[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":733},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,45,50,2846,[13,38,53,68,83,98,113,128,142,157,172,186,200,215,230,245,259,269,284,298,313,327,340,354,368,383,397,411,425,439,453,467,481,495,509,524,539,553,567,581,595,609,623,634,648,662,676,691,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126798,2,"多选题","隧道喷锚暗挖施工前，应核对地址资料，调查沿线（ ）等，并制定保护措施。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","地质构造",false,{"key":24,"text":25,"correct":26},"B","地下构筑物",true,{"key":28,"text":29,"correct":26},"C","地下管线",{"key":31,"text":32,"correct":26},"D","地面建筑物基础",{"key":34,"text":35,"correct":22},"E","地下水分布现状","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126799,"关于注册建造师签章的法规规定，下列说法正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"分包企业签署质量合格的文件上，必须由担任总包项目负责人的注册建造师签章",{"key":24,"text":45,"correct":26},"修改注册建造师签字并加盖执业印章的工程施工管理文件，应当征得所在企业同意",{"key":28,"text":47,"correct":26},"注册建造师签章完整的工程施工管理文件方为有效",{"key":31,"text":49,"correct":22},"表格中凡要求签章的，必须签章，可以不签字",{"key":34,"text":51,"correct":26},"工程名称应填写全称，并与工程合同的工程名称一致","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1126800,"对供热管道焊接施工单位提供的焊接检验设备的要求是（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"符合焊接工艺要求",{"key":24,"text":60,"correct":22},"精度等级符合要求",{"key":28,"text":62,"correct":26},"性能稳定可靠",{"key":31,"text":64,"correct":22},"灵敏度可靠",{"key":34,"text":66,"correct":22},"配备相应的操作工","AC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1126801,"因工程建设需要挖掘城镇道路的，应到（ ）办理审批手续，方可按照规定挖掘。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"公安部",{"key":24,"text":75,"correct":22},"绿化管理部门",{"key":28,"text":77,"correct":26},"市政工程行政主管部门",{"key":31,"text":79,"correct":26},"公安交通管理部门",{"key":34,"text":81,"correct":22},"道路管理部门","CD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1126802,"下面属于大型工程的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"交通安全设施单项合同额≥500万元",{"key":24,"text":90,"correct":26},"城市绿化工程单项合同额≥500万元",{"key":28,"text":92,"correct":26},"庭院工程单项合同额≥1000万元",{"key":31,"text":94,"correct":22},"机电设备安全工程单项合同额≥500万元",{"key":34,"text":96,"correct":22},"供水管道单项合同额≥2000万元","ABC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1126803,"城市桥梁工程包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"立交桥",{"key":24,"text":105,"correct":26},"跨线桥",{"key":28,"text":107,"correct":26},"人行天桥",{"key":31,"text":109,"correct":26},"地下人行通道",{"key":34,"text":111,"correct":22},"下水道","ABCD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1126804,"下列表述中，（ ）是水池气密性试验合格标准。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"试验压力宜为池体工作压力的1.5倍",{"key":24,"text":120,"correct":22},"试验压力宜为池体工作压力的1.2倍",{"key":28,"text":122,"correct":22},"24h的气压降不超过工作压力的30%",{"key":31,"text":124,"correct":26},"24h的气压降不超过试验压力的20%",{"key":34,"text":126,"correct":22},"池体渗透量不大于标准规定","AD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":112,"analysis":37},1126805,"城市桥梁工程采用的主要材料、半成品、成品、构配件、器具和设备（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"应按相关专业质量标准进行验收",{"key":24,"text":135,"correct":26},"应按规定进行复验",{"key":28,"text":137,"correct":26},"设计结构安全和使用功能的，应按规定由监理工程师进行平行或见证取样检验",{"key":31,"text":139,"correct":26},"检测.验收.复验的结果是否合格应经监理工程师确认",{"key":34,"text":141,"correct":22},"检测.验收.复验的结果是否合格宜经监理工程师确认",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1126806,"任何单位和个人不得破坏绿化规划用地的（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"植被",{"key":24,"text":149,"correct":22},"面积",{"key":28,"text":151,"correct":26},"地形",{"key":31,"text":153,"correct":26},"地貌",{"key":34,"text":155,"correct":26},"水体","ACDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1126807,"供热管道焊接施工单位应有负责焊接工艺的（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"技术人员",{"key":24,"text":164,"correct":22},"负责人",{"key":28,"text":166,"correct":26},"检查人员",{"key":31,"text":168,"correct":22},"焊工",{"key":34,"text":170,"correct":26},"检验人员","ACE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":185,"analysis":37},1126808,"下列水池气密性试验的要求，符合规范的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"需进行满水试验和气密性试验的池体，应在气密性试验合格后，再进行满水试验",{"key":24,"text":179,"correct":26},"工艺测温孔加堵封闭、池顶盖板封闭",{"key":28,"text":181,"correct":26},"测温仪、测压仪及充气截门等均已安装完成。",{"key":31,"text":183,"correct":22},"试验压力宜为池体工作压力的1.25倍",{"key":34,"text":124,"correct":26},"BCE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":199,"analysis":37},1126810,"隧道工程开工前，应调查（ ）等资料并制订保护措施。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"机械设备情况",{"key":24,"text":193,"correct":22},"岩体类别",{"key":28,"text":195,"correct":26},"沿线地下管线",{"key":31,"text":197,"correct":26},"各构筑物",{"key":34,"text":32,"correct":26},"CDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1126816,"属于施工过程中的合同变更的有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"高程、基线、尺寸变更",{"key":24,"text":207,"correct":26},"工程量增减",{"key":28,"text":209,"correct":22},"施工机械内部调整",{"key":31,"text":211,"correct":26},"质量及特性变更",{"key":34,"text":213,"correct":26},"施工顺序变化","ABDE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1126817,"下列合同风险中，属于按风险的范围划分的有（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"国别风险",{"key":24,"text":222,"correct":26},"项目风险",{"key":28,"text":224,"correct":22},"投标阶段的风险",{"key":31,"text":226,"correct":22},"政治风险",{"key":34,"text":228,"correct":26},"地区风险","ABE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1126818,"合同风险的分散和转移有（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"减少承包方资金投入",{"key":24,"text":237,"correct":26},"向保险公司投保",{"key":28,"text":239,"correct":22},"加强索赔管理",{"key":31,"text":241,"correct":22},"加强成本控制",{"key":34,"text":243,"correct":26},"向分包商转移部分风险","BE",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":112,"analysis":37},1126819,"同期记录的内容包括（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"人员设备闲置",{"key":24,"text":252,"correct":26},"对工期的延误",{"key":28,"text":254,"correct":26},"对工程损害程度",{"key":31,"text":256,"correct":26},"导致费用增加的项目",{"key":34,"text":258,"correct":22},"计算资料",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":112,"analysis":37},1126820,"施工索赔同期记录的内容包括（ ）。",[263,265,266,267,268],{"key":20,"text":264,"correct":26},"人员设备闲置清单",{"key":24,"text":252,"correct":26},{"key":28,"text":254,"correct":26},{"key":31,"text":256,"correct":26},{"key":34,"text":258,"correct":22},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1126821,"索赔台账应反映（ ）内容。",[273,275,277,279,281],{"key":20,"text":274,"correct":26},"索赔发生原因",{"key":24,"text":276,"correct":26},"索赔意向提交时间",{"key":28,"text":278,"correct":22},"各种记录",{"key":31,"text":280,"correct":26},"监理审核结果",{"key":34,"text":282,"correct":22},"总包方审批结果","ABD",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":171,"analysis":37},1126822,"关于施工成本目标控制的原则，正确的有（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":26},"成本最低原则",{"key":24,"text":291,"correct":22},"实用性原则",{"key":28,"text":293,"correct":26},"全员成本原则",{"key":31,"text":295,"correct":22},"开拓性原则",{"key":34,"text":297,"correct":26},"目标分解原则",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},1126823,"关于施工成本管理措施，正确的有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"加强预测",{"key":24,"text":305,"correct":26},"加强定额和预算管理",{"key":28,"text":307,"correct":26},"完善原始记录和统计工作",{"key":31,"text":309,"correct":26},"建立考核和激励机制",{"key":34,"text":311,"correct":26},"建立健全责任制度","BCDE",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":97,"analysis":37},1126824,"根据《危险性较大的分部分项工程安全管理办法》，下列分部分项工程中，需要专家论证的有（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":26},"顶管工程",{"key":24,"text":320,"correct":26},"滑模模板工程",{"key":28,"text":322,"correct":26},"6m深的基坑工程",{"key":31,"text":324,"correct":22},"15m深的人工挖孔桩工程",{"key":34,"text":326,"correct":22},"最大起重量为250kN的龙门吊安装工程",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":127,"analysis":37},1126825,"占用慢行道和便道要获得（ ）的批准。",[331,333,335,337,338],{"key":20,"text":332,"correct":26},"交通管理",{"key":24,"text":334,"correct":22},"行政管理部门",{"key":28,"text":336,"correct":22},"市政管理部门",{"key":31,"text":81,"correct":26},{"key":34,"text":339,"correct":22},"公安部门",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":171,"analysis":37},1126826,"危险性较大工程包括（ ），应编制专项施工方案。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"脚手架工程",{"key":24,"text":347,"correct":22},"焊接工程",{"key":28,"text":349,"correct":26},"模板工程",{"key":31,"text":351,"correct":22},"装修工程",{"key":34,"text":353,"correct":26},"拆除.爆破工程",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":312,"analysis":37},1126827,"下列分部分项工程中，属于危险性较大的分部分项工程有（ ）",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"桥台大体积混凝土浇筑",{"key":24,"text":361,"correct":26},"开挖深度4m的基坑",{"key":28,"text":363,"correct":26},"高度6m的承重模板支架",{"key":31,"text":365,"correct":26},"在高度24m的平台上安装钢筋",{"key":34,"text":367,"correct":26},"T梁预应力筋张拉",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1126828,"属于交通导行方案保证措施的有（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":26},"施工现场按照施工方案，在主要道路交通路口设专职交通疏导员",{"key":24,"text":375,"correct":22},"在夜间22点后可加大占路范围",{"key":28,"text":377,"correct":22},"对沿街居民进行安全教育、培训、考核",{"key":31,"text":379,"correct":26},"必要处搭设便桥",{"key":34,"text":381,"correct":26},"沿街居民出入口要设置足够的照明装置","ADE",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":112,"analysis":37},1126829,"施工组织设计主要内容包括（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":26},"施工总体部署",{"key":24,"text":390,"correct":26},"现场平面布置",{"key":28,"text":392,"correct":26},"主要施工保证措施",{"key":31,"text":394,"correct":26},"施工技术方案",{"key":34,"text":396,"correct":22},"物资保证措施",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":52,"analysis":37},1126830,"使用IC卡进行劳务实名制管理可实现的管理功能有（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":26},"人员信息管理",{"key":24,"text":404,"correct":26},"门禁管理",{"key":28,"text":406,"correct":26},"工资管理",{"key":31,"text":408,"correct":22},"实时跟踪",{"key":34,"text":410,"correct":26},"考勤管理",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":52,"analysis":37},1126831,"防治大气污染做法正确的有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":26},"施工场地的主要道路、料场、生活办公区域应按规定进行硬化处理",{"key":24,"text":418,"correct":26},"裸露的场地和集中堆放的土方应采取覆盖、固化、绿化、洒水降尘措施",{"key":28,"text":420,"correct":26},"使用密目式安全网对在建建筑物、构筑物进行封闭",{"key":31,"text":422,"correct":22},"沥青要在施工现场熔融",{"key":34,"text":424,"correct":26},"施工现场应根据风力和大气湿度的具体情况，进行土方回填、转运作业",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":382,"analysis":37},1126832,"下列关于宿舍临时设施的搭设，说法正确的有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":26},"宿舍室内净高不得小于2.5m",{"key":24,"text":432,"correct":22},"宿舍内的单人床铺不得超过3层",{"key":28,"text":434,"correct":22},"人均床铺面积不得小于2.0m×2.0m",{"key":31,"text":436,"correct":26},"每间宿舍居住人数不应超过16人",{"key":34,"text":438,"correct":26},"轮流负责卫生和使用管理或安排专人管理",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":156,"analysis":37},1126833,"进入现场施工的劳务人员要佩带工作卡，卡上注明（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":26},"姓名",{"key":24,"text":446,"correct":22},"性别",{"key":28,"text":448,"correct":26},"身份证号",{"key":31,"text":450,"correct":26},"工种",{"key":34,"text":452,"correct":26},"所属劳务分包企业",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":382,"analysis":37},1126834,"关于围挡（墙）设置的说法，正确的有（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":26},"应根据地质、气候、围挡（墙）材料进行设计计算，确保围挡（墙）的稳定、安全",{"key":24,"text":460,"correct":22},"根据当地材料供应情况，因地制宜选用围挡（墙）材料，可用竹笆或安全网",{"key":28,"text":462,"correct":22},"围挡一般应高于1.8m，在市区内应高于2.1m",{"key":31,"text":464,"correct":26},"禁止在围挡内侧堆放泥土、砂石等散状材料以及架管、模板等",{"key":34,"text":466,"correct":26},"雨后、大风后以及春融季节应当检查围挡的稳定性，发现问题及时处理",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":52,"analysis":37},1126835,"减少土方外弃车辆遗撒的措施包括（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":26},"运土车不得装过满",{"key":24,"text":474,"correct":26},"对行使路线检查清扫",{"key":28,"text":476,"correct":26},"场地出入口设洗车池",{"key":31,"text":478,"correct":22},"专用道路运输",{"key":34,"text":480,"correct":26},"转弯上坡减速行使",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":156,"analysis":37},1126836,"施工进度计划在实施过程中要进行必要的调整，调整内容包括（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":26},"起止时间",{"key":24,"text":488,"correct":22},"网络计划图",{"key":28,"text":490,"correct":26},"持续时间",{"key":31,"text":492,"correct":26},"工作关系",{"key":34,"text":494,"correct":26},"资源供应",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":283,"analysis":37},1126837,"下列选项中，属于施工质量因素控制的有（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":26},"施工人员控制",{"key":24,"text":502,"correct":26},"材料质量控制",{"key":28,"text":504,"correct":22},"质量通病控制",{"key":31,"text":506,"correct":26},"机械设备质量控制",{"key":34,"text":508,"correct":22},"不合格产品控制",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":523,"analysis":37},1126838,"施工准备阶段质量控制的重点有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"质量监督",{"key":24,"text":516,"correct":26},"技术准备",{"key":28,"text":518,"correct":26},"质量计划",{"key":31,"text":520,"correct":22},"质量目标",{"key":34,"text":522,"correct":22},"考核评价","BC",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":37},1126839,"关于预应力施工的说法，正确的有（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"承担预应力施工的单位应具有相应的施工资质",{"key":24,"text":531,"correct":22},"张拉设备的校准期限不得超过1年，且不得超过300次张拉作业",{"key":28,"text":533,"correct":22},"预应力张拉应由技术员主持",{"key":31,"text":535,"correct":22},"锚固完毕经检验合格后，方可使用电弧焊切割端头多余的预应力筋",{"key":34,"text":537,"correct":26},"封锚混凝土强度不宜低于结构混凝土强度等级的80%，且不得低于30MPa","AE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":382,"analysis":37},1126840,"钻孔灌注桩塌孔与缩径产生的原因主要有（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"地层复杂",{"key":24,"text":546,"correct":22},"钻机安装不平整",{"key":28,"text":548,"correct":22},"沉渣过厚",{"key":31,"text":550,"correct":26},"护壁泥浆性能差",{"key":34,"text":552,"correct":26},"成孔后放置时间过长没有灌注混凝土",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":36,"analysis":37},1126841,"管道回填做法错误的是（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"管道两侧和管顶以上500mm范围内的回填材料，应由沟槽两侧对称运入槽内",{"key":24,"text":560,"correct":26},"需要拌合的回填材料，应在在槽内拌合均匀",{"key":28,"text":562,"correct":26},"管基有效支承角范围应采用中粗砂或土填充密实，与管壁紧密接触",{"key":31,"text":564,"correct":26},"管道回填时间宜在一昼夜中气温最高时段，从管道两侧同时回填，同时夯实",{"key":34,"text":566,"correct":22},"管道回填从管底基础部位开始到管顶以上500mm范围内，必须采用人工回填",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":67,"analysis":37},1126842,"大体积混凝土构筑物的裂缝，危害结构整体性、稳定性和耐久性的有（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":26},"贯穿裂缝",{"key":24,"text":574,"correct":22},"膨胀裂缝",{"key":28,"text":576,"correct":26},"深层裂缝",{"key":31,"text":578,"correct":22},"收缩裂缝",{"key":34,"text":580,"correct":22},"表面裂缝",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":382,"analysis":37},1126843,"为了避免混凝土结构内外温差过大而造成给水排水构筑物出现渗漏所采取的措施有（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":26},"降低混凝土的入模温度",{"key":24,"text":588,"correct":22},"对混凝土尽快加热",{"key":28,"text":590,"correct":22},"配合比中水的含量减少1\u002F3",{"key":31,"text":592,"correct":26},"延长拆模时间",{"key":34,"text":594,"correct":26},"结构外保温",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":229,"analysis":37},1126844,"沥青混凝土面层检验项目中属于主控项目的有（ ）。",[599,601,603,605,607],{"key":20,"text":600,"correct":26},"压实度",{"key":24,"text":602,"correct":26},"弯沉值",{"key":28,"text":604,"correct":22},"宽度",{"key":31,"text":606,"correct":22},"平整度",{"key":34,"text":608,"correct":26},"厚度",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":52,"analysis":37},1126845,"关于二灰混合料拌合，运输和施工的说法，正确的有（ ）。",[613,615,617,619,621],{"key":20,"text":614,"correct":26},"宜采用强制式拌和机拌合",{"key":24,"text":616,"correct":26},"运输时，应采取遮盖封闭措施防止水分损失和遗撒",{"key":28,"text":618,"correct":26},"摊铺中发生粗、细集料离析时，应及时翻拌均匀",{"key":31,"text":620,"correct":22},"碾压应在自然含水量时进行",{"key":34,"text":622,"correct":26},"应在潮湿状态下养护，常温下不宜少于7d",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":171,"analysis":37},1126846,"道路无机结合料稳定基层质量检验的主控项目有（ ）。",[627,629,630,632,633],{"key":20,"text":628,"correct":26},"原材料质量",{"key":24,"text":606,"correct":22},{"key":28,"text":631,"correct":26},"7d无侧限抗压强度",{"key":31,"text":608,"correct":22},{"key":34,"text":600,"correct":26},{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":156,"analysis":37},1126847,"钻孔灌注桩施工时，造成钻孔垂直度不符合规范要求的主要原因有（）。",[638,640,642,644,646],{"key":20,"text":639,"correct":26},"钻机安装不平整或钻进过程中发生不均匀沉降",{"key":24,"text":641,"correct":22},"未在钻杆上加设扶正器",{"key":28,"text":643,"correct":26},"钻杆弯曲、钻杆接头间隙太大",{"key":31,"text":645,"correct":26},"钻头翼板磨损不一，钻头受力不均",{"key":34,"text":647,"correct":26},"钻进中遇软硬土层交界面或倾斜岩面时，钻压过高使钻头受力不均",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":112,"analysis":37},1126848,"明挖法施工质量控制与验收包括（）。",[652,654,656,658,660],{"key":20,"text":653,"correct":26},"基坑开挖施工",{"key":24,"text":655,"correct":26},"结构施工",{"key":28,"text":657,"correct":26},"基坑回填",{"key":31,"text":659,"correct":26},"主体结构防水施工",{"key":34,"text":661,"correct":22},"管线处理",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":52,"analysis":37},1126849,"进出工作井的安全质量控制主要措施有（）等。",[666,668,670,672,674],{"key":20,"text":667,"correct":26},"按照设计要求，采取超前小导管注浆加固措施",{"key":24,"text":669,"correct":26},"在进出位置安放钢拱架并及时喷射混凝土",{"key":28,"text":671,"correct":26},"根据设计给定的暗挖施工步骤，凿除进出位置的工作井支护结构",{"key":31,"text":673,"correct":22},"监测数据信息反馈，调整设计和施工参数",{"key":34,"text":675,"correct":26},"按照设计要求，采取大管棚注浆加固措施",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":690,"analysis":37},1126850,"关于初衬喷射混凝土施工的说法，正确的有（）。",[680,682,684,686,688],{"key":20,"text":681,"correct":26},"喷射作业分段、分层进行，喷射顺序由下而上",{"key":24,"text":683,"correct":22},"喷头应保持垂直工作面，喷头距工作面不宜大于2m",{"key":28,"text":685,"correct":26},"分层喷射时，应在前一层混凝土终凝后进行",{"key":31,"text":687,"correct":26},"喷射混凝土终凝2h后进行养护，时间不小于14d",{"key":34,"text":689,"correct":22},"喷射混凝土养护，冬期宜洒水养护","ACD",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":97,"analysis":37},1126851,"喷锚支护施工中关于二次衬砌泵送混凝土质量保证措施，说法正确的是（ ）。",[695,697,699,701,703],{"key":20,"text":696,"correct":26},"坍落度为150-180mm",{"key":24,"text":698,"correct":26},"碎石级配，骨料最大粒径≦25mm",{"key":28,"text":700,"correct":26},"严禁在浇筑过程中向混凝土中加水",{"key":31,"text":702,"correct":22},"坍落度为160-190mm",{"key":34,"text":704,"correct":22},"碎石级配，骨料最大粒径≦37.5mm",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":52,"analysis":37},1126852,"关于混凝土结构水处理构筑物质量验收主控项目的说法，正确的有（ ）。",[709,711,713,715,717],{"key":20,"text":710,"correct":26},"水处理构筑物结构类型、结构尺寸应符合设计要求",{"key":24,"text":712,"correct":26},"预埋件、预留孔洞、止水带等规格、尺寸应符合设计要求",{"key":28,"text":714,"correct":26},"混凝土强度、抗渗、抗冻性能符合设计要求",{"key":31,"text":716,"correct":22},"混凝土结构外观无一般质量缺陷",{"key":34,"text":718,"correct":26},"构筑物外壁不得渗水",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":690,"analysis":37},1126853,"以下需要有资质的检测部门进行强度和严密性试验的阀门有（ ）。",[723,725,727,729,731],{"key":20,"text":724,"correct":26},"一级管网主干线",{"key":24,"text":726,"correct":22},"二级管网主干线",{"key":28,"text":728,"correct":26},"支干线首端",{"key":31,"text":730,"correct":26},"供热站入口",{"key":34,"text":732,"correct":22},"与二级管网主干线直接连通",[734,738,741,744,747,750],{"id":735,"name":736,"category":7,"favorite":737},1,"领导干部任职前廉政法规知识测试题",92,{"id":739,"name":740,"category":7,"favorite":735},595,"建筑结构与设备",{"id":742,"name":743,"category":7,"favorite":735},715,"招标采购专业知识与法律法规",{"id":745,"name":746,"category":7,"favorite":735},848,"市政方向-通用基础",{"id":748,"name":749,"category":7,"favorite":8},534,"BIM工程师",{"id":751,"name":749,"category":7,"favorite":8},535]