[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,48,50,2846,[13,38,53,68,83,98,113,128,140,155,169,183,197,211,225,239,253,268,283,297,311,326,340,355,369,383,397,411,425,440,455,469,484,498,512,526,538,551,562,576,590,604,618,632,646,660,674,687,702,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126958,2,"多选题","箱涵顶进前应检查验收( )，必须符合设计要求。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","箱涵主体结构的混凝土强度",true,{"key":24,"text":25,"correct":26},"B","后背施工",false,{"key":28,"text":29,"correct":26},"C","顶进设备液压系统安装及预顶试验",{"key":31,"text":32,"correct":26},"D","线路加固",{"key":34,"text":35,"correct":22},"E","箱涵防水层及保护层","AE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126959,"箱涵顶进前检查工作有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"箱涵主体结构混凝土强度必须达到设计强度，防水层及保护层按设计完成",{"key":24,"text":45,"correct":22},"后背施工、线路加固达到施工方案要求；顶进设备及施工机械符合要求",{"key":28,"text":47,"correct":26},"启动时，现场必须有主管施工技术人员专人统一指挥",{"key":31,"text":49,"correct":22},"顶进设备液压系统安装及预顶试验结果符合要求",{"key":34,"text":51,"correct":22},"所穿越的线路管理部门的配合人员、抢修设备、通信器材准备完毕","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1126960,"箱涵顶进自启动起，对顶进全过程的每一个顶程都应详细记录( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"千斤顶开动数量、位置",{"key":24,"text":60,"correct":22},"油泵压力表读数",{"key":28,"text":62,"correct":22},"总顶力与着力点",{"key":31,"text":64,"correct":26},"顶进距离",{"key":34,"text":66,"correct":26},"出土数量","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1126961,"桥梁按受力特点可划分为（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"拱式桥",{"key":24,"text":75,"correct":22},"悬索桥",{"key":28,"text":77,"correct":22},"梁式桥",{"key":31,"text":79,"correct":22},"刚架桥",{"key":34,"text":81,"correct":26},"人行桥","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1126962,"梁式桥的下部结构是指（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"桥跨结构",{"key":24,"text":90,"correct":26},"支座系统",{"key":28,"text":92,"correct":22},"桥墩",{"key":31,"text":94,"correct":22},"桥台",{"key":34,"text":96,"correct":22},"墩台基础","CDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1126963,"关于支架、拱架搭设要求，正确的有（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"支架立柱底端必须放置垫板或混凝土垫块",{"key":24,"text":105,"correct":22},"支架通行孔的两边应加护桩，夜间应设警示灯",{"key":28,"text":107,"correct":22},"易受漂流物冲撞的河中支架应设牢固的防护设施",{"key":31,"text":109,"correct":26},"支架或拱架应与施工脚手架、便桥相连",{"key":34,"text":111,"correct":22},"支架、拱架安装完毕，经检验合格后方可安装模板","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1126964,"钢筋混凝土结构所用钢筋的（）等均应符合设计要求和现行国家标准。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"品种",{"key":24,"text":120,"correct":26},"等级",{"key":28,"text":122,"correct":22},"规格",{"key":31,"text":124,"correct":26},"牌号",{"key":34,"text":126,"correct":22},"性能","ACE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":139,"analysis":37},1126965,"钢筋下料后应按（）分别挂牌标明。",[132,133,135,136,138],{"key":20,"text":118,"correct":26},{"key":24,"text":134,"correct":22},"种类",{"key":28,"text":122,"correct":26},{"key":31,"text":137,"correct":22},"使用部位",{"key":34,"text":120,"correct":26},"BD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1126966,"钢筋与钢板的T形连接宜采用（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"电弧焊",{"key":24,"text":147,"correct":26},"闪光对焊",{"key":28,"text":149,"correct":22},"埋弧压力焊",{"key":31,"text":151,"correct":26},"氩弧焊",{"key":34,"text":153,"correct":26},"电阻点焊","AC",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":82,"analysis":37},1126967,"下列钢筋现场绑扎规定中，正确的有（）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"钢筋的交叉点应采用绑丝绑牢，必要时可辅以点焊",{"key":24,"text":162,"correct":22},"钢筋网的外围两行钢筋交叉点应全部扎牢",{"key":28,"text":164,"correct":22},"钢筋骨架的多层钢筋之间，应用短钢筋支垫，确保位置准确",{"key":31,"text":166,"correct":22},"双向受力的钢筋网，钢筋交叉点必须全部扎牢",{"key":34,"text":168,"correct":26},"各种断面形状柱的所有竖向钢筋弯钩平面应朝向断面中心",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":139,"analysis":37},1126969,"混凝土雨期施工应增加砂石料含水率的测定次数，根据测定结果调整( )用量。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"水泥",{"key":24,"text":176,"correct":22},"砂石料",{"key":28,"text":178,"correct":26},"粉煤灰",{"key":31,"text":180,"correct":22},"水",{"key":34,"text":182,"correct":26},"减水剂",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":112,"analysis":37},1126970,"先张法预应力筋张拉的一般操作过程为：调整预应力筋长度（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"初始张拉",{"key":24,"text":190,"correct":22},"正式张拉",{"key":28,"text":192,"correct":22},"持荷",{"key":31,"text":194,"correct":26},"铺放预应力筋",{"key":34,"text":196,"correct":22},"锚固",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":127,"analysis":37},1126971,"预应力钢绞线进场时应检查和检验的项目有（）。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"表面质量",{"key":24,"text":204,"correct":26},"弯曲试验",{"key":28,"text":206,"correct":22},"外形尺寸",{"key":31,"text":208,"correct":26},"伸长率试验",{"key":34,"text":210,"correct":22},"力学性能试验",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":112,"analysis":37},1126972,"下列选项中符合预应力混凝土配制要求的有（）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"水泥用量不宜大于550kg／m3",{"key":24,"text":218,"correct":22},"不宜使用矿渣硅酸盐水泥",{"key":28,"text":220,"correct":22},"粗骨料应采用碎石，其粒径宜为5～25mm",{"key":31,"text":222,"correct":26},"氯离子总含量不宜超过水泥用量的0．09％",{"key":34,"text":224,"correct":22},"氯离子总含量超过规定值时宜掺加阻锈剂",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":97,"analysis":37},1126973,"桥面防水工程中，混凝土基层检测的主控项目是（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":26},"配合比",{"key":24,"text":232,"correct":26},"稳定度",{"key":28,"text":234,"correct":22},"含水率",{"key":31,"text":236,"correct":22},"粗糙度",{"key":34,"text":238,"correct":22},"平整度",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":67,"analysis":37},1126974,"钢筋混凝土板桩围堰的适用特点是（）。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"适用于流速较大的砂类土、黏性土、碎石土河床",{"key":24,"text":246,"correct":22},"能节约大量木材",{"key":28,"text":248,"correct":22},"可拔除周转使用",{"key":31,"text":250,"correct":26},"适用于修建桩基承台",{"key":34,"text":252,"correct":26},"整体刚度较强",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},1126975,"关于钻孔桩钢筋笼与混凝土灌注施工要点，错误的有（）",[257,259,261,263,265],{"key":20,"text":258,"correct":26},"钢筋笼制作、运输和吊装过程中应防止其变形",{"key":24,"text":260,"correct":22},"钢筋笼放入泥浆后5h内必须浇筑混凝土",{"key":28,"text":262,"correct":22},"宜采用预拌混凝土，其骨料粒径不宜大于45mm",{"key":31,"text":264,"correct":26},"浇筑时混凝土的温度不得低于5℃",{"key":34,"text":266,"correct":26},"当气温高于30℃时，应根据具体情况对混凝土采取缓凝措施","BC",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1126976,"关于沉入桩施工技术要点，正确的有（）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"沉桩时，桩锤、桩帽或送桩帽应和桩身在同一中心线上",{"key":24,"text":275,"correct":26},"桩身垂直度偏差不得超过1％",{"key":28,"text":277,"correct":22},"接桩可采用焊接、法兰连接或机械连接",{"key":31,"text":279,"correct":22},"终止锤击应以控制桩端设计标高为主，贯入度为辅",{"key":34,"text":281,"correct":22},"沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护","ACDE",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":127,"analysis":37},1126977,"冲击钻成孔中遇到（）等情况时，应采取措施后方可继续施工。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"斜孔",{"key":24,"text":290,"correct":26},"缩孔",{"key":28,"text":292,"correct":22},"梅花孔",{"key":31,"text":294,"correct":26},"失稳",{"key":34,"text":296,"correct":22},"塌孔",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":127,"analysis":37},1126978,"关于灌注钻孔桩水下混凝土所用导管的要求，正确的有（）。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"导管内壁应光滑圆顺，直径宜为20～30cm，节长宜为2m",{"key":24,"text":304,"correct":26},"导管轴线偏差不宜超过孔深的1％，且不宜大于10cm",{"key":28,"text":306,"correct":22},"导管采用法兰盘接头宜加锥形活套",{"key":31,"text":308,"correct":26},"采用螺旋丝扣型接头宜加防松脱装置",{"key":34,"text":310,"correct":22},"使用前应试拼、试压，试压的压力宜为孔底静水压力的1.5倍",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":325,"analysis":37},1126979,"泥浆制备根据施工机具、工艺及穿越土层情况进行配合比设计，宜选用（）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"高塑性黏土",{"key":24,"text":318,"correct":22},"膨润土",{"key":28,"text":320,"correct":26},"粉质黏土",{"key":31,"text":322,"correct":26},"黏性土",{"key":34,"text":324,"correct":26},"粉土","AB",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":112,"analysis":37},1126980,"关于正、反循环钻孔，说法正确的有（）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"泥浆护壁成孔时根据泥浆补给情况控制钻进速度，保持钻机稳定",{"key":24,"text":333,"correct":22},"发生斜孔、塌孔和护筒周围冒浆、失稳等现象时，应停钻采取相应措施",{"key":28,"text":335,"correct":22},"达到设计深度，灌注混凝土之前，孔底沉渣厚度应符合设计要求",{"key":31,"text":337,"correct":26},"设计未要求时，端承型桩的沉渣厚度不应大于150mm",{"key":34,"text":339,"correct":22},"设计未要求时，摩擦型桩的沉渣厚度不应大于300mm",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},1126981,"关于重力式混凝土墩台施工要求，正确的有（）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"墩台混凝土浇筑前应对基础混凝土顶面做凿毛处理，清除锚筋污锈",{"key":24,"text":347,"correct":26},"墩台混凝土宜水平分层浇筑，每层高度宜为1m",{"key":28,"text":349,"correct":22},"墩台混凝土分块浇筑时，每块面积不得小于50m2",{"key":31,"text":351,"correct":22},"明挖基础上灌注墩台第一层混凝土时，要防止水分被基础吸收",{"key":34,"text":353,"correct":26},"墩台的混凝土宜一次连续浇筑完成","ACD",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":52,"analysis":37},1126982,"关于重力式砌体墩台施工要求，正确的有（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"墩台砌筑前，应清理基础，保持洁净，并测量放线，设置线杆",{"key":24,"text":362,"correct":22},"墩台砌体应采用坐浆法分层砌筑，竖缝均应错开，不得贯通",{"key":28,"text":364,"correct":26},"砌筑墩台镶面石应从直线部分开始",{"key":31,"text":366,"correct":22},"桥墩分水体镶面石的抗压强度不得低于设计要求",{"key":34,"text":368,"correct":22},"砌筑的石料和混凝土预制块应清洗干净，保持湿润",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":82,"analysis":37},1126983,"关于柱式墩台施工要求，正确的有（）。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"墩台柱与承台基础接触面应凿毛处理，清除钢筋污锈",{"key":24,"text":376,"correct":22},"浇筑墩台柱混凝土时，应铺同配合比的水泥砂浆一层",{"key":28,"text":378,"correct":22},"柱身高度内有系梁连接时，系梁应与柱同步浇筑",{"key":31,"text":380,"correct":22},"V形墩柱混凝土应对称浇筑",{"key":34,"text":382,"correct":26},"分层浇筑时，接缝应按施工缝处理",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":112,"analysis":37},1126984,"关于简支梁板吊运方案的要求，正确的有（）。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"编制专项方案，并按有关规定进行论证、批准",{"key":24,"text":390,"correct":22},"应进行吊车等机具的安全性验算",{"key":28,"text":392,"correct":22},"起吊过程中构件内产生的应力验算必须符合要求",{"key":31,"text":394,"correct":26},"应对施工现场条件和拟定运输路线上的社会交通进行充分调研和评估",{"key":34,"text":396,"correct":22},"按照起重吊装的有关规定，选择吊运工具、设备",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":127,"analysis":37},1126985,"现浇预应力混凝土连续梁的常用施工方法有（）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"支架法",{"key":24,"text":404,"correct":26},"顶推法",{"key":28,"text":406,"correct":22},"移动模架法",{"key":31,"text":408,"correct":26},"悬臂拼装法",{"key":34,"text":410,"correct":22},"悬臂浇筑法",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":82,"analysis":37},1126986,"关于移动模架法现浇预应力混凝土连续梁的要求，正确的有（）。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"模架长度必须满足施工要求",{"key":24,"text":418,"correct":22},"模架应利用专用设备组装，在施工时能确保质量和安全",{"key":28,"text":420,"correct":22},"内、外模板就位时，其平面尺寸、高程、预拱度的误差必须控制在容许范围内",{"key":31,"text":422,"correct":22},"预应力筋管道、钢筋、预埋件设置应符合规范规定和设计要求",{"key":34,"text":424,"correct":26},"浇筑分段工作缝，不能设在弯矩零点附近",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":439,"analysis":37},1126987,"箱涵顶进的施工内容包括（）等。",[429,431,433,435,437],{"key":20,"text":430,"correct":26},"管底土层夯压密实",{"key":24,"text":432,"correct":22},"工程降水",{"key":28,"text":434,"correct":22},"拆除加固设施",{"key":31,"text":436,"correct":22},"铺设润滑隔离层",{"key":34,"text":438,"correct":22},"拆除后背及顶进设备","BCDE",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":454,"analysis":37},1126988,"城市地铁车站常用的施工方法有( )。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"明挖法",{"key":24,"text":447,"correct":22},"盖挖法",{"key":28,"text":449,"correct":26},"盾构法",{"key":31,"text":451,"correct":26},"箱涵顶进法",{"key":34,"text":453,"correct":22},"暗挖（矿山）法","ABE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":112,"analysis":37},1126989,"城市轨道交通区间结构断面形状可以分为( )。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"矩形",{"key":24,"text":462,"correct":22},"拱形",{"key":28,"text":464,"correct":22},"圆形",{"key":31,"text":466,"correct":26},"梯形",{"key":34,"text":468,"correct":22},"椭圆形",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":483,"analysis":37},1126990,"地铁车站通常由( )等部分组成。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"车站主体",{"key":24,"text":476,"correct":26},"人行天桥",{"key":28,"text":478,"correct":26},"行车道",{"key":31,"text":480,"correct":22},"出入口及通道",{"key":34,"text":482,"correct":22},"通风道及地面通风亭","ADE",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":52,"analysis":37},1126991,"有围护结构基坑的围护结构又分为不同类型，包括( )。",[488,490,492,494,496],{"key":20,"text":489,"correct":22},"地下连续墙",{"key":24,"text":491,"correct":22},"人工挖孔桩",{"key":28,"text":493,"correct":26},"锚杆护坡",{"key":31,"text":495,"correct":22},"钻孔灌注桩",{"key":34,"text":497,"correct":22},"工字钢桩",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":82,"analysis":37},1126992,"盖挖法每次分部开挖及浇筑衬砌的深度，应综合考虑（）等因素来确定。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"基坑稳定",{"key":24,"text":505,"correct":22},"环境保护",{"key":28,"text":507,"correct":22},"永久结构形式",{"key":31,"text":509,"correct":22},"混凝土浇筑作业",{"key":34,"text":511,"correct":26},"施工能力",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":354,"analysis":37},1126993,"以下关于浅埋暗挖法“十八字”原则说法正确的是( )。",[516,518,520,522,524],{"key":20,"text":517,"correct":22},"严注浆",{"key":24,"text":519,"correct":26},"长开挖",{"key":28,"text":521,"correct":22},"管超前",{"key":31,"text":523,"correct":22},"强支护",{"key":34,"text":525,"correct":26},"晚封闭",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":82,"analysis":37},1126994,"关于隧道浅埋暗挖法施工的说法，正确的是( )。",[530,532,534,536],{"key":20,"text":531,"correct":22},"施工时不允许带水作业",{"key":24,"text":533,"correct":22},"要求开挖面具有一定的自立性和稳定性",{"key":28,"text":535,"correct":22},"浅埋暗挖法可以独立使用，也可以与其他方法综合使用",{"key":31,"text":537,"correct":22},"浅埋暗挖技术从减少城市地表沉陷考虑，还必须辅之以其他配套技术，比如地层加固、降水等",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":282,"analysis":37},1126995,"浅埋暗挖法施工的十八字方针是管超前、严注浆( )。",[542,544,546,547,549],{"key":20,"text":543,"correct":22},"短开挖",{"key":24,"text":545,"correct":26},"少扰动",{"key":28,"text":523,"correct":22},{"key":31,"text":548,"correct":22},"快封闭",{"key":34,"text":550,"correct":22},"勤量测",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":139,"analysis":37},1126996,"明挖法施工的车站主要采用( )结构。",[555,556,558,559,560],{"key":20,"text":466,"correct":26},{"key":24,"text":557,"correct":22},"矩形框架",{"key":28,"text":464,"correct":26},{"key":31,"text":462,"correct":22},{"key":34,"text":561,"correct":26},"马蹄形",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":127,"analysis":37},1126997,"喷锚暗挖法施工的地铁车站，根据地层条件、施工方法及使用要求，可采用( )。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"单拱式车站",{"key":24,"text":569,"correct":26},"梯形车站",{"key":28,"text":571,"correct":22},"双拱式车站",{"key":31,"text":573,"correct":26},"圆形车站",{"key":34,"text":575,"correct":22},"三拱式车站",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":454,"analysis":37},1126998,"采用浅埋暗挖法开挖作业时，其总原则是( )。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"预支护、预加固一段，开挖一段",{"key":24,"text":583,"correct":22},"开挖一段，支护一段",{"key":28,"text":585,"correct":26},"支护一段，开挖一段",{"key":31,"text":587,"correct":26},"封闭成环一段，支护一段",{"key":34,"text":589,"correct":22},"支护一段，封闭成环一段",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":112,"analysis":37},1126999,"盾构法的主要施工步骤包括( )。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"工作井建造",{"key":24,"text":597,"correct":22},"掘进出土（泥）",{"key":28,"text":599,"correct":22},"管片安装",{"key":31,"text":601,"correct":26},"地表注浆",{"key":34,"text":603,"correct":22},"衬砌背后注浆",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":82,"analysis":37},1127000,"在松软含水地层、施工条件困难地段，采用盾构法施工隧道的优越性是( )。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"在松软含水地层中修建埋深较大的长隧道往往具有技术和经济方面的优越性",{"key":24,"text":611,"correct":22},"在一定覆土范围内，隧道的施工费用不受覆士量影响，适宜于建造覆土较深的隧道",{"key":28,"text":613,"correct":22},"盾构推进、出土、拼装衬砌等主要工序循环进行，施工易于管理，施工人员也较少",{"key":31,"text":615,"correct":22},"既不影响地面交通，又可减少对附近居民的噪声和振动影响",{"key":34,"text":617,"correct":26},"土方及衬砌施工安全、掘进速度慢",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":52,"analysis":37},1127001,"明挖法施工地铁区间隧道结构一般为整体浇筑或装配式矩形结构，其优点是( )。",[622,624,626,628,630],{"key":20,"text":623,"correct":22},"内轮廓与地下铁道建筑限界接近",{"key":24,"text":625,"correct":22},"内部净空利用充分",{"key":28,"text":627,"correct":26},"噪声低",{"key":31,"text":629,"correct":22},"结构受力合理",{"key":34,"text":631,"correct":22},"顶板上便于敷设城市地下管网和设施",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":282,"analysis":37},1127002,"基坑开挖过程中应立即停止挖土的异常情况是( )等。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"边坡出现失稳征兆时",{"key":24,"text":639,"correct":26},"开挖暴露出的基底受到扰动",{"key":28,"text":641,"correct":22},"开挖暴露出的基底出现明显异常（包括黏性土时强度明显偏低或砂性土层时水位过高造成开挖施工困难时）",{"key":31,"text":643,"correct":22},"围护结构或止水帷幕出现渗漏，或基坑出现流土、管涌现象",{"key":34,"text":645,"correct":22},"支护结构变形达到设计规定的控制值或变形速率持续增长且不收敛",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":67,"analysis":37},1127003,"地铁车站的长条形基坑开挖应遵循( )的原则",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"分段分层",{"key":24,"text":653,"correct":22},"由上而下",{"key":28,"text":655,"correct":22},"先支撑后开挖",{"key":31,"text":657,"correct":26},"先开挖后支撑",{"key":34,"text":659,"correct":26},"由下而上",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":67,"analysis":37},1127004,"放坡基坑施工中，当边坡有失稳迹象时，应及时采取( )或其他有效措施。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"削坡",{"key":24,"text":667,"correct":22},"坡顶卸荷",{"key":28,"text":669,"correct":22},"坡脚压载",{"key":31,"text":671,"correct":26},"水泥抹面",{"key":34,"text":673,"correct":26},"抛石块加固",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":354,"analysis":37},1127005,"放坡基坑施工中，护坡措施有( )。",[678,680,682,684,685],{"key":20,"text":679,"correct":22},"挂网喷浆或混凝土",{"key":24,"text":681,"correct":26},"坡脚砌砖",{"key":28,"text":683,"correct":22},"锚杆喷射混凝土护面",{"key":31,"text":671,"correct":22},{"key":34,"text":686,"correct":26},"草袋覆盖",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":701,"analysis":37},1127006,"下列选项中，属于面层混凝土板分类的是( )。",[691,693,695,697,699],{"key":20,"text":692,"correct":26},"特殊(素)混凝土板",{"key":24,"text":694,"correct":22},"预应力混凝土板",{"key":28,"text":696,"correct":26},"连续性钢筋混凝土板",{"key":31,"text":698,"correct":22},"碾压混凝土板",{"key":34,"text":700,"correct":22},"连续配筋混凝土板","BDE",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":67,"analysis":37},1127007,"降水工程复杂程度以（）为主要条件，符合主要条件之一即可。",[706,708,710,712,714],{"key":20,"text":707,"correct":22},"工程环境",{"key":24,"text":709,"correct":22},"工程规模",{"key":28,"text":711,"correct":22},"降水深度",{"key":31,"text":713,"correct":26},"含水层特征",{"key":34,"text":715,"correct":26},"场地复杂程度",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":282,"analysis":37},1127008,"工程降水的方法有( )。",[720,722,724,726,728],{"key":20,"text":721,"correct":22},"集水明排",{"key":24,"text":723,"correct":26},"管涵排水",{"key":28,"text":725,"correct":22},"管井降水",{"key":31,"text":727,"correct":22},"喷射井点",{"key":34,"text":729,"correct":22},"轻型井点",[731,735,738,741,744,747],{"id":732,"name":733,"category":7,"favorite":734},1,"领导干部任职前廉政法规知识测试题",92,{"id":736,"name":737,"category":7,"favorite":732},595,"建筑结构与设备",{"id":739,"name":740,"category":7,"favorite":732},715,"招标采购专业知识与法律法规",{"id":742,"name":743,"category":7,"favorite":732},848,"市政方向-通用基础",{"id":745,"name":746,"category":7,"favorite":8},534,"BIM工程师",{"id":748,"name":746,"category":7,"favorite":8},535]