[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-57":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":673},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,57,50,2846,[13,38,53,68,83,97,112,126,140,155,170,184,199,213,228,242,256,270,284,298,312,326,340,354,369,383,397,411,426,440,454,468,482,496,510,521,535,549,563,577,591,605,619,632,644,658],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1127416,2,"多选题","任何单位和个人都不得擅自破坏绿化规划用地的（）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","地形",true,{"key":24,"text":25,"correct":22},"B","地貌",{"key":27,"text":28,"correct":29},"C","建筑",false,{"key":31,"text":32,"correct":22},"D","水体",{"key":34,"text":35,"correct":22},"E","植被","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1127417,"根据《城市桥梁工程施工与质量验收规范》CJJ 2—2008，关于工程施工质量验收的说法，正确的有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"工程施工质量应符合相关规范的规定",{"key":24,"text":45,"correct":22},"参加工程施工质量验收的人员应具备规定的资格",{"key":27,"text":47,"correct":22},"只有具备相应检测资质的单位才能承担见证取样检测业务",{"key":31,"text":49,"correct":29},"隐蔽工程验收可在下道工序开始后组织",{"key":34,"text":51,"correct":29},"对涉及结构安全和使用功能的分部工程应进行100%检测","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1127418,"对供热管道焊接施工单位提供的焊接设备的要求是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"符合焊接工艺要求",{"key":24,"text":60,"correct":29},"精度等级符合要求",{"key":27,"text":62,"correct":22},"性能稳定可靠",{"key":31,"text":64,"correct":29},"灵敏度可靠",{"key":34,"text":66,"correct":29},"配备相应的操作工","AC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1127419,"正确填写市政公用工程注册建造师签章文件表格的要求有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"表格中“致××单位”，写该单位简称",{"key":24,"text":75,"correct":22},"表格中的工程名称与工程合同的工程名称一致",{"key":27,"text":77,"correct":22},"表格中工程地址应填写清楚，并与工程合同一致",{"key":31,"text":79,"correct":22},"表格中分部(子分部)、分项工程必须按专业工程的规定填写",{"key":34,"text":81,"correct":22},"审查、审核、验收意见或者检查结果，必须用明确的定性文字写明基本情况和结论","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},1127420,"城市桥梁工程包括（ ）的建设、养护与维修工程。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"立交桥",{"key":24,"text":90,"correct":22},"跨线桥",{"key":27,"text":92,"correct":29},"轻轨交通线下工程",{"key":31,"text":94,"correct":22},"地下人行通道",{"key":34,"text":96,"correct":22},"人行天桥",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1127421,"城市公共广场工程包括（ ）的建设与维修工程。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"城市公共广场",{"key":24,"text":104,"correct":29},"地下停车场",{"key":27,"text":106,"correct":22},"地面停车场",{"key":31,"text":108,"correct":22},"人行广场",{"key":34,"text":110,"correct":22},"体育场","ACDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":111,"analysis":37},1127422,"关于给水排水管道工程施工质量控制的说法，符合规范的有（）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"各分项工程应按照施工技术标准进行质量控制",{"key":24,"text":119,"correct":29},"每分项工程完成后可进行检验",{"key":27,"text":121,"correct":22},"相关各分项工程之间必须进行交接检验",{"key":31,"text":123,"correct":22},"所有隐蔽分项工程必须进行隐蔽验收",{"key":34,"text":125,"correct":22},"未经检验或验收不合格不得进行下道分项工程",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":67,"analysis":37},1127423,"无压管道在（）合格后应及时回填。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"闭水试验",{"key":24,"text":133,"correct":29},"水压试验",{"key":27,"text":135,"correct":22},"闭气试验",{"key":31,"text":137,"correct":29},"预试验",{"key":34,"text":139,"correct":29},"主试验",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1127424,"供热管道焊接施工单位应有负责焊接工艺的焊接（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"技术人员",{"key":24,"text":147,"correct":29},"负责人",{"key":27,"text":149,"correct":22},"检查人员",{"key":31,"text":151,"correct":29},"焊工",{"key":34,"text":153,"correct":22},"检验人员","ACE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1127425,"按照二级建造师(市政公用工程)执业管理办法规定，城镇道路工程包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"城市环路养护工程",{"key":24,"text":162,"correct":22},"城市主干路建设工程",{"key":27,"text":164,"correct":22},"城市快速路建设工程",{"key":31,"text":166,"correct":22},"城市次干路养护工程",{"key":34,"text":168,"correct":29},"城际间公路维修工程","ABCD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":52,"analysis":37},1127426,"注册建造师在市政公用工程管理文件中的规范签章要求是（）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"在配套表格中“施工项目负责人(签章)处”",{"key":24,"text":177,"correct":22},"签字",{"key":27,"text":179,"correct":22},"同时盖上注册执业建造师的专用章",{"key":31,"text":181,"correct":29},"同时盖上上级单位公章",{"key":34,"text":183,"correct":29},"同时盖上项目经理部章",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1127427,"城市(镇)供水工程(含中水工程)包括（ ）的建设与维修工程。",[188,190,192,194,196],{"key":20,"text":189,"correct":29},"抽升站",{"key":24,"text":191,"correct":29},"检查井",{"key":27,"text":193,"correct":22},"水源取水设施",{"key":31,"text":195,"correct":22},"水处理厂",{"key":34,"text":197,"correct":22},"供水管道","CDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":67,"analysis":37},1127428,"建设工程管理文件有效的必要条件是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"符合资格要求的注册建造师担任建设工程施工项目负责人",{"key":24,"text":206,"correct":29},"有相应项目经理资质的管理人员担任建设工程施工项目负责人",{"key":27,"text":208,"correct":22},"施工项目负责人栏内注册建造师签章完整",{"key":31,"text":210,"correct":29},"施工项目负责人栏内项目经理签章完整",{"key":34,"text":212,"correct":29},"施工单位栏内盖上级单位公章",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1127429,"招标文件一般包括:投标邀请书、投标人须知、投标文件格式及(）等。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"评标标准和方法",{"key":24,"text":220,"correct":22},"工程量清单",{"key":27,"text":222,"correct":22},"合同主要条款",{"key":31,"text":224,"correct":29},"施工组织方案",{"key":34,"text":226,"correct":22},"施工图纸","ABCE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":169,"analysis":37},1127431,"投标文件一般包括()。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"投标函",{"key":24,"text":235,"correct":22},"投标报价",{"key":27,"text":237,"correct":22},"施工组织设计",{"key":31,"text":239,"correct":22},"施工方案",{"key":34,"text":241,"correct":29},"投标文件目录",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":111,"analysis":37},1127433,"关于投标文件制作的注意事项，正确的有()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"投标文件装帧后，应按照评标办法否决评审条款逐条对照检查",{"key":24,"text":249,"correct":29},"报价文件是否精美",{"key":27,"text":251,"correct":22},"商务文件应避免电子文件与书面文件发生差异",{"key":31,"text":253,"correct":22},"投标文件密封包装应按照招标文件的要求",{"key":34,"text":255,"correct":22},"电子文件应保证能在开标会上顺利打开",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":198,"analysis":37},1127434,"关于施工图预算对施工单位的作用的说法，正确的有()。",[260,262,264,266,268],{"key":20,"text":261,"correct":29},"是控制施工图设计不突破设计概算的重要措施",{"key":24,"text":263,"correct":29},"是计算招标控制价的重要参考依据",{"key":27,"text":265,"correct":22},"是建筑施工单位投标报价的基础",{"key":31,"text":267,"correct":22},"是进行“两算”对比的依据",{"key":34,"text":269,"correct":22},"是施工企业安排调配施工力量、组织材料供应的依据",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":169,"analysis":37},1127435,"在工程实施阶段现场确认实际工程数量时应重点关注的是（）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"项目具体实施工艺与原招标清单特征描述的差异",{"key":24,"text":277,"correct":22},"原招标图与施工图之间的工程量差异",{"key":27,"text":279,"correct":22},"工程内容特征的差异",{"key":31,"text":281,"correct":22},"原招标现场与实施现场的差异",{"key":34,"text":283,"correct":29},"找出招标人提供的工程量清单中的漏洞",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":169,"analysis":37},1127436,"下列设施中属于安全技术设施的有()。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"防护装置",{"key":24,"text":291,"correct":22},"信号装置",{"key":27,"text":293,"correct":22},"消防设施",{"key":31,"text":295,"correct":22},"防触电设施",{"key":34,"text":297,"correct":29},"除尘设备",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":227,"analysis":37},1127437,"下列设施中属于职业卫生设施的有()",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"通风换气装置",{"key":24,"text":305,"correct":22},"除尘设施",{"key":27,"text":307,"correct":22},"消毒设施",{"key":31,"text":309,"correct":29},"倒班休息室",{"key":34,"text":311,"correct":22},"防治辐射设施",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":111,"analysis":37},1127438,"关于项目部职业健康安全体系与安全管理体系相融合的说法，正确的有()。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"在安全管理体系文件中加人职业健康安全培训内容与要求",{"key":24,"text":319,"correct":29},"项目部职业健康安全管理方案应包含形成文件的实现安全生产目标的时间表",{"key":27,"text":321,"correct":22},"在项目部安全管理体系应急预案中加人职业健康安全管理的内容与要求",{"key":31,"text":323,"correct":22},"在项目部安全管理体系的审核和管理评审中加人职业健康安全内容",{"key":34,"text":325,"correct":22},"在专项施工安全检查和日常安全巡查中对本项目部的职业健康安全设施进行检查",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":154,"analysis":37},1127439,"下列选项中，属于环境管理培训的内容有()。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"环境管理目标",{"key":24,"text":333,"correct":29},"特种作业人员培训",{"key":27,"text":335,"correct":22},"环境管理法规",{"key":31,"text":337,"correct":29},"职业健康安全意识",{"key":34,"text":339,"correct":22},"环境管理岗位职责",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":82,"analysis":37},1127440,"施工项目合同管理主要内容之一是依《合同法》规定进行()工作。",[344,346,348,350,352],{"key":20,"text":345,"correct":29},"工程洽商",{"key":24,"text":347,"correct":22},"变更",{"key":27,"text":349,"correct":22},"转让",{"key":31,"text":351,"correct":22},"终止",{"key":34,"text":353,"correct":22},"解除",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},1127441,"关于劳务分包管理的叙述，正确的有()。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"劳务分包应实施实名制管理",{"key":24,"text":361,"correct":29},"项目总包必须设置专职劳务管理员",{"key":27,"text":363,"correct":29},"分包方必须设置兼职劳务管理员",{"key":31,"text":365,"correct":22},"劳务管理员须参加各单位统一组织的上岗培训",{"key":34,"text":367,"correct":22},"地方要求实行劳务管理员持证上岗的，劳务管理员要遵守","ADE",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":36,"analysis":37},1127442,"关于施工过程中的合同变更，正确的有()。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"标高、基线、尺寸变更",{"key":24,"text":376,"correct":22},"工程量增减",{"key":27,"text":378,"correct":29},"施工机械内部调整",{"key":31,"text":380,"correct":22},"质量及特性变更",{"key":34,"text":382,"correct":22},"施工顺序变化",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":368,"analysis":37},1127443,"承包方必须掌握有关法律政策和索赔知识，遵守工程索赔的处理原则：()。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"有正当索赔理由和充分证据",{"key":24,"text":390,"correct":29},"遵循索赔程序",{"key":27,"text":392,"correct":29},"及时向发包方发出索赔申请",{"key":31,"text":394,"correct":22},"以合同为依据",{"key":34,"text":396,"correct":22},"准确、合理地记录索赔事和计算工期、费用",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":67,"analysis":37},1127444,"施工过程中承包方的索赔要求最终归结为()索赔。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"工期",{"key":24,"text":404,"correct":29},"工程量",{"key":27,"text":406,"correct":22},"费用",{"key":31,"text":408,"correct":29},"拆迁拖延",{"key":34,"text":410,"correct":29},"材料涨价幅度超过合同约定",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":425,"analysis":37},1127445,"下列合同风险中，属于按风险来源性质划分的有()。",[415,417,419,421,423],{"key":20,"text":416,"correct":29},"国别风险",{"key":24,"text":418,"correct":22},"商务风险",{"key":27,"text":420,"correct":22},"政治风险",{"key":31,"text":422,"correct":22},"经济风险",{"key":34,"text":424,"correct":29},"项目风险","BCD",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":111,"analysis":37},1127446,"合同风险的规避措施有()。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"增设保值条款",{"key":24,"text":433,"correct":29},"向分包商转移",{"key":27,"text":435,"correct":22},"增设风险合同条款",{"key":31,"text":437,"correct":22},"加强索赔管理",{"key":34,"text":439,"correct":22},"增设有关支付条款",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":154,"analysis":37},1127447,"一般施工合同均分为()等部分。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"通用条款",{"key":24,"text":447,"correct":29},"施工规范",{"key":27,"text":449,"correct":22},"协议书",{"key":31,"text":451,"correct":29},"验收标准",{"key":34,"text":453,"correct":22},"专用条款",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":169,"analysis":37},1127448,"施工索赔引起的原因可能有()。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"延期发出图纸产生的索赔",{"key":24,"text":461,"correct":22},"恶劣的气候条件导致的索赔",{"key":27,"text":463,"correct":22},"工程变更导致的索赔",{"key":31,"text":465,"correct":22},"由外部环境而引起的索赔",{"key":34,"text":467,"correct":29},"项目部人员调整",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":169,"analysis":37},1127449,"索赔过程中的28d时效规定，适用于索赔程序中的()过程。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"承包人提出索赔申请",{"key":24,"text":475,"correct":22},"承包人提出索赔报告和相关证据资料",{"key":27,"text":477,"correct":22},"监理工程师和业主审核承包人的索赔申请",{"key":31,"text":479,"correct":22},"索赔事件终了承包人提供最终索赔报告",{"key":34,"text":481,"correct":29},"发包人审批监理工程师的索赔处理证明",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":169,"analysis":37},1127450,"索赔申请表应填写的内容有()。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"索赔依据",{"key":24,"text":489,"correct":22},"索赔项目",{"key":27,"text":491,"correct":22},"索赔金额和日期",{"key":31,"text":493,"correct":22},"证明文件",{"key":34,"text":495,"correct":29},"索赔事件的起因、经过和结束的详细描述",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":169,"analysis":37},1127451,"施工索赔同期记录的内容包括()。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"人员设备闲置清单",{"key":24,"text":503,"correct":22},"对工期的延误",{"key":27,"text":505,"correct":22},"对工程损害程度",{"key":31,"text":507,"correct":22},"导致费用增加的项目",{"key":34,"text":509,"correct":29},"计算资料",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":169,"analysis":37},1127452,"从合同风险的来源性质分，有()。",[514,515,516,518,520],{"key":20,"text":420,"correct":22},{"key":24,"text":422,"correct":22},{"key":27,"text":517,"correct":22},"技术风险",{"key":31,"text":519,"correct":22},"公共关系风险",{"key":34,"text":424,"correct":29},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":425,"analysis":37},1127454,"下列选项中，会计来核算的优点有( )。",[525,527,529,531,533],{"key":20,"text":526,"correct":29},"逻辑性不强",{"key":24,"text":528,"correct":22},"核算严密",{"key":27,"text":530,"correct":22},"人为调教的因素较小",{"key":31,"text":532,"correct":22},"核算范围较大",{"key":34,"text":534,"correct":29},"核算范围较小",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":36,"analysis":37},1127456,"关于施工成本分析任务的说法，正确的有( )。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"找出产生差异的原因",{"key":24,"text":542,"correct":22},"提出进一步降低成本的措施和方案",{"key":27,"text":544,"correct":29},"对尚未或正在发生的经济活动进行核算",{"key":31,"text":546,"correct":22},"对成本计划的执行情况进行正确评价",{"key":34,"text":548,"correct":22},"正确计算成本计划的执行结果，计算产生的差异",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":82,"analysis":37},1127458,"关于施工成本管理措施，正确的有( )。",[553,555,557,559,561],{"key":20,"text":554,"correct":29},"加强管理观念",{"key":24,"text":556,"correct":22},"加强定额和预算管理",{"key":27,"text":558,"correct":22},"完善原始记录和统计工作",{"key":31,"text":560,"correct":22},"建立考核和激励机制",{"key":34,"text":562,"correct":22},"建立健全责任制度",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":368,"analysis":37},1127461,"关于施工成本管理主要内容的说法，正确的有( )。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"降低成本",{"key":24,"text":570,"correct":29},"缩短工期",{"key":27,"text":572,"correct":29},"建立业务考核制度",{"key":31,"text":574,"correct":22},"在控制目标成本情况下，开源节流，向管理要效益，靠管理求生存和发展",{"key":34,"text":576,"correct":22},"在企业和项目管理体系中建立成本管理责任制和激励机制",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":36,"analysis":37},1127463,"项目施工成本目标控制的原则包括（）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"成本最低化",{"key":24,"text":584,"correct":22},"全员成本管理",{"key":27,"text":586,"correct":29},"分层统一",{"key":31,"text":588,"correct":22},"动态控制",{"key":34,"text":590,"correct":22},"责权利相结合",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":82,"analysis":37},1127466,"成本分析的方法有()。",[595,597,599,601,603],{"key":20,"text":596,"correct":29},"动态控制法",{"key":24,"text":598,"correct":22},"因素分析法",{"key":27,"text":600,"correct":22},"差额计算法",{"key":31,"text":602,"correct":22},"比较法",{"key":34,"text":604,"correct":22},"比率法",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":154,"analysis":37},1127469,"关于施工成本目标控制的原则，正确的有( )。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"成本最低原则",{"key":24,"text":612,"correct":29},"实用性原则",{"key":27,"text":614,"correct":22},"全员成本原则",{"key":31,"text":616,"correct":29},"开拓性原则",{"key":34,"text":618,"correct":22},"目标分解原则",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":36,"analysis":37},1127471,"关于施工成本管理组织机构设置的要求，正确的有( )。",[623,625,627,629,630],{"key":20,"text":624,"correct":22},"适应变化",{"key":24,"text":626,"correct":22},"高效精干",{"key":27,"text":628,"correct":29},"开拓创新",{"key":31,"text":586,"correct":22},{"key":34,"text":631,"correct":22},"业务系统化",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":227,"analysis":37},1127474,"关于选用施工成本管理方法应遵循的原则，正确的有( )。",[636,637,638,640,642],{"key":20,"text":612,"correct":22},{"key":24,"text":616,"correct":22},{"key":27,"text":639,"correct":22},"灵活性原则",{"key":31,"text":641,"correct":29},"统一性原则",{"key":34,"text":643,"correct":22},"坚定性原则",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":82,"analysis":37},1127477,"关于按施工图预算实行“以收定支”的具体方法，正确的有( )。",[648,650,652,654,656],{"key":20,"text":649,"correct":29},"项目部与施工队签订劳务合同时，应将人工费单价定在预算定额以下",{"key":24,"text":651,"correct":22},"材料管理人员应以预算价格来控制地方材料的采购成本",{"key":27,"text":653,"correct":22},"以周转设备预算收费的总量来控制实际发生的周转设备使用费的总量",{"key":31,"text":655,"correct":22},"用施工图预算的机械使用费和机械费补贴来控制机械费支出。",{"key":34,"text":657,"correct":22},"构件加工费和分包工程费特别要坚持“以施工图预算控制合同金额”的原则",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":672,"analysis":37},1127479,"下列选项中，属于按成本项目进行成本分析的内容有( )。",[662,664,666,668,670],{"key":20,"text":663,"correct":29},"施工索赔分析",{"key":24,"text":665,"correct":29},"成本盈亏异常分析",{"key":27,"text":667,"correct":22},"人工费分析",{"key":31,"text":669,"correct":29},"分部分项工程分析",{"key":34,"text":671,"correct":22},"材料费分析","CE",[674,678,681,684,687,690],{"id":675,"name":676,"category":7,"favorite":677},1,"领导干部任职前廉政法规知识测试题",92,{"id":679,"name":680,"category":7,"favorite":675},595,"建筑结构与设备",{"id":682,"name":683,"category":7,"favorite":675},715,"招标采购专业知识与法律法规",{"id":685,"name":686,"category":7,"favorite":675},848,"市政方向-通用基础",{"id":688,"name":689,"category":7,"favorite":8},534,"BIM工程师",{"id":691,"name":689,"category":7,"favorite":8},535]