[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-50":3},{"library":4,"page":9,"limit":9,"total":10,"questions":11,"related":709},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,50,2846,[12,37,52,67,81,96,110,123,138,152,167,181,196,211,223,237,251,265,279,294,308,322,336,351,365,380,394,405,419,431,440,455,464,473,487,501,514,528,542,556,571,585,599,613,627,641,656,670,681,695],{"id":13,"libraryId":5,"type":14,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},1127059,2,"多选题","关于地下铁道隧道工程防水设计所遵循原则的说法，正确的有( )。",[18,22,25,28,31],{"key":19,"text":20,"correct":21},"A","综合治理",true,{"key":23,"text":24,"correct":21},"B","因地制宜",{"key":26,"text":27,"correct":21},"C","刚柔结合",{"key":29,"text":30,"correct":21},"D","以防为主",{"key":32,"text":33,"correct":34},"E","防、排、截、堵并重",false,"ABCD","",{"id":38,"libraryId":5,"type":14,"typeLabel":15,"stem":39,"options":40,"answer":51,"analysis":36},1127060,"常规冻结法适用的边界条件是( )。",[41,43,45,47,49],{"key":19,"text":42,"correct":34},"土体含水量大于10%",{"key":23,"text":44,"correct":21},"土体含水量大于2.5%",{"key":26,"text":46,"correct":34},"地下水流速不大于7～9m\u002Fd",{"key":29,"text":48,"correct":21},"地下水含盐量不大于3%",{"key":32,"text":50,"correct":21},"地下水流速不大于40m\u002Fd","BDE",{"id":53,"libraryId":5,"type":14,"typeLabel":15,"stem":54,"options":55,"answer":66,"analysis":36},1127061,"可供选择的锚杆类型有( )和摩擦型锚杆。",[56,58,60,62,64],{"key":19,"text":57,"correct":21},"中空注浆锚杆",{"key":23,"text":59,"correct":21},"树脂锚杆",{"key":26,"text":61,"correct":21},"砂浆锚杆",{"key":29,"text":63,"correct":34},"树脂砂浆锚杆",{"key":32,"text":65,"correct":21},"自钻式锚杆","ABCE",{"id":68,"libraryId":5,"type":14,"typeLabel":15,"stem":69,"options":70,"answer":66,"analysis":36},1127062,"关于喷锚暗挖法施工隧道防水结构设计与施工的说法，正确的有( )。",[71,73,75,77,79],{"key":19,"text":72,"correct":21},"复合式衬砌以结构自防水为根本，辅以防水层组成防水体系",{"key":23,"text":74,"correct":21},"以接缝部位混凝土及防水层施工为防水控制的重点",{"key":26,"text":76,"correct":21},"衬砌背后、隧底设置的排水盲管（沟）应有足够的数量和过水能力断面",{"key":29,"text":78,"correct":34},"衬砌背后、隧底设置的排水盲管（沟）应与衬砌分别施工以防被堵塞",{"key":32,"text":80,"correct":21},"二次衬砌采用的补偿收缩混凝土，应具有良好的抗裂性能",{"id":82,"libraryId":5,"type":14,"typeLabel":15,"stem":83,"options":84,"answer":95,"analysis":36},1127063,"采用小导管加固时，为保证工作面稳定和掘进安全，小导管（ ）应符合设计要求。",[85,87,89,91,93],{"key":19,"text":86,"correct":21},"孔位",{"key":23,"text":88,"correct":34},"自身刚度",{"key":26,"text":90,"correct":21},"孔深",{"key":29,"text":92,"correct":34},"自身强度",{"key":32,"text":94,"correct":21},"孔径","ACE",{"id":97,"libraryId":5,"type":14,"typeLabel":15,"stem":98,"options":99,"answer":35,"analysis":36},1127064,"小导管注浆是浅埋暗挖隧道超前支护的一种措施，其应用条件有( )。",[100,102,104,106,108],{"key":19,"text":101,"correct":21},"在软弱、破碎地层中凿孔后易塌孔，且施作超前锚杆比较困难或者结构断面较大时",{"key":23,"text":103,"correct":21},"在软弱、破碎地层中凿孔时，若条件允许，可在地面进行超前注浆加固",{"key":26,"text":105,"correct":21},"超前小导管支护必须配合钢拱架使用",{"key":29,"text":107,"correct":21},"在软弱、破碎地层中凿孔时，可在导洞内对隧道周边进行径向注浆加固",{"key":32,"text":109,"correct":34},"在软弱、破碎地层中凿孔时，可在导洞内对隧道周边进行环向注浆加固",{"id":111,"libraryId":5,"type":14,"typeLabel":15,"stem":112,"options":113,"answer":35,"analysis":36},1127065,"关于小导管注浆适用条件和基本规定的说法，正确的有（）。",[114,116,118,119,121],{"key":19,"text":115,"correct":21},"在软弱、破碎地层中施作超前锚杆比较困难或者结构断面较大时宜采用",{"key":23,"text":117,"correct":21},"在条件允许时，应配合地面超前注浆加固",{"key":26,"text":105,"correct":21},{"key":29,"text":120,"correct":21},"有导洞时，可在导洞内对隧道周边进行径向注浆加固",{"key":32,"text":122,"correct":34},"有导洞时，可在导洞内对隧道周边进行环向注浆加固",{"id":124,"libraryId":5,"type":14,"typeLabel":15,"stem":125,"options":126,"answer":137,"analysis":36},1127066,"下列关于小导管注浆的要求中正确的有( )。",[127,129,131,133,135],{"key":19,"text":128,"correct":34},"小导管注浆宜采用水泥浆或水泥砂浆",{"key":23,"text":130,"correct":34},"注浆材料及其配比，根据经验选定",{"key":26,"text":132,"correct":21},"浆液必须充满钢管及周围空隙，注浆量和注浆压力应由试验确定",{"key":29,"text":134,"correct":21},"为保证灌浆质量防止漏浆，导管的尾部需设置封堵孔",{"key":32,"text":136,"correct":21},"注浆施工期应监测地下水是否受污染，应该防止注浆浆液溢出地面或超出注浆范围","CDE",{"id":139,"libraryId":5,"type":14,"typeLabel":15,"stem":140,"options":141,"answer":66,"analysis":36},1127067,"下列关于小导管注浆支护设计的要求中正确的有( )。",[142,144,146,148,150],{"key":19,"text":143,"correct":21},"钢管直径40～50mm，长3～5m",{"key":23,"text":145,"correct":21},"应选用焊接钢管或无缝钢管",{"key":26,"text":147,"correct":21},"前后两排小导管的水平支撑搭接长度不尖小于1.0m",{"key":29,"text":149,"correct":34},"根据地层条件，只能采用双层超前小导管",{"key":32,"text":151,"correct":21},"管身梅花造型布设溢浆孔",{"id":153,"libraryId":5,"type":14,"typeLabel":15,"stem":154,"options":155,"answer":166,"analysis":36},1127068,"管棚的断面形状有( )。",[156,158,160,162,164],{"key":19,"text":157,"correct":21},"方形",{"key":23,"text":159,"correct":34},"圆形",{"key":26,"text":161,"correct":21},"拱形",{"key":29,"text":163,"correct":21},"一字形",{"key":32,"text":165,"correct":21},"帽形","ACDE",{"id":168,"libraryId":5,"type":14,"typeLabel":15,"stem":169,"options":170,"answer":166,"analysis":36},1127069,"关于小导管注浆的要求，正确的有（ ）。",[171,173,175,177,179],{"key":19,"text":172,"correct":21},"在砂卵石地层中宜采用渗入注浆法",{"key":23,"text":174,"correct":34},"注浆材料配合比，应按工程条件，根据经验选定",{"key":26,"text":176,"correct":21},"注浆应由下而上、间隔对称进行",{"key":29,"text":178,"correct":21},"注浆施工期间应监测地下水是否受污染",{"key":32,"text":180,"correct":21},"防止注浆浆液溢出地面或超出注浆范围",{"id":182,"libraryId":5,"type":14,"typeLabel":15,"stem":183,"options":184,"answer":195,"analysis":36},1127070,"关于管棚施工的说法，正确的是( )。",[185,187,189,191,193],{"key":19,"text":186,"correct":21},"管棚可适用于软弱、砂砾地层",{"key":23,"text":188,"correct":21},"钢管入土端制作成尖靴状或楔形",{"key":26,"text":190,"correct":34},"管棚纵向应与隧道纵向平行",{"key":29,"text":192,"correct":21},"钢管打入后，应及时隔孔向钢管内及周围压注水泥浆或水泥砂浆",{"key":32,"text":194,"correct":34},"管棚末端应支架在坚硬土层上","ABD",{"id":197,"libraryId":5,"type":14,"typeLabel":15,"stem":198,"options":199,"answer":210,"analysis":36},1127071,"根据国内外经验，一般可采用管棚超前支护的场合有( )。",[200,202,204,206,208],{"key":19,"text":201,"correct":34},"修建小断面地下工程",{"key":23,"text":203,"correct":21},"穿越铁路修建地下工程",{"key":26,"text":205,"correct":21},"隧道洞口段施工",{"key":29,"text":207,"correct":21},"通过断层破碎带等特殊地层",{"key":32,"text":209,"correct":21},"穿越地下和地面结构物修建地下工程","BCDE",{"id":212,"libraryId":5,"type":14,"typeLabel":15,"stem":213,"options":214,"answer":35,"analysis":36},1127072,"根据国外经验，在下列场合中采用管棚超前支护的有( )。",[215,216,218,219,221],{"key":19,"text":209,"correct":21},{"key":23,"text":217,"correct":21},"修建大断面地下工程",{"key":26,"text":207,"correct":21},{"key":29,"text":220,"correct":21},"特殊地段，如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工",{"key":32,"text":222,"correct":34},"通过硬岩区段",{"id":224,"libraryId":5,"type":14,"typeLabel":15,"stem":225,"options":226,"answer":66,"analysis":36},1127073,"采用管棚超前支护施工时，对管棚所用钢管的要求有( )。",[227,229,231,233,235],{"key":19,"text":228,"correct":21},"宜选用加厚的φ80~φ180mm焊接钢管或无缝钢管制作",{"key":23,"text":230,"correct":21},"双向相邻管棚的搭接长度不小于3m",{"key":26,"text":232,"correct":21},"为增加管棚刚度，应根据需要在钢管内灌注水泥砂浆、混凝土或放置钢筋笼并灌注水泥砂浆",{"key":29,"text":234,"correct":34},"双向相邻管棚的搭接长度不小于9m。",{"key":32,"text":236,"correct":21},"钢管宜沿隧道开挖轮廓线纵向近水平方向或按纵坡要求设置",{"id":238,"libraryId":5,"type":14,"typeLabel":15,"stem":239,"options":240,"answer":95,"analysis":36},1127074,"下列关于竖井井口防护的说法，符合规定的有（ ）。",[241,243,245,247,249],{"key":19,"text":242,"correct":21},"应设置防雨棚、挡水墙",{"key":23,"text":244,"correct":34},"应设置砖砌挡土墙",{"key":26,"text":246,"correct":21},"应设置高度不低于1.2m的安全护栏",{"key":29,"text":248,"correct":34},"四周地面应硬化处理",{"key":32,"text":250,"correct":21},"应架设安全警示装置",{"id":252,"libraryId":5,"type":14,"typeLabel":15,"stem":253,"options":254,"answer":210,"analysis":36},1127075,"单侧壁导坑法的施工要点有（）。",[255,257,259,261,263],{"key":19,"text":256,"correct":34},"用于断面跨度小，地表沉陷难于控制的软弱松散围岩中",{"key":23,"text":258,"correct":21},"将断面分成侧壁导坑、上台阶、下台阶",{"key":26,"text":260,"correct":21},"侧壁导坑宽度不宜超过0.5倍洞宽，高度以到起拱线为宜",{"key":29,"text":262,"correct":21},"导坑与台阶的距离以导坑施工和台阶施工不发生干扰为原则",{"key":32,"text":264,"correct":21},"上、下台阶的距离视围岩情况参照短台阶法或超短台阶法拟定",{"id":266,"libraryId":5,"type":14,"typeLabel":15,"stem":267,"options":268,"answer":210,"analysis":36},1127076,"关于中洞法、侧洞法、柱洞法、洞桩法，说法正确的有（）。",[269,271,273,275,277],{"key":19,"text":270,"correct":34},"中洞法施工工序简单，施工引起的地面沉降较易控制",{"key":23,"text":272,"correct":21},"侧洞法两侧洞施工时，中洞上方土体受多次扰动，中洞施工若不谨慎可能坍塌",{"key":26,"text":274,"correct":21},"柱洞法施工关键是确保两侧开挖后初期支护同步作用在顶纵梁上",{"key":29,"text":276,"correct":21},"洞桩法是先挖洞，在洞内施作桩(柱)、梁和顶部结构，然后在其保护下施工",{"key":32,"text":278,"correct":21},"侧洞法施工在处理中洞顶部荷载转移时，相对于中洞法要困难一些",{"id":280,"libraryId":5,"type":14,"typeLabel":15,"stem":281,"options":282,"answer":293,"analysis":36},1127077,"下列开挖方法中，初期支护拆除量大的方法有（）。",[283,285,287,289,291],{"key":19,"text":284,"correct":21},"CRD法",{"key":23,"text":286,"correct":34},"CD法",{"key":26,"text":288,"correct":34},"单侧壁导坑法",{"key":29,"text":290,"correct":21},"中洞法",{"key":32,"text":292,"correct":21},"侧洞法","ADE",{"id":295,"libraryId":5,"type":14,"typeLabel":15,"stem":296,"options":297,"answer":66,"analysis":36},1127079,"环形开挖预留核心土法的施工作业有（）。",[298,300,302,304,306],{"key":19,"text":299,"correct":21},"开挖环形拱部",{"key":23,"text":301,"correct":21},"架立钢支撑、挂钢筋网、喷混凝土",{"key":26,"text":303,"correct":21},"开挖核心土和下台阶，随时接长钢支撑和喷混凝土、封底",{"key":29,"text":305,"correct":34},"整平初次支护",{"key":32,"text":307,"correct":21},"二次衬砌作业",{"id":309,"libraryId":5,"type":14,"typeLabel":15,"stem":310,"options":311,"answer":35,"analysis":36},1127080,"全断面开挖法的优点有（）。",[312,314,316,318,320],{"key":19,"text":313,"correct":21},"开挖对围岩的扰动次数少，有利于围岩天然承载拱的形成",{"key":23,"text":315,"correct":21},"工序简单",{"key":26,"text":317,"correct":21},"在所有喷锚暗挖(矿山)法开挖方式中工期最短",{"key":29,"text":319,"correct":21},"初期支护拆除量无",{"key":32,"text":321,"correct":34},"能充分利用围岩的自稳能力",{"id":323,"libraryId":5,"type":14,"typeLabel":15,"stem":324,"options":325,"answer":166,"analysis":36},1127081,"关于双侧壁导坑法施工工艺的说法，正确的有（）。",[326,328,330,332,334],{"key":19,"text":327,"correct":21},"开挖一侧导坑，并及时地将其初次支护闭合",{"key":23,"text":329,"correct":34},"同时开挖另一侧导坑，并建造初次支护",{"key":26,"text":331,"correct":21},"然后开挖上部核心土，建造拱部初次支护",{"key":29,"text":333,"correct":21},"再后开挖下台阶，建造底部的初次支护，使初次支护全断面闭合",{"key":32,"text":335,"correct":21},"最后拆除导坑临空部分的初次支护，施作内层衬砌",{"id":337,"libraryId":5,"type":14,"typeLabel":15,"stem":338,"options":339,"answer":350,"analysis":36},1127082,"暗挖隧道外常用的支护与加固技术措施是（）。",[340,342,344,346,348],{"key":19,"text":341,"correct":34},"设置临时仰拱",{"key":23,"text":343,"correct":21},"降低地下水位",{"key":26,"text":345,"correct":21},"地表锚杆或地表注浆加固",{"key":29,"text":347,"correct":21},"冻结法固结地层",{"key":32,"text":349,"correct":34},"管棚超前支护","BCD",{"id":352,"libraryId":5,"type":14,"typeLabel":15,"stem":353,"options":354,"answer":51,"analysis":36},1127083,"常规冻结法适用的边界条件是（）。",[355,357,359,361,363],{"key":19,"text":356,"correct":34},"土体含水量大于10％",{"key":23,"text":358,"correct":21},"土体含水量大于2．5％",{"key":26,"text":360,"correct":34},"地下水流速不大于7～9m／d",{"key":29,"text":362,"correct":21},"地下水含盐量不大于3％",{"key":32,"text":364,"correct":21},"地下水流速不大于40m／d",{"id":366,"libraryId":5,"type":14,"typeLabel":15,"stem":367,"options":368,"answer":379,"analysis":36},1127084,"锚杆类型应根据（）进行选择。",[369,371,373,375,377],{"key":19,"text":370,"correct":21},"地质条件",{"key":23,"text":372,"correct":21},"使用要求",{"key":26,"text":374,"correct":21},"锚固特性",{"key":29,"text":376,"correct":34},"锚杆施工质量要求",{"key":32,"text":378,"correct":34},"喷锚支护结构","ABC",{"id":381,"libraryId":5,"type":14,"typeLabel":15,"stem":382,"options":383,"answer":393,"analysis":36},1127085,"当开挖作业面围岩自稳时间不够时，应采用（）等辅助技术对其进行加固。",[384,386,388,390,391],{"key":19,"text":385,"correct":21},"超前锚杆",{"key":23,"text":387,"correct":34},"喷射混凝土封闭开挖工作面",{"key":26,"text":389,"correct":21},"小导管周边注浆",{"key":29,"text":341,"correct":21},{"key":32,"text":392,"correct":34},"钢拱架喷射混凝土","ACD",{"id":395,"libraryId":5,"type":14,"typeLabel":15,"stem":396,"options":397,"answer":66,"analysis":36},1127086,"关于喷锚暗挖法施工隧道防水结构设计与施工的说法，正确的有( ) 。",[398,399,400,402,404],{"key":19,"text":72,"correct":21},{"key":23,"text":74,"correct":21},{"key":26,"text":401,"correct":21},"衬砌背后、隧底设置的排水盲管(沟)应有足够的数量和过水能力断面",{"key":29,"text":403,"correct":34},"衬砌背后、隧底设置的排水盲管(沟)应与衬砌分别施工以防被堵塞",{"key":32,"text":80,"correct":21},{"id":406,"libraryId":5,"type":14,"typeLabel":15,"stem":407,"options":408,"answer":35,"analysis":36},1127087,"有关小导管注浆支护加固技术的施工特点，说法正确的是（）。",[409,411,413,415,417],{"key":19,"text":410,"correct":21},"施工速度快",{"key":23,"text":412,"correct":21},"施工机械简单",{"key":26,"text":414,"correct":21},"工序交换容易",{"key":29,"text":416,"correct":21},"加固前必须配合钢拱架使用",{"key":32,"text":418,"correct":34},"适用于软弱地层和特殊困难地段",{"id":420,"libraryId":5,"type":14,"typeLabel":15,"stem":421,"options":422,"answer":95,"analysis":36},1127088,"采用小导管加固时，为保证工作面稳定和掘进安全，应确保小导管（ ）。",[423,425,426,428,429],{"key":19,"text":424,"correct":21},"安装位置正确",{"key":23,"text":88,"correct":34},{"key":26,"text":427,"correct":21},"有效长度足够",{"key":29,"text":92,"correct":34},{"key":32,"text":430,"correct":21},"钻设角度准确",{"id":432,"libraryId":5,"type":14,"typeLabel":15,"stem":433,"options":434,"answer":35,"analysis":36},1127089,"关于小导管注浆适用条件和基本规定的说法，正确的有（ ）。",[435,436,437,438,439],{"key":19,"text":115,"correct":21},{"key":23,"text":117,"correct":21},{"key":26,"text":105,"correct":21},{"key":29,"text":120,"correct":21},{"key":32,"text":122,"correct":34},{"id":441,"libraryId":5,"type":14,"typeLabel":15,"stem":442,"options":443,"answer":454,"analysis":36},1127090,"小导管注浆施工中，注浆材料应具备良好的可注性，通常，（ ）适用于卵石地层。",[444,446,448,450,452],{"key":19,"text":445,"correct":34},"水泥一水玻璃双液浆",{"key":23,"text":447,"correct":34},"改性水玻璃浆",{"key":26,"text":449,"correct":21},"水泥砂浆",{"key":29,"text":451,"correct":34},"特粗水泥浆",{"key":32,"text":453,"correct":21},"水泥浆","CE",{"id":456,"libraryId":5,"type":14,"typeLabel":15,"stem":457,"options":458,"answer":210,"analysis":36},1127091,"管棚断面形状有（）等。",[459,460,461,462,463],{"key":19,"text":159,"correct":34},{"key":23,"text":157,"correct":21},{"key":26,"text":165,"correct":21},{"key":29,"text":161,"correct":21},{"key":32,"text":163,"correct":21},{"id":465,"libraryId":5,"type":14,"typeLabel":15,"stem":466,"options":467,"answer":35,"analysis":36},1127092,"根据国内外经验，采用管棚超前支护的场合有（）。",[468,469,470,471,472],{"key":19,"text":209,"correct":21},{"key":23,"text":217,"correct":21},{"key":26,"text":207,"correct":21},{"key":29,"text":220,"correct":21},{"key":32,"text":222,"correct":34},{"id":474,"libraryId":5,"type":14,"typeLabel":15,"stem":475,"options":476,"answer":95,"analysis":36},1127093,"城市地铁车站常用的施工方法有（）。",[477,479,481,483,485],{"key":19,"text":478,"correct":21},"明挖法",{"key":23,"text":480,"correct":34},"盾构法",{"key":26,"text":482,"correct":21},"盖挖法",{"key":29,"text":484,"correct":34},"箱涵顶进法",{"key":32,"text":486,"correct":21},"喷锚暗挖法",{"id":488,"libraryId":5,"type":14,"typeLabel":15,"stem":489,"options":490,"answer":293,"analysis":36},1127094,"地铁车站通常由（）等部分组成。",[491,493,495,497,499],{"key":19,"text":492,"correct":21},"车站主体",{"key":23,"text":494,"correct":34},"人行天桥",{"key":26,"text":496,"correct":34},"行车道",{"key":29,"text":498,"correct":21},"出入口及通道",{"key":32,"text":500,"correct":21},"通风道及地面通风亭",{"id":502,"libraryId":5,"type":14,"typeLabel":15,"stem":503,"options":504,"answer":513,"analysis":36},1127095,"明挖法施工的车站主要采用（）结构。",[505,507,509,510,511],{"key":19,"text":506,"correct":34},"梯形",{"key":23,"text":508,"correct":21},"矩形框架",{"key":26,"text":159,"correct":34},{"key":29,"text":161,"correct":21},{"key":32,"text":512,"correct":34},"马蹄形","BD",{"id":515,"libraryId":5,"type":14,"typeLabel":15,"stem":516,"options":517,"answer":51,"analysis":36},1127096,"明挖法施工的优点是（ ）。",[518,520,522,524,526],{"key":19,"text":519,"correct":34},"施工噪声低",{"key":23,"text":521,"correct":21},"施工作业面多",{"key":26,"text":523,"correct":34},"围护结构变形小",{"key":29,"text":525,"correct":21},"工期短",{"key":32,"text":527,"correct":21},"工程造价低",{"id":529,"libraryId":5,"type":14,"typeLabel":15,"stem":530,"options":531,"answer":95,"analysis":36},1127097,"喷锚暗挖法施工的地铁车站，根据地层条件、施工方法及使用要求，可采用（）。",[532,534,536,538,540],{"key":19,"text":533,"correct":21},"单拱式车站",{"key":23,"text":535,"correct":34},"梯形车站",{"key":26,"text":537,"correct":21},"双拱式车站",{"key":29,"text":539,"correct":34},"圆形车站",{"key":32,"text":541,"correct":21},"三拱式车站",{"id":543,"libraryId":5,"type":14,"typeLabel":15,"stem":544,"options":545,"answer":66,"analysis":36},1127098,"喷锚支护是（ ）等材料组合起来的支护形式。",[546,548,550,552,554],{"key":19,"text":547,"correct":21},"喷射混凝土",{"key":23,"text":549,"correct":21},"锚杆",{"key":26,"text":551,"correct":21},"钢筋网",{"key":29,"text":553,"correct":34},"管棚",{"key":32,"text":555,"correct":21},"钢拱架",{"id":557,"libraryId":5,"type":14,"typeLabel":15,"stem":558,"options":559,"answer":570,"analysis":36},1127099,"明挖法施工地铁区间隧道结构一般为整体浇筑或装配式矩形结构，其优点是（）。",[560,562,564,566,568],{"key":19,"text":561,"correct":21},"内轮廓与地下铁道建筑限界接近",{"key":23,"text":563,"correct":21},"内部净空利用充分",{"key":26,"text":565,"correct":34},"噪声低",{"key":29,"text":567,"correct":21},"结构受力合理",{"key":32,"text":569,"correct":21},"顶板上便于敷设城市地下管网和设施","ABDE",{"id":572,"libraryId":5,"type":14,"typeLabel":15,"stem":573,"options":574,"answer":95,"analysis":36},1127100,"集水明排降水方法适用于（）地层。",[575,577,579,581,583],{"key":19,"text":576,"correct":21},"粉土",{"key":23,"text":578,"correct":34},"岩石",{"key":26,"text":580,"correct":21},"黏性土",{"key":29,"text":582,"correct":34},"含薄层粉砂的淤泥质黏土",{"key":32,"text":584,"correct":21},"砂土",{"id":586,"libraryId":5,"type":14,"typeLabel":15,"stem":587,"options":588,"answer":393,"analysis":36},1127101,"深基坑施工中，以提高土体强度和侧向抗力为主要目的的地基加固方法有（）。",[589,591,593,595,597],{"key":19,"text":590,"correct":21},"水泥土搅拌",{"key":23,"text":592,"correct":34},"换填",{"key":26,"text":594,"correct":21},"高压喷射注浆",{"key":29,"text":596,"correct":21},"注浆",{"key":32,"text":598,"correct":34},"注冷冻剂",{"id":600,"libraryId":5,"type":14,"typeLabel":15,"stem":601,"options":602,"answer":195,"analysis":36},1127102,"高压喷射注浆法形成的固结体基本形状有（）。",[603,605,607,609,611],{"key":19,"text":604,"correct":21},"圆柱状",{"key":23,"text":606,"correct":21},"壁状",{"key":26,"text":608,"correct":34},"方柱状",{"key":29,"text":610,"correct":21},"扇状",{"key":32,"text":612,"correct":34},"棱柱状",{"id":614,"libraryId":5,"type":14,"typeLabel":15,"stem":615,"options":616,"answer":95,"analysis":36},1127103,"用高压喷射法加固地基时，应根据现场试验结果确定其适用程度的土层有（）。",[617,619,621,623,625],{"key":19,"text":618,"correct":21},"湿陷性黄土",{"key":23,"text":620,"correct":34},"素填土",{"key":26,"text":622,"correct":21},"有机质土",{"key":29,"text":624,"correct":34},"碎石土",{"key":32,"text":626,"correct":21},"硬黏土",{"id":628,"libraryId":5,"type":14,"typeLabel":15,"stem":629,"options":630,"answer":570,"analysis":36},1127104,"关于水泥土搅拌法加固地基的说法，正确的有（）。",[631,633,635,637,639],{"key":19,"text":632,"correct":21},"用特制搅拌机械就地将水泥(或石灰)和软土强制搅拌",{"key":23,"text":634,"correct":21},"水泥土搅拌法可分为浆液搅拌和粉体喷射搅拌两种",{"key":26,"text":636,"correct":34},"粉体喷射深层搅拌机械在国内常用的有单轴、双轴、三轴及多轴搅拌机",{"key":29,"text":638,"correct":21},"水泥土搅拌法使软土硬结成具有整体性、水稳性和一定强度的水泥加固土",{"key":32,"text":640,"correct":21},"适用于加固饱和黏性土和粉土等地基",{"id":642,"libraryId":5,"type":14,"typeLabel":15,"stem":643,"options":644,"answer":655,"analysis":36},1127105,"下列地铁基坑围护结构中，刚度大的有（）。",[645,647,649,651,653],{"key":19,"text":646,"correct":34},"钢板桩",{"key":23,"text":648,"correct":34},"板式钢管桩",{"key":26,"text":650,"correct":21},"灌注桩",{"key":29,"text":652,"correct":21},"地下连续墙",{"key":32,"text":654,"correct":34},"SMW工法桩","CD",{"id":657,"libraryId":5,"type":14,"typeLabel":15,"stem":658,"options":659,"answer":35,"analysis":36},1127106,"选择地铁基坑围护结构形式，应根据（ ）等，经技术经济综合比较后确定。",[660,662,664,666,668],{"key":19,"text":661,"correct":21},"基坑深度",{"key":23,"text":663,"correct":21},"工程地质和水文地质",{"key":26,"text":665,"correct":21},"地面环境",{"key":29,"text":667,"correct":21},"城市施工特点",{"key":32,"text":669,"correct":34},"气象条件",{"id":671,"libraryId":5,"type":14,"typeLabel":15,"stem":672,"options":673,"answer":680,"analysis":36},1127107,"下列地铁基坑围护结构中，可回收部分或全部材料的有（）。",[674,675,677,678,679],{"key":19,"text":646,"correct":21},{"key":23,"text":676,"correct":34},"预制混凝土板桩",{"key":26,"text":650,"correct":34},{"key":29,"text":652,"correct":34},{"key":32,"text":654,"correct":21},"AE",{"id":682,"libraryId":5,"type":14,"typeLabel":15,"stem":683,"options":684,"answer":166,"analysis":36},1127108,"关于地铁基坑内支撑结构选型原则的说法，正确的有（ ）。",[685,687,689,691,693],{"key":19,"text":686,"correct":21},"宜采用受力明确、连接可靠、施工方便的结构形式",{"key":23,"text":688,"correct":34},"宜采用非对称而整体性强的结构形式",{"key":26,"text":690,"correct":21},"应与地下主体结构形式、施工顺序协调",{"key":29,"text":692,"correct":21},"应利于基坑土方开挖和运输",{"key":32,"text":694,"correct":21},"需要时，应考虑内支撑结构作为施工平台",{"id":696,"libraryId":5,"type":14,"typeLabel":15,"stem":697,"options":698,"answer":570,"analysis":36},1127109,"软土地区地铁车站施工时，引起纵向滑坡工程事故的原因主要有（ ）。",[699,701,703,705,707],{"key":19,"text":700,"correct":21},"坡度过陡",{"key":23,"text":702,"correct":21},"雨期施工",{"key":26,"text":704,"correct":34},"边坡加固",{"key":29,"text":706,"correct":21},"排水不畅",{"key":32,"text":708,"correct":21},"坡脚扰动",[710,714,717,720,723,726],{"id":711,"name":712,"category":7,"favorite":713},1,"领导干部任职前廉政法规知识测试题",92,{"id":715,"name":716,"category":7,"favorite":711},595,"建筑结构与设备",{"id":718,"name":719,"category":7,"favorite":711},715,"招标采购专业知识与法律法规",{"id":721,"name":722,"category":7,"favorite":711},848,"市政方向-通用基础",{"id":724,"name":725,"category":7,"favorite":8},534,"BIM工程师",{"id":727,"name":725,"category":7,"favorite":8},535]