压",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1124824,"关于水泥稳定土基层的说法，错误的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"有良好的板体性",{"key":24,"text":547,"correct":26},"初期强度比石灰土低",{"key":28,"text":549,"correct":22},"低温时会冷缩",{"key":31,"text":551,"correct":22},"水稳性比石灰土好",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},1124825,"下列关于雨期基层施工的说法描述错误的是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"应坚持拌多少、铺多少、压多少、完成多少",{"key":24,"text":559,"correct":22},"下雨来不及完成时，要尽快碾压，防止雨水渗透",{"key":28,"text":561,"correct":26},"分段开挖，切忌全面开挖或挖段过长",{"key":31,"text":563,"correct":22},"降雨时应停止施工，已摊铺的水泥混合料尽快碾压密实",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},1124826,"用于城镇快速路、主干路的沥青表面层粗集料的压碎层不大于（ ）%。",[568,570,571,573],{"key":20,"text":569,"correct":22},"18",{"key":24,"text":180,"correct":22},{"key":28,"text":572,"correct":26},"26",{"key":31,"text":574,"correct":22},"30",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":24,"analysis":33},1124827,"快速路的双向机动车道数不少于（ ）条。",[579,580,581,583],{"key":20,"text":168,"correct":22},{"key":24,"text":172,"correct":26},{"key":28,"text":582,"correct":22},"6",{"key":31,"text":584,"correct":22},"8",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},1124828,"现行《城市道路工程设计规范》CJJ37—2012 规定，面层水泥混凝土的抗弯拉强度不得低于（ ）MPa，快速路、主干路和重交通的其他道路的抗弯拉强度不得低于（ ）MPa。",[589,591,593,595],{"key":20,"text":590,"correct":22},"3.5，4.5",{"key":24,"text":592,"correct":22},"4.0，5.0",{"key":28,"text":594,"correct":22},"4.0，4.5",{"key":31,"text":596,"correct":26},"4.5，5.0",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":28,"analysis":33},1124829,"重交通的水泥混凝土面层的抗弯拉强度不得低于（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"4.0MPa",{"key":24,"text":604,"correct":22},"4.5MPa",{"key":28,"text":606,"correct":26},"5.0MPa",{"key":31,"text":608,"correct":22},"2.0MPa",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]