[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":724},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,47,50,2846,[13,38,53,66,81,95,110,125,140,149,164,178,192,207,222,237,251,264,278,292,306,320,334,348,362,376,390,404,418,432,446,458,472,487,501,515,529,543,557,571,584,598,612,626,640,654,668,682,696,710],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126908,2,"多选题","金属波纹管道进场时，应检查和检验的项目有( )。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","出厂合格证和质量保证书",true,{"key":24,"text":25,"correct":22},"B","核对类别、型号、规格及数量",{"key":27,"text":28,"correct":22},"C","外观、尺寸、集中荷载下的径向刚度",{"key":30,"text":31,"correct":22},"D","荷载作用后的抗渗及抗弯曲渗漏",{"key":33,"text":34,"correct":35},"E","制作金属螺旋管的钢带厚度不宜小于0.25mm",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126909,"锚具、夹具和连接器进场时，确认其锚固性能类别、型号、规格、数量后进行( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"外观检查",{"key":24,"text":45,"correct":35},"强度检验",{"key":27,"text":47,"correct":22},"硬度检验",{"key":30,"text":49,"correct":22},"静载锚固性能试验",{"key":33,"text":51,"correct":35},"动载锚固性能试验","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":65,"analysis":37},1126910,"锚具、夹具和连接器进场时，除应按出厂合格证和质量证明书核查其锚固性能类别、型号、规格及数量外，还应按( )进行验收。",[57,59,60,62,64],{"key":20,"text":58,"correct":35},"稳定性检查",{"key":24,"text":43,"correct":22},{"key":27,"text":61,"correct":35},"荷载力试验",{"key":30,"text":63,"correct":22},"硬度检查",{"key":33,"text":49,"correct":22},"BDE",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},1126911,"下列选项中符合预应力混凝土配制要求的有( )。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"水泥用量不宜大于550kg\u002Fm3",{"key":24,"text":73,"correct":22},"不宜使用矿渣硅酸盐水泥",{"key":27,"text":75,"correct":22},"粗骨料应采用碎石，其粒径宜为5～25mm",{"key":30,"text":77,"correct":35},"氯离子总含量不宜超过水泥用量的0.09%",{"key":33,"text":79,"correct":22},"氯离子总含量超过规定值时宜掺加阻锈剂","ABCE",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":36,"analysis":37},1126912,"下列预应力张拉施工规定中，正确的有( )。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"预应力筋的张拉控制应力必须符合设计规定",{"key":24,"text":88,"correct":22},"预应力筋采用应力控制方法张拉时，应以伸长值进行校核",{"key":27,"text":90,"correct":22},"伸长值应从初应力时开始量测",{"key":30,"text":92,"correct":22},"实际伸长值与理论伸长值的差值应符合设计要求",{"key":33,"text":94,"correct":35},"设计无规定时，实际伸长值与理论伸长值之差应控制在8%以内",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":109,"analysis":37},1126913,"下列先张法预应力张拉施工规定中，正确的有( )。",[99,101,103,105,107],{"key":20,"text":100,"correct":22},"张拉台座应具有足够的强度和刚度",{"key":24,"text":102,"correct":22},"锚板受力中心应与预应力筋合力中心一致",{"key":27,"text":104,"correct":35},"同时张拉多根预应力筋时，各根预应力筋的初始应力差值不得大于5%",{"key":30,"text":106,"correct":22},"预应力筋就位后，严禁使用电弧焊对梁体钢筋及模板进行切割或焊接",{"key":33,"text":108,"correct":22},"设计未规定时，应分阶段、对称、交错地放张","ABDE",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1126914,"下列后张法预应力张拉施工规定中，正确的有( )。",[114,116,118,120,122],{"key":20,"text":115,"correct":35},"设计未要求，张拉时混凝土构件的强度不得低于设计值的70%",{"key":24,"text":117,"correct":22},"张拉前应根据设计要求对孔道的摩阻损失进行实测",{"key":27,"text":119,"correct":22},"长度小于25m的直线预应力筋，可在一端张拉",{"key":30,"text":121,"correct":22},"当设计无要求时，预应力筋的张拉顺序宜先中间，后上、下或两侧",{"key":33,"text":123,"correct":22},"张拉控制应力达到稳定后方可锚固","BCDE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1126915,"下列后张法预应力孔道压浆与封锚规定中，正确的有( )。",[129,131,133,135,137],{"key":20,"text":130,"correct":35},"压浆过程中及压浆后24h内，结构混凝土的温度不得低于5℃",{"key":24,"text":132,"correct":22},"多跨连续有连接器的预应力筋孔道，应张拉完一段灌注一段",{"key":27,"text":134,"correct":22},"压浆作业，每一工作班应留取不少于3组砂浆试块，标养28d",{"key":30,"text":136,"correct":22},"当白天气温高于35℃时，压浆宜在夜间进行",{"key":33,"text":138,"correct":35},"封锚混凝土的强度等级不宜低于结构混凝土强度等级的75%，且不低于30MPa","BCD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":139,"analysis":37},1126916,"下列预应力孔道压浆与封锚规定中，正确的有( )。",[144,145,146,147,148],{"key":20,"text":130,"correct":35},{"key":24,"text":132,"correct":22},{"key":27,"text":134,"correct":22},{"key":30,"text":136,"correct":22},{"key":33,"text":138,"correct":35},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":163,"analysis":37},1126917,"严禁进行桥面防水层施工的情况是（ ）。",[153,155,157,159,161],{"key":20,"text":154,"correct":22},"下雨",{"key":24,"text":156,"correct":22},"下雪",{"key":27,"text":158,"correct":35},"阴、风力小于五级",{"key":30,"text":160,"correct":22},"风力≥5级",{"key":33,"text":162,"correct":35},"晴","ABD",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":36,"analysis":37},1126918,"关于基层处理剂施工技术要求，正确的有( )。",[168,170,172,174,176],{"key":20,"text":169,"correct":22},"防水基层处理剂应根据规范要求选用",{"key":24,"text":171,"correct":22},"喷涂基层处理剂前，应采用毛刷对桥面排水口、转角等处先行涂刷",{"key":27,"text":173,"correct":22},"基层处理剂可采用喷涂法或刷涂法施工，喷涂应均匀，覆盖完全",{"key":30,"text":175,"correct":22},"基层处理剂涂刷完毕后，涂刷范围内，严禁各种车辆行驶和人员踩踏",{"key":33,"text":177,"correct":35},"基层处理剂涂完后，应马上进行防水层施工",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":139,"analysis":37},1126919,"桥面防水层施工前，对基层混凝土的技术要求有( )。",[182,184,186,188,190],{"key":20,"text":183,"correct":35},"强度",{"key":24,"text":185,"correct":22},"表面粗糙度",{"key":27,"text":187,"correct":22},"基层平整度",{"key":30,"text":189,"correct":22},"混凝土含水率",{"key":33,"text":191,"correct":35},"粘结强度",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":206,"analysis":37},1126920,"城市桥梁中常用的支座主要为( )。",[196,198,200,202,204],{"key":20,"text":197,"correct":22},"板式橡胶支座",{"key":24,"text":199,"correct":35},"钢支座",{"key":27,"text":201,"correct":22},"盆式橡胶支座",{"key":30,"text":203,"correct":35},"聚四氟乙烯支座",{"key":33,"text":205,"correct":35},"弧形支座","AC",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":221,"analysis":37},1126921,"下列关于桥梁伸缩装置安装要求的说法，正确的有( )。",[211,213,215,217,219],{"key":20,"text":212,"correct":22},"安装前，按设计图纸核对安装处的预留槽尺寸、预埋锚固钢筋的规格、数量及位置",{"key":24,"text":214,"correct":35},"按照安装时的气温调整定位值，用专用卡具将其固定",{"key":27,"text":216,"correct":22},"吊装就位前，将预留槽内混凝土凿毛并清扫干净",{"key":30,"text":218,"correct":22},"吊装时应按照厂家标明的吊点位置起吊，必要时做适当加强",{"key":33,"text":220,"correct":22},"伸缩装置两侧预留槽混凝土强度未达到设计要求前不得开放交通","ACDE",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":236,"analysis":37},1126922,"关于土围堰施工要求的表述，正确的有( )。",[226,228,230,232,234],{"key":20,"text":227,"correct":22},"筑堰材料宜用黏性土、粉质黏土或砂质黏土，填出水面后应进行夯实。填土应自上游开始至下游合龙",{"key":24,"text":229,"correct":22},"筑堰前，必须将堰底下河床上的杂物、石块及树根等清楚干净",{"key":27,"text":231,"correct":35},"堰顶宽度可为1～3m",{"key":30,"text":233,"correct":35},"填土应自下游开始至上游合龙",{"key":33,"text":235,"correct":22},"堰内边坡宜为1：1-1：1.5，内坡脚与基坑的距离不得小于1米","ABE",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":52,"analysis":37},1126923,"土围堰施工要求筑堰材料宜用( )，填出水面之后应进行夯实。",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"黏性土",{"key":24,"text":244,"correct":35},"砂土",{"key":27,"text":246,"correct":22},"砂质黏土",{"key":30,"text":248,"correct":22},"粉质黏土",{"key":33,"text":250,"correct":35},"粉土",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":263,"analysis":37},1126924,"现场填筑围堰的填筑材料宜用( )。",[255,256,257,259,261],{"key":20,"text":242,"correct":22},{"key":24,"text":248,"correct":22},{"key":27,"text":258,"correct":22},"砂夹黏土",{"key":30,"text":260,"correct":35},"土工织物",{"key":33,"text":262,"correct":35},"改性沥青混合料","ABC",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":277,"analysis":37},1126925,"钢筋混凝土板桩围堰适用于( )河床。",[268,269,271,273,275],{"key":20,"text":242,"correct":22},{"key":24,"text":270,"correct":35},"粉性土",{"key":27,"text":272,"correct":22},"砂类土",{"key":30,"text":274,"correct":35},"湿陷性黄土",{"key":33,"text":276,"correct":22},"碎石类土","ACE",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":36,"analysis":37},1126926,"土袋围堰外坡面有受冲刷危险时，可在外坡面用( )等加以防护。",[282,284,286,288,290],{"key":20,"text":283,"correct":22},"麻袋",{"key":24,"text":285,"correct":22},"玻璃纤维袋",{"key":27,"text":287,"correct":22},"无纺布袋",{"key":30,"text":289,"correct":22},"草袋",{"key":33,"text":291,"correct":35},"黏土",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":36,"analysis":37},1126927,"关于围堰施工的说明，正确的有（）。",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"围堰应防水严密，不得渗漏",{"key":24,"text":299,"correct":22},"围堰应便于施工、维护及拆除。围堰材质不得对现况河道水质产生污染",{"key":27,"text":301,"correct":22},"围堰应减少对现状河道通航、导流的影响。对河流断面被围壤压缩而引起的冲刷，应有防护措施",{"key":30,"text":303,"correct":22},"堰内平面尺寸应满足基础施工的需要",{"key":33,"text":305,"correct":35},"围堰高度应与施工期间可能出现的最高水位（包括浪高）相同",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":163,"analysis":37},1126928,"城市桥梁工程常用的沉入桩有( )。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"钢筋混凝土桩",{"key":24,"text":313,"correct":22},"预应力混凝土管桩",{"key":27,"text":315,"correct":35},"工字钢桩",{"key":30,"text":317,"correct":22},"钢管桩",{"key":33,"text":319,"correct":35},"SMW桩",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":206,"analysis":37},1126929,"对地质复杂的大桥、特大桥，沉入桩施工前应进行试桩，其目的是( )。",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"检验桩的承载能力",{"key":24,"text":327,"correct":35},"确定贯入度",{"key":27,"text":329,"correct":22},"确定沉桩工艺",{"key":30,"text":331,"correct":35},"确定桩端标高",{"key":33,"text":333,"correct":35},"确定桩身强度",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":36,"analysis":37},1126930,"某城市桥梁工程，在钻孔灌注桩的施工过程中，采用反循环回转钻孔原理，在钻孔灌注桩施工前进行护筒埋设工作，但是在利用导管灌注水下混凝土时发现导管内大量进水，立即进行补救措施，幸好没有造成严重损失。 钻孔灌注桩施工前应掌握（）。",[338,340,342,344,346],{"key":20,"text":339,"correct":22},"工程地质资料",{"key":24,"text":341,"correct":22},"水文地质资料",{"key":27,"text":343,"correct":22},"具备所用各种原材料",{"key":30,"text":345,"correct":22},"制品的质量检验报告",{"key":33,"text":347,"correct":35},"施工机械、工艺及穿越土层情况进行配合比设计",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":221,"analysis":37},1126931,"关于沉入桩施工技术要点，正确的有( )。",[352,354,356,358,360],{"key":20,"text":353,"correct":22},"沉桩时，桩锤、桩帽或送桩帽应和桩身在同一中心线上",{"key":24,"text":355,"correct":35},"桩身垂直度偏差不得超过1%",{"key":27,"text":357,"correct":22},"接桩可采用焊接、法兰连接或机械连接",{"key":30,"text":359,"correct":22},"终止锤击应以控制桩端设计高程为主，贯入度为辅",{"key":33,"text":361,"correct":22},"沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":163,"analysis":37},1126932,"在一个基坑内沉入多根桩时，下列有关打桩顺序的说法中，正确的有( )。",[366,368,370,372,374],{"key":20,"text":367,"correct":22},"根据基础的设计高程，宜先深后浅",{"key":24,"text":369,"correct":22},"密集群桩由中心向四边打",{"key":27,"text":371,"correct":35},"根据桩的规格，宜先小后大",{"key":30,"text":373,"correct":22},"根据桩的规格，宜先大后小",{"key":33,"text":375,"correct":35},"根据桩的规格，宜先短后长",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":109,"analysis":37},1126933,"下述沉入桩的打桩顺序中，正确的有( )。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"密集群桩由中心向四周对称施打",{"key":24,"text":383,"correct":22},"密集群桩由中心向两个方向对称施打",{"key":27,"text":385,"correct":35},"先打浅桩，后打深桩",{"key":30,"text":387,"correct":22},"先打大桩，后打小桩",{"key":33,"text":389,"correct":22},"先打长桩，后打短桩",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":277,"analysis":37},1126934,"在钻孔灌注桩施工中，属于干作业成孔的方法有( )。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"长螺旋钻孔",{"key":24,"text":397,"correct":35},"回转钻机成孔",{"key":27,"text":399,"correct":22},"钻孔扩底",{"key":30,"text":401,"correct":35},"潜水钻机成孔",{"key":33,"text":403,"correct":22},"人工挖孔",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":80,"analysis":37},1126935,"关于正、反循环钻孔，说法正确的有( )。",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"泥浆护壁成孔时根据泥浆补给情况控制钻进速度；保持钻机稳定",{"key":24,"text":411,"correct":22},"发生斜孔、塌孔和护筒周围冒浆、失稳等现象时，应停钻采取相应措施",{"key":27,"text":413,"correct":22},"达到设计深度，灌注混凝土之前，孔底沉渣厚度应符合设计要求",{"key":30,"text":415,"correct":35},"设计未要求时，端承型桩的沉渣厚度不应大于150mm",{"key":33,"text":417,"correct":22},"设计未要求时，摩擦型桩的沉渣厚度不应大于300mm",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":221,"analysis":37},1126936,"关于人工挖孔桩，说法正确的有( )。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"适用于地下水位以上的黏性土、黄土及人工填土",{"key":24,"text":425,"correct":35},"挖孔桩截面一般为圆形孔径1200～2000mm，最大可达5000mm",{"key":27,"text":427,"correct":22},"挖孔深度不宜超过25m",{"key":30,"text":429,"correct":22},"必须做到孔底表面无松渣、泥、沉淀土",{"key":33,"text":431,"correct":22},"采用混凝土或钢筋混凝土支护孔壁技术",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":277,"analysis":37},1126937,"冲击钻成孔中遇到( )等情况时，应采取措施后方可继续施工。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"斜孔",{"key":24,"text":439,"correct":35},"缩孔",{"key":27,"text":441,"correct":22},"梅花孔",{"key":30,"text":443,"correct":35},"失稳",{"key":33,"text":445,"correct":22},"塌孔",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":457,"analysis":37},1126938,"泥浆制备根据施工机械、工艺及穿越土层情况进行配合比设计，宜选用( )。",[450,452,454,455,456],{"key":20,"text":451,"correct":22},"高塑性黏土",{"key":24,"text":453,"correct":22},"膨润土",{"key":27,"text":248,"correct":35},{"key":30,"text":242,"correct":35},{"key":33,"text":250,"correct":35},"AB",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":277,"analysis":37},1126939,"下列灌注钻孔桩水下混凝土用的导管应符合的要求，正确的有( )。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"导管内壁应光滑圆顺，直径宜为20～30cm，节长宜为2m",{"key":24,"text":465,"correct":35},"导管轴线偏差不宜超过孔深的1%，且不宜大于10cm",{"key":27,"text":467,"correct":22},"导管采用法兰盘接头宜加锥形活套",{"key":30,"text":469,"correct":35},"采用螺旋丝扣型接头宜加防松脱装置",{"key":33,"text":471,"correct":22},"使用前应试拼、试压，试压的压力宜为孔底静水压力的1.5倍",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":486,"analysis":37},1126940,"下列钻孔桩钢筋笼与混凝土灌注施工要点，错误的有( )。",[476,478,480,482,484],{"key":20,"text":477,"correct":35},"钢筋笼制作、运输和吊装过程中应防止变形",{"key":24,"text":479,"correct":22},"钢筋笼放入泥浆后5h内必须浇筑混凝土",{"key":27,"text":481,"correct":22},"宜采用预拌混凝土，其骨料粒径不宜大45mm",{"key":30,"text":483,"correct":35},"浇筑时混凝土的温度不得低于5℃",{"key":33,"text":485,"correct":35},"当气温高于30℃时，应根据具体情况对混凝土采取缓凝措施","BC",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":36,"analysis":37},1126941,"关于柱式墩台施工要求，正确的有( )。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"墩台柱与承台基础接触面应凿毛处理，清除钢筋污锈",{"key":24,"text":494,"correct":22},"浇筑墩台柱混凝土时，应铺同配合比的水泥砂浆一层",{"key":27,"text":496,"correct":22},"柱身高度内有系梁连接时，系梁应与柱同步浇筑",{"key":30,"text":498,"correct":22},"V形墩柱混凝土应对称浇筑",{"key":33,"text":500,"correct":35},"分层浇筑时，接缝应按施工缝处理",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":52,"analysis":37},1126942,"下列重力式混凝土墩、台施工要求，正确的有( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"墩台混凝土浇筑前应对基础混凝土顶面做凿毛处理，清除锚筋污锈",{"key":24,"text":508,"correct":35},"墩台混凝土宜水平分层浇筑，每层高度宜为1m",{"key":27,"text":510,"correct":22},"墩台混凝土分块浇筑时，每块面积不得小于50㎡",{"key":30,"text":512,"correct":22},"明挖基础上灌筑墩、台第一层混凝土时，要防止水分被基础吸收",{"key":33,"text":514,"correct":35},"墩台混凝土分块浇筑时，接缝应与墩台截面尺寸较大的一边平行，邻层分块接缝应错开",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":109,"analysis":37},1126943,"关于重力式砌体墩台施工要求，正确的有( )。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"墩台砌筑前，应清理基础，保持洁净，并测量放线，设置线杆",{"key":24,"text":522,"correct":22},"墩台砌体应采用坐浆法分层砌筑，竖缝均应错开，不得贯通",{"key":27,"text":524,"correct":35},"砌筑墩台镶面石应从直线部分开始",{"key":30,"text":526,"correct":22},"桥墩分水体镶面石的抗压强度不得低于设计要求",{"key":33,"text":528,"correct":22},"砌筑的石料和混凝土预制块应清洗干净，保持湿润",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":80,"analysis":37},1126944,"关于简支梁板吊运方案的要求，正确的有( )。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"编制专项方案，并按有关规定进行论证、批准",{"key":24,"text":536,"correct":22},"应进行吊车等机具的安全性验算",{"key":27,"text":538,"correct":22},"起吊过程中构件内产生的应力验算必须符合要求",{"key":30,"text":540,"correct":35},"应对施工现场条件和拟定运输路线上的社会交通进行充分调研和评估",{"key":33,"text":542,"correct":22},"按照起重吊装的有关规定，选择吊运工具、设备",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":277,"analysis":37},1126945,"安装构件前，支承结构和预埋件的()应符合设计要求且验收合格。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"尺寸",{"key":24,"text":550,"correct":35},"外形",{"key":27,"text":552,"correct":22},"标高",{"key":30,"text":554,"correct":35},"数量",{"key":33,"text":556,"correct":22},"平面位置",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":36,"analysis":37},1126946,"起重机架梁作业前应检查的事项包括( )。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"必须检查梁板外形及其预埋件尺寸和位置，其偏差不应超过设计或规范允许值",{"key":24,"text":564,"correct":22},"支承结构（墩台、盖梁等）的强度应符合设计要求",{"key":27,"text":566,"correct":22},"支承结构和预埋件的尺寸、标高及平面位置应符合设计要求且验收合格",{"key":30,"text":568,"correct":22},"桥梁支座的安装质量应符合要求，其规格、位置及标高应准确无误",{"key":33,"text":570,"correct":35},"千斤顶起落梁的技术要求",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":36,"analysis":37},1126947,"关于简支梁板安装就位的技术要求，正确的有( )。",[575,577,579,581,582],{"key":20,"text":576,"correct":22},"安装构件前必须检查构件外形及其预埋件尺寸和位置，其偏差不应超过设计或规范允许值",{"key":24,"text":578,"correct":22},"吊装前应验收合格",{"key":27,"text":580,"correct":22},"架桥机过孔时，应将起重小车置于对稳定最有利的位置，且抗倾覆系数应不小于1.5",{"key":30,"text":568,"correct":22},{"key":33,"text":583,"correct":35},"装配式桥梁构件在脱底模、移运、堆放和吊装就位时，混凝土的强度设计无要求时一般不应低于设计强度的50%",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":277,"analysis":37},1126948,"现浇预应力混凝土连续梁，常用的施工方法有( )。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"支架法",{"key":24,"text":591,"correct":35},"顶推法",{"key":27,"text":593,"correct":22},"移动模架法",{"key":30,"text":595,"correct":35},"悬臂拼装法",{"key":33,"text":597,"correct":22},"悬臂浇筑法",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":263,"analysis":37},1126949,"在移动模架上浇筑预应力混凝土连续梁，箱梁内、外模板在滑动就位时，模板的（）误差必须在容许范围内。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"预拱度",{"key":24,"text":605,"correct":22},"平面尺寸",{"key":27,"text":607,"correct":22},"高程",{"key":30,"text":609,"correct":35},"变形",{"key":33,"text":611,"correct":35},"挠度",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":124,"analysis":37},1126950,"悬臂浇筑用挂篮结构中，安全系数不得小于2的有( )。",[616,618,620,622,624],{"key":20,"text":617,"correct":35},"吊带",{"key":24,"text":619,"correct":22},"自锚固系统",{"key":27,"text":621,"correct":22},"斜拉水平限位系统",{"key":30,"text":623,"correct":22},"上水平限位安全系数",{"key":33,"text":625,"correct":22},"施工、行走时的抗倾覆安全系数",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":36,"analysis":37},1126951,"关于移动模架法现浇预应力混凝土连续梁的要求，正确的有( )。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"模架长度必须满足施工要求",{"key":24,"text":633,"correct":22},"模架应利用专用设备组装，在施工时能确保质量和安全",{"key":27,"text":635,"correct":22},"内、外模板就位时，其平面尺寸、高程、预拱度的误差必须控制在容许范围内",{"key":30,"text":637,"correct":22},"预应力筋管道、钢筋、预埋件设置应符合规范规定和设计要求",{"key":33,"text":639,"correct":35},"浇筑分段工作缝，宜设在弯矩零点附近",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":80,"analysis":37},1126952,"关于支架法现浇预应力混凝土连续梁的要求，正确的有( )。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"支架的地基承载力应符合要求",{"key":24,"text":647,"correct":22},"安装支架时，应根据梁体和支架的弹性、非弹性变形，设置预拱度",{"key":27,"text":649,"correct":22},"支架底部应有良好的排水措施，不得被水浸泡",{"key":30,"text":651,"correct":35},"浇筑混凝土时应采取防止支架均匀下沉的措施",{"key":33,"text":653,"correct":22},"有简便可行的落架拆模措施",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":486,"analysis":37},1126953,"支架法现浇预应力混凝土连续梁，各种支架和模板安装后，采取预压方法消除( )变形。",[658,660,662,664,666],{"key":20,"text":659,"correct":35},"支架弹性",{"key":24,"text":661,"correct":22},"拼装间隙非弹性",{"key":27,"text":663,"correct":22},"地基沉降非弹性",{"key":30,"text":665,"correct":35},"地基弹性",{"key":33,"text":667,"correct":35},"梁体弹性",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":139,"analysis":37},1126954,"悬臂浇筑法施工连续梁合龙段时，应符合的规定有( )。",[672,674,676,678,680],{"key":20,"text":673,"correct":35},"合龙前，应在两端悬臂预加压重，直至施工完成后撤除",{"key":24,"text":675,"correct":22},"合龙前，应将合龙跨一侧墩的临时锚固放松",{"key":27,"text":677,"correct":22},"合龙段的混凝土强度提高一级的主要目的是尽早施加预应力",{"key":30,"text":679,"correct":22},"合龙段的长度可为2m",{"key":33,"text":681,"correct":35},"合龙段应在一天中气温最高时进行",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":36,"analysis":37},1126955,"悬浇梁体一般分为( )浇筑。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"墩顶梁段(0号块)",{"key":24,"text":689,"correct":22},"0号块两侧对称悬浇梁段",{"key":27,"text":691,"correct":22},"边孔支架现浇梁段",{"key":30,"text":693,"correct":22},"主梁跨中合龙段",{"key":33,"text":695,"correct":35},"预应力筋管道接缝处",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":36,"analysis":37},1126956,"管涵通常采用工厂预制钢筋混凝土管的成品管节，管节断面形式分为( )等。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"圆形",{"key":24,"text":703,"correct":22},"椭圆形",{"key":27,"text":705,"correct":22},"卵形",{"key":30,"text":707,"correct":22},"矩形",{"key":33,"text":709,"correct":35},"正六边形",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":80,"analysis":37},1126957,"下列管涵施工技术要求，正确的有( )。",[714,716,718,720,722],{"key":20,"text":715,"correct":22},"基础上面应设混凝土管座，其顶部弧形面应与管身紧密贴合",{"key":24,"text":717,"correct":22},"当管涵为无混凝土基础，应按设计要求将管底土层压实，做成与管身密贴的弧形管座",{"key":27,"text":719,"correct":22},"当管涵为无混凝土基础，管底土层承载力不符合设计要求时，应按规范要求加固",{"key":30,"text":721,"correct":35},"沉降缝应设在非管节接缝处",{"key":33,"text":723,"correct":22},"进出水口沟床应整理直顺，与上下游导流排水系统连接顺畅、稳固",[725,729,732,735,738,741],{"id":726,"name":727,"category":7,"favorite":728},1,"领导干部任职前廉政法规知识测试题",92,{"id":730,"name":731,"category":7,"favorite":726},595,"建筑结构与设备",{"id":733,"name":734,"category":7,"favorite":726},715,"招标采购专业知识与法律法规",{"id":736,"name":737,"category":7,"favorite":726},848,"市政方向-通用基础",{"id":739,"name":740,"category":7,"favorite":8},534,"BIM工程师",{"id":742,"name":740,"category":7,"favorite":8},535]