[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,46,50,2846,[13,38,53,68,83,97,112,126,141,155,169,183,198,213,227,241,255,270,282,297,311,324,338,352,366,380,394,409,423,438,450,461,472,486,501,515,529,543,557,571,585,600,613,627,641,655,669,683,697,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126855,2,"多选题","安全检查分为综合安全检查、（ ）等。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","安全巡查",true,{"key":24,"text":25,"correct":22},"B","专项安全检查",{"key":27,"text":28,"correct":22},"C","季节性安全检查",{"key":30,"text":31,"correct":32},"D","安全暗访",false,{"key":34,"text":35,"correct":22},"E","特定条件下的安全检查","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126856,"基坑支护结构出现坍塌征兆时，可以采取（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"坡顶卸载",{"key":24,"text":45,"correct":32},"增加内支撑或锚杆",{"key":27,"text":47,"correct":22},"灌水",{"key":30,"text":49,"correct":32},"被动土压区堆载或注浆加固",{"key":34,"text":51,"correct":22},"回填土","CE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1126857,"现场安全检查方法包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"综合",{"key":24,"text":60,"correct":22},"专项",{"key":27,"text":62,"correct":22},"季节性",{"key":30,"text":64,"correct":22},"特定条件下",{"key":34,"text":66,"correct":32},"月度","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1126858,"基坑施工时的安全技术要求有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"基坑坡度或支护结构的确定方法应科学",{"key":24,"text":75,"correct":22},"尽量减少基坑顶边的堆载",{"key":27,"text":77,"correct":32},"基坑顶边不得行驶载重车辆",{"key":30,"text":79,"correct":22},"做好降水措施，确保基坑开挖期间的稳定",{"key":34,"text":81,"correct":22},"严格按设计要求开挖和支撑","ABDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},1126859,"施工监控测量的原则有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"可靠性原则",{"key":24,"text":90,"correct":22},"多层次监测原则",{"key":27,"text":92,"correct":22},"重点监测关键区域原则",{"key":30,"text":94,"correct":22},"经济合理原则",{"key":34,"text":96,"correct":32},"高标准严要求原则",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1126860,"隧道施工开挖过程做法正确的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":32},"在城市进行爆破施工，必须事先编制爆破方案，报城市主管部门批准后方可施工",{"key":24,"text":104,"correct":22},"每次开挖长度应严格按照设计要求、土质情况确定",{"key":27,"text":106,"correct":22},"同一隧道内相对开挖（非爆破方法）的两开挖面距离为2倍洞跨且不小于10m时，一端应停止掘进",{"key":30,"text":108,"correct":32},"两条平行隧道（含导洞）相距小于2倍洞跨时，其开挖面前后错开距离不得小于15m",{"key":34,"text":110,"correct":22},"隧道内应加强通风，在有瓦斯的隧道内进行爆破作业必须遵守现行《煤矿安全规程》的有关规定","BCE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},1126861,"旧桥梁拆除施工时专家论证应考虑的问题有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"安全性的保障",{"key":24,"text":119,"correct":22},"施工的可行性",{"key":27,"text":121,"correct":22},"对交通的影响",{"key":30,"text":123,"correct":22},"对环境的影响",{"key":34,"text":125,"correct":32},"施工的成本",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1126862,"施工技术资料中工程名称、开竣工日期、编制单位、卷册编号等都是封面应包含的内容，还应有（ ）签字和盖公章。",[130,132,134,136,138],{"key":20,"text":131,"correct":32},"单位负责人",{"key":24,"text":133,"correct":22},"单位技术负责人",{"key":27,"text":135,"correct":32},"项目技术负责人",{"key":30,"text":137,"correct":22},"法人代表或法人委托人",{"key":34,"text":139,"correct":32},"监理工程师","BD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":67,"analysis":37},1126863,"城市地下管线工程包含（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"给水管线",{"key":24,"text":148,"correct":22},"排水管线",{"key":27,"text":150,"correct":22},"燃气管线",{"key":30,"text":152,"correct":22},"供热管线",{"key":34,"text":154,"correct":32},"地下电缆管线",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":67,"analysis":37},1126864,"施工安全措施和应急预案的制订应注意（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"建立安全保证体系",{"key":24,"text":162,"correct":22},"建立安全防护措施",{"key":27,"text":164,"correct":22},"建立信息及时反馈机制",{"key":30,"text":166,"correct":22},"必要的设备、物资准备，在发生突然情况时能及时控制和调整",{"key":34,"text":168,"correct":32},"建立施工组织方案",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":36,"analysis":37},1126865,"工程竣工报告应包括（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"在施工单位自行检查验收合格的基础上，申请竣工验收",{"key":24,"text":176,"correct":22},"工程概况",{"key":27,"text":178,"correct":22},"由施工单位编制，在工程完工后提交建设单位",{"key":30,"text":180,"correct":32},"工程施工质量检查",{"key":34,"text":182,"correct":22},"符合法律法规及工程建设强制性标准情况",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1126866,"下列选项中，属于检验批验收合格依据有（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"主控项目的质量经抽样检验合格",{"key":24,"text":190,"correct":32},"一般项目抽样检验合格",{"key":27,"text":192,"correct":22},"主要材料的进场验收和复验合格",{"key":30,"text":194,"correct":22},"主要材料的质量保证资料.试验检测资料齐全.正确",{"key":34,"text":196,"correct":32},"施工单位自检合格","ACD",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1126867,"下列招标程序中，描述正确的有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"工程量清单是招标文件的重要组成部分",{"key":24,"text":205,"correct":22},"评标委员会人数由5～7名奇数专家组成",{"key":27,"text":207,"correct":32},"招标文件一旦发出，不得修改",{"key":30,"text":209,"correct":32},"专家组成员由招投标人各方代表组成",{"key":34,"text":211,"correct":32},"评标结束后，评标报告应由所有评标专家签字，评标结果应保密","AB",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":36,"analysis":37},1126868,"招标文件一般包括：投标邀请书、投标人须知、投标文件格式及（ ）等。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"评标标准和方法",{"key":24,"text":220,"correct":22},"工程量清单",{"key":27,"text":222,"correct":22},"合同主要条款",{"key":30,"text":224,"correct":32},"施工组织方案",{"key":34,"text":226,"correct":22},"施工图纸",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":197,"analysis":37},1126869,"关于投标保证金规定的说法，正确的有（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":22},"招标人可以在招标文件中要求投标人提交投标保证金",{"key":24,"text":234,"correct":32},"招标人可以口头要求投标人提交投标保证金",{"key":27,"text":236,"correct":22},"投标保证金一般不得超过投标总价的2%，但最高不得超过50万元人民币",{"key":30,"text":238,"correct":22},"投标保证金有效期与投标有效期相同",{"key":34,"text":240,"correct":32},"投标保证金有效期可超出投标有效期30d",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":36,"analysis":37},1126870,"关于编制技术标书要求的说法，准确的有（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"主要施工方案针对性强，重点.难点分析准确，保障措施得当。",{"key":24,"text":248,"correct":22},"施工现场总平面图布置合理，能根据施工进程合理调整",{"key":27,"text":250,"correct":22},"进度计划标有关键线路且有相应保证措施",{"key":30,"text":252,"correct":32},"有质量保证体系",{"key":34,"text":254,"correct":22},"安全防护.文明施工人员到位，措施有力，对突发事故的应急预案全面，针对性强。",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1126871,"工程量清单报价中，不得作为竞争性费用的有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":32},"材料费",{"key":24,"text":262,"correct":22},"安全文明施工费",{"key":27,"text":264,"correct":32},"企业管理费",{"key":30,"text":266,"correct":22},"规费",{"key":34,"text":268,"correct":22},"税金","BDE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":82,"analysis":37},1126872,"工程量清单计价是投标人完成招标人提供的拟建工程项目的工程量清单内容所需要的全部费用，包括（ ）。",[274,276,278,280,281],{"key":20,"text":275,"correct":22},"分部分项工程费",{"key":24,"text":277,"correct":22},"措施项目费",{"key":27,"text":279,"correct":32},"直接工程费",{"key":30,"text":266,"correct":22},{"key":34,"text":268,"correct":22},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1126873,"施工图预算对建设单位的作用，描述正确的有（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"可根据施工图预算造价筹集建设资金",{"key":24,"text":289,"correct":22},"施工图预算是控制造价及资金合理使用的依据",{"key":27,"text":291,"correct":22},"施工图预算是确定招标控制价的重要参考依据",{"key":30,"text":293,"correct":32},"施工图预算是安排调配施工力量.组织材料供应的依据",{"key":34,"text":295,"correct":32},"施工图预算是进行“两算”对比的依据。","ABC",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":197,"analysis":37},1126876,"桥梁通常包括( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"支座系统",{"key":24,"text":304,"correct":32},"护坡",{"key":27,"text":306,"correct":22},"墩台基础",{"key":30,"text":308,"correct":22},"桥跨结构",{"key":34,"text":310,"correct":32},"桩",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":323,"analysis":37},1126877,"梁式桥的下部结构是指( )。",[315,316,318,320,322],{"key":20,"text":308,"correct":32},{"key":24,"text":317,"correct":32},"防排水系统",{"key":27,"text":319,"correct":22},"桥墩",{"key":30,"text":321,"correct":22},"桥台",{"key":34,"text":306,"correct":22},"CDE",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":36,"analysis":37},1126878,"下列说法中属于梁式桥特征的有( )。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"在竖向荷载作用下无水平反力",{"key":24,"text":331,"correct":22},"外力作用方向与承重结构的轴线接近垂直",{"key":27,"text":333,"correct":22},"与同样跨径的其他结构体系相比，梁内产生的弯矩最大",{"key":30,"text":335,"correct":32},"通常需用预应力钢筋混凝土建造",{"key":34,"text":337,"correct":22},"通常需用抗弯能力强的材料建造",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":296,"analysis":37},1126879,"模板支架安装时要求( )。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"支架立柱必须落在有足够承载力的地基上，立柱底端必须放置垫板或混凝土垫块",{"key":24,"text":345,"correct":22},"支架地基严禁被水浸泡，冬期施工必须采取防止冻胀的措施",{"key":27,"text":347,"correct":22},"安设支架、拱架过程中，应随安装随架设临时支撑",{"key":30,"text":349,"correct":32},"支架或拱架必须与施工脚手架、便桥相连牢固",{"key":34,"text":351,"correct":32},"安装模板应与钢筋工序配合进行，妨碍绑扎钢筋的模板，应待模板工序结束后再绑扎钢筋",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":36,"analysis":37},1126880,"关于支架、拱架搭设要求，正确的有( )。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"支架立柱底端必须放置垫板或混凝土垫块",{"key":24,"text":359,"correct":22},"支架通行孔的两边应加护栏，夜间应设警示灯",{"key":27,"text":361,"correct":22},"易受漂流物冲撞的河中支架应设牢固的防护设施",{"key":30,"text":363,"correct":32},"支架或拱架应与施工脚手架、便桥相连",{"key":34,"text":365,"correct":22},"支架、拱架安装完毕，经检验合格后方可安装模板",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":140,"analysis":37},1126881,"模板、支架和拱架拆除应遵循的原则有( )。",[370,372,374,376,378],{"key":20,"text":371,"correct":32},"先支先拆、后支后拆",{"key":24,"text":373,"correct":22},"卸落量宜由小渐大",{"key":27,"text":375,"correct":32},"在横向应对称均衡卸落、在纵向应同时卸落",{"key":30,"text":377,"correct":22},"预应力混凝土结构的侧模应在预应力张拉前拆除",{"key":34,"text":379,"correct":32},"底模应在结构建立预应力前拆除",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":67,"analysis":37},1126882,"关于模板搭设、拆除要求，正确的有( )。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"安装模板应与钢筋工序配合进行",{"key":24,"text":387,"correct":22},"安装墩、台模板时，其底部应与基础预埋件连接牢固，上部应采用拉杆固定",{"key":27,"text":389,"correct":22},"模板在安装过程中，必须设置防倾覆设施",{"key":30,"text":391,"correct":22},"预应力混凝土结构的底模应在结构建立预应力后拆除",{"key":34,"text":393,"correct":32},"拆除非承重侧模应在混凝土强度达到2MPa以上",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":408,"analysis":37},1126883,"钢筋在运输、储存、加工过程中应防止()。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"锈蚀",{"key":24,"text":401,"correct":22},"污染",{"key":27,"text":403,"correct":32},"浸水",{"key":30,"text":405,"correct":22},"变形",{"key":34,"text":407,"correct":32},"冷冻","ABD",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":82,"analysis":37},1126884,"钢筋下料前，应核对钢筋( )并应根据设计要求和钢筋长度配料。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"品种",{"key":24,"text":416,"correct":22},"规格",{"key":27,"text":418,"correct":32},"合格证",{"key":30,"text":420,"correct":22},"等级",{"key":34,"text":422,"correct":22},"加工数量",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":437,"analysis":37},1126885,"关于钢筋加工的说法，正确的有（）。",[427,429,431,433,435],{"key":20,"text":428,"correct":32},"钢筋弯制前应先将钢筋制作成弧形",{"key":24,"text":430,"correct":22},"受力钢筋的末端弯钩应符合设计和规范要求",{"key":27,"text":432,"correct":32},"箍筋末端弯钩平直部分的长度，可根据钢筋材料长度确定",{"key":30,"text":434,"correct":32},"钢筋应在加热的情况下弯制",{"key":34,"text":436,"correct":22},"钢筋弯钩应一次弯制成型","BE",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":449,"analysis":37},1126886,"钢筋混凝土结构所用钢筋的( )等均应符合设计要求和现行国家标准。",[442,443,444,445,447],{"key":20,"text":414,"correct":22},{"key":24,"text":420,"correct":32},{"key":27,"text":416,"correct":22},{"key":30,"text":446,"correct":32},"牌号",{"key":34,"text":448,"correct":22},"性能","ACE",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":460,"analysis":37},1126887,"钢筋下料前应核对( )，并应根据设计要求配料。",[454,455,457,458,459],{"key":20,"text":414,"correct":22},{"key":24,"text":456,"correct":32},"钢筋强度",{"key":27,"text":416,"correct":22},{"key":30,"text":422,"correct":22},{"key":34,"text":420,"correct":22},"ACDE",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":140,"analysis":37},1126888,"钢筋下料后应按( )分别挂牌标明。",[465,466,468,469,471],{"key":20,"text":414,"correct":32},{"key":24,"text":467,"correct":22},"种类",{"key":27,"text":416,"correct":32},{"key":30,"text":470,"correct":22},"使用部位",{"key":34,"text":420,"correct":32},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":323,"analysis":37},1126889,"钢筋施工包括( )等内容。",[476,478,480,482,484],{"key":20,"text":477,"correct":32},"钢筋验收",{"key":24,"text":479,"correct":32},"钢筋下料",{"key":27,"text":481,"correct":22},"钢筋加工",{"key":30,"text":483,"correct":22},"钢筋连接",{"key":34,"text":485,"correct":22},"钢筋骨架和钢筋网的组成与安装",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":500,"analysis":37},1126890,"钢筋与钢板的T形连接宜采用( )。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"电弧焊",{"key":24,"text":493,"correct":32},"闪光对焊",{"key":27,"text":495,"correct":22},"埋弧压力焊",{"key":30,"text":497,"correct":32},"氩弧焊",{"key":34,"text":499,"correct":32},"电阻点焊","AC",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":408,"analysis":37},1126891,"关于钢筋混凝土桥梁钢筋接头设置的说法，正确的有( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"同一根钢筋上宜少设接头",{"key":24,"text":508,"correct":22},"钢筋接头应设在受力较小区段",{"key":27,"text":510,"correct":32},"钢筋受力分不清受拉、受压的，按受压办理",{"key":30,"text":512,"correct":22},"在任一焊接或绑扎接头长度区段内，同一根钢筋不得有两个接头",{"key":34,"text":514,"correct":32},"钢筋接头部位横向净距不得小于20mm",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":528,"analysis":37},1126892,"钢筋接头设置应符合下列( )的规定。",[519,521,523,524,526],{"key":20,"text":520,"correct":32},"钢筋接头部位横向净距不得小于钢筋直径，且不得小于20mm",{"key":24,"text":522,"correct":22},"钢筋接头应设在受力较小区段，不宜位于构件的最大负弯矩处",{"key":27,"text":512,"correct":22},{"key":30,"text":525,"correct":32},"接头末端至钢筋弯起点的距离不得小于钢筋直径的5倍",{"key":34,"text":527,"correct":32},"施工中钢筋受力分不清受拉、受压的，按受压办理","BC",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":67,"analysis":37},1126893,"下列钢筋现场绑扎规定中，正确的有( )。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"钢筋的交叉点应采用绑丝绑牢，必要时可辅以点焊",{"key":24,"text":536,"correct":22},"钢筋网的外围两行钢筋交叉点应全部扎牢，中间部分交叉点可间隔交错扎牢",{"key":27,"text":538,"correct":22},"钢筋骨架的多层钢筋之间，应用短钢筋支垫，确保位置准确",{"key":30,"text":540,"correct":22},"双向受力的钢筋网，钢筋交叉点必须全部扎牢",{"key":34,"text":542,"correct":32},"各种断面形状柱的所有竖向钢筋弯钩平面应朝向圆心",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":67,"analysis":37},1126894,"常用的混凝土外加剂有( )。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"减水剂",{"key":24,"text":550,"correct":22},"早强剂",{"key":27,"text":552,"correct":22},"缓凝剂",{"key":30,"text":554,"correct":22},"速凝剂",{"key":34,"text":556,"correct":32},"稀释剂",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":67,"analysis":37},1126895,"下列设计无规定时混凝土中钢筋保护层厚度的说法，正确的有( )。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"普通钢筋和预应力直线形钢筋的最小保护层厚度不得小于钢筋公称直径",{"key":24,"text":564,"correct":22},"后张法构件预应力直线形钢筋的最小保护层厚度不得小于其管道直径的1\u002F2",{"key":27,"text":566,"correct":22},"钢筋机械连接件的最小保护层厚度不得小于20mm",{"key":30,"text":568,"correct":22},"应在钢筋与模板之间设置垫块，确保钢筋的混凝土保护层厚度",{"key":34,"text":570,"correct":32},"垫块应布置成矩形，并与钢筋绑扎牢固",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":82,"analysis":37},1126896,"配制高强混凝土的矿物掺合料可选用( )。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"优质粉煤灰",{"key":24,"text":578,"correct":22},"磨细矿渣粉",{"key":27,"text":580,"correct":32},"磨细石灰粉",{"key":30,"text":582,"correct":22},"硅粉",{"key":34,"text":584,"correct":22},"磨细天然沸石粉",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":599,"analysis":37},1126897,"关于混凝土拌合物坍落度的检测规定，正确的有( )。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"应在搅拌地点和浇筑地点分别随机取样检测",{"key":24,"text":592,"correct":32},"混凝土从出料至入模的时间不超过20min，可仅在搅拌地点检测",{"key":27,"text":594,"correct":32},"每一工作班或每一单元结构物检测不应少于一次",{"key":30,"text":596,"correct":22},"评定时应以浇筑地点的测值为准",{"key":34,"text":598,"correct":22},"在检测坍落度时，还应观察混凝土拌合物的黏聚性和保水性","ADE",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":140,"analysis":37},1126898,"混凝土雨期施工应增加骨料含水率的测定次数，根据测定结果调整( )用量。",[604,606,608,610,612],{"key":20,"text":605,"correct":32},"水泥",{"key":24,"text":607,"correct":22},"骨料",{"key":27,"text":609,"correct":32},"粉煤灰",{"key":30,"text":611,"correct":22},"水",{"key":34,"text":548,"correct":32},{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":36,"analysis":37},1126899,"下列关于混凝土洒水养护的说法中正确的有( )。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"应在混凝土收浆后尽快予以覆盖和洒水养护",{"key":24,"text":620,"correct":22},"当气温低于5℃时，不得对混凝土洒水养护",{"key":27,"text":622,"correct":22},"抗渗或高强度混凝土洒水养护时间不少于14d",{"key":30,"text":624,"correct":32},"矿渣硅酸盐水泥的混凝土洒水养护时间不少于14d",{"key":34,"text":626,"correct":22},"使用真空吸水的混凝土，可在保证强度条件下适当缩短养护时间",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":67,"analysis":37},1126901,"下列关于混凝土运输的说法中正确的有( )。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"运送混凝土的容器或管道应不漏浆、不吸水、内壁光滑平整",{"key":24,"text":634,"correct":22},"应保持混凝土的均匀性，不产生分层、离析现象",{"key":27,"text":636,"correct":22},"出现分层、离析现象时，应对混凝土进行二次快速搅拌",{"key":30,"text":638,"correct":22},"运输能力应满足混凝土凝结速度和浇筑速度的要求",{"key":34,"text":640,"correct":32},"坍落度不符合要求时，可向搅拌车内加适量的水并搅拌均匀",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":197,"analysis":37},1126902,"下列对钢绞线进场的检验要求，正确的有( )。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"检查质量证明书和包装",{"key":24,"text":648,"correct":32},"分批检验，每批重量不大于65t",{"key":27,"text":650,"correct":22},"每批大于3盘则任取3盘",{"key":30,"text":652,"correct":22},"每批少于3盘应全数检验",{"key":34,"text":654,"correct":32},"检验有一项不合格则该批钢绞线报废",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":449,"analysis":37},1126903,"预应力钢绞线进场时应检查和检验的项目有( )。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"表面质量",{"key":24,"text":662,"correct":32},"弯曲试验",{"key":27,"text":664,"correct":22},"外形尺寸",{"key":30,"text":666,"correct":32},"伸长率试验",{"key":34,"text":668,"correct":22},"力学性能试验",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":111,"analysis":37},1126904,"锚具、夹具及连接器进场验收时，应按出厂合格证和质量证明书核查其锚固性能类别、型号、规格、数量，确认无误后进行( )。",[673,675,677,679,681],{"key":20,"text":674,"correct":32},"强度检验",{"key":24,"text":676,"correct":22},"外观检查",{"key":27,"text":678,"correct":22},"硬度检验",{"key":30,"text":680,"correct":32},"动载锚固性能试验",{"key":34,"text":682,"correct":22},"静载锚固性能试验",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":460,"analysis":37},1126905,"后张法预应力锚具和连接器按锚固方式不同，可分为( )。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"支承式",{"key":24,"text":690,"correct":32},"楔紧式",{"key":27,"text":692,"correct":22},"握裹式",{"key":30,"text":694,"correct":22},"组合式",{"key":34,"text":696,"correct":22},"夹片式",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":82,"analysis":37},1126906,"后张预应力锚具和连接器按照锚固方式不同，可分为( )锚固。",[701,702,703,705,706],{"key":20,"text":696,"correct":22},{"key":24,"text":688,"correct":22},{"key":27,"text":704,"correct":32},"锥塞式",{"key":30,"text":692,"correct":22},{"key":34,"text":694,"correct":22},{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":721,"analysis":37},1126907,"预应力张拉锚固体系，按锚固方式分类有( )。",[711,713,715,717,719],{"key":20,"text":712,"correct":32},"钢丝束镦头锚固",{"key":24,"text":714,"correct":32},"钢绞线夹片锚固",{"key":27,"text":716,"correct":32},"精轧螺纹锚固",{"key":30,"text":718,"correct":22},"支承锚固",{"key":34,"text":720,"correct":22},"组合锚固","DE",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]