[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-43":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,43,50,2846,[13,38,53,68,82,97,111,126,141,155,170,184,199,213,226,240,254,268,283,298,312,322,336,351,366,381,395,409,423,437,451,466,480,494,509,523,538,552,566,580,594,608,622,636,650,664,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126690,2,"多选题","排水管道全断面修复方法有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","焊接",false,{"key":24,"text":25,"correct":26},"B","喷涂法",true,{"key":28,"text":29,"correct":26},"C","内衬法",{"key":31,"text":32,"correct":26},"D","缠绕法",{"key":34,"text":35,"correct":22},"E","卡盘压紧固定","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126691,"下列沟槽开挖说法正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"机械开挖时槽底预留200～300mm土层，由人工开挖至设计高程",{"key":24,"text":45,"correct":26},"槽底局部扰动或受水浸泡时，宜采用天然级配砂砾石或石灰土回填",{"key":28,"text":47,"correct":22},"槽底扰动土层为湿陷性黄土时，宜采用石灰土回填",{"key":31,"text":49,"correct":22},"槽底土层为杂填土、腐蚀性土时，宜采用天然级配砂砾石回填",{"key":34,"text":51,"correct":26},"在沟槽边坡稳固后设置供施工人员上下沟槽的安全梯","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1126692,"关于给水排水工程中砌筑结构对材料的基本要求，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"机制烧结砖应边角整齐、表面平整、尺寸准确，强度不低于MU10",{"key":24,"text":60,"correct":26},"石料应质地坚实均匀，无风化剥落层和裂纹",{"key":28,"text":62,"correct":26},"混凝土砌块应符合设计要求和相关标准规定",{"key":31,"text":64,"correct":22},"砌筑砂浆应采用水泥砂浆，其强度等级应符合设计要求，且不应低于M15",{"key":34,"text":66,"correct":26},"水泥应符合《砌体结构工程施工质量验收规范》GB50203—2011的规定","ABCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1126693,"进行浅埋暗挖施工方案的选择应考虑的因素有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"可用的施工机械",{"key":24,"text":75,"correct":26},"隧道断面和结构形式.埋深.长度",{"key":28,"text":77,"correct":26},"工程水文地质条件",{"key":31,"text":79,"correct":26},"施工现场和周围环境安全",{"key":34,"text":81,"correct":22},"现有的施工队伍",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1126694,"关于给水排水工程砌筑结构中的砂浆抹面的基本要求，正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"墙壁表面粘结的杂物应清理干净，并洒水湿润",{"key":24,"text":89,"correct":26},"抹面宜分两道，第一道应抹平且表面粗糙，第二道抹平后，应分两次压实抹光",{"key":28,"text":91,"correct":26},"施工缝留成阶梯形，接槎时先均匀涂刷水泥浆一道，并依次抹压，使接槎严密",{"key":31,"text":93,"correct":26},"阴阳角应抹成圆角",{"key":34,"text":95,"correct":22},"抹面砂浆终凝后，湿润养护时间不宜少于7d","ABCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":96,"analysis":37},1126695,"（ ）必须经严密性试验合格后方可投入运行。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"污水管道",{"key":24,"text":104,"correct":26},"雨污水合流管道",{"key":28,"text":106,"correct":26},"流砂地区雨水管道",{"key":31,"text":108,"correct":26},"膨胀土地区雨水管道",{"key":34,"text":110,"correct":22},"黏土地区雨水管道",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1126696,"关于城市管道的维护，说法正确的有（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"钢管焊缝开裂，一般采用补麻.补灰后再用卡盘压紧固定",{"key":24,"text":118,"correct":22},"预应力钢筋混凝土管开裂，一般可采用补焊或盖压补焊的方法修复",{"key":28,"text":120,"correct":26},"养护人员必要时可戴上防毒面具，穿上系有绳子的防护腰带",{"key":31,"text":122,"correct":26},"养护人员必须接受安全技术培顺，考核合格后方可上岗",{"key":34,"text":124,"correct":26},"作业区和地面设专人值守，确保人身安全","CDE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1126697,"关于供热管道补偿器安装的说法，正确的有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"补偿器应与管道保持同轴",{"key":24,"text":133,"correct":22},"可以采用使补偿器变形的方法来调整管道的安装偏差",{"key":28,"text":135,"correct":26},"补偿器应进行防腐和保温处理",{"key":31,"text":137,"correct":22},"角向型波纹管补偿器的销轴轴线应平行于管道安装后形成的平面",{"key":34,"text":139,"correct":26},"轴向波纹管补偿器的流向标记应与管道介质流向一致","ACE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":67,"analysis":37},1126698,"关于供热管道用水清（冲）洗的表述正确的有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"冲洗应按主干线.支干线.支线分别进行",{"key":24,"text":148,"correct":26},"冲洗应连续进行并宜加大管道内的流量",{"key":28,"text":150,"correct":26},"水力清洗结束后应打开排水阀门排污",{"key":31,"text":152,"correct":22},"管内的平均流速不应低于2m\u002Fs",{"key":34,"text":154,"correct":26},"洗水量不能满足要求时，宜采用密闭循环水力冲洗方式",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1126699,"吊架可分为（ ）等形式。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"导向支架",{"key":24,"text":162,"correct":26},"刚性吊架",{"key":28,"text":164,"correct":26},"弹簧吊架",{"key":31,"text":166,"correct":22},"滚动支架",{"key":34,"text":168,"correct":22},"滑动支架","BC",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":36,"analysis":37},1126700,"敷设热力管网的方式一般可分为（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"供回水敷设",{"key":24,"text":177,"correct":26},"管沟敷设",{"key":28,"text":179,"correct":26},"架空敷设",{"key":31,"text":181,"correct":26},"直埋敷设",{"key":34,"text":183,"correct":22},"低支架敷设",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1126701,"关于供热管网清（吹）洗规定的说法，正确的有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"供热管网的清洗应在试运行前进行",{"key":24,"text":191,"correct":26},"清洗前，应编制清洗方案",{"key":28,"text":193,"correct":26},"供热管道清洗应按主干线、支干线、支线分别进行",{"key":31,"text":195,"correct":22},"供热管道二级管网可与一级管网一起清洗",{"key":34,"text":197,"correct":22},"冲洗水流方向按现场注水管布置情况确定","ABC",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":67,"analysis":37},1126702,"供热站试运行要求有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"供热站在试运行前，站内所有系统和设备须经有关各方预验收合格",{"key":24,"text":206,"correct":26},"供热站在试运行前，供热管网与热用户系统已具备试运行条件",{"key":28,"text":208,"correct":26},"试运行的时间应为连续运行72h",{"key":31,"text":210,"correct":22},"试运行的时间应为连续运行36h",{"key":34,"text":212,"correct":26},"试运行应在设计的参数下进行",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":225,"analysis":37},1126703,"常用的管道支架有（ ）。",[217,219,221,222,223],{"key":20,"text":218,"correct":26},"固定支架",{"key":24,"text":220,"correct":22},"刚性支架",{"key":28,"text":168,"correct":26},{"key":31,"text":160,"correct":26},{"key":34,"text":224,"correct":26},"弹簧支架","ACDE",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":96,"analysis":37},1126704,"阀门在供热管网中所起的重要作用有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"开启",{"key":24,"text":233,"correct":26},"关闭",{"key":28,"text":235,"correct":26},"调节",{"key":31,"text":237,"correct":26},"安全",{"key":34,"text":239,"correct":22},"排污",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":52,"analysis":37},1126705,"在0℃以下的环境中进行焊接，应符合下列规定（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":26},"现场应有防风、防雪措施",{"key":24,"text":247,"correct":26},"焊接前应清除管道上的冰、霜、雪",{"key":28,"text":249,"correct":22},"风速过大时应停止施工",{"key":31,"text":251,"correct":22},"应在焊口两侧100mm范围内对焊接进行预热，预热温度应根据焊接工艺确定",{"key":34,"text":253,"correct":26},"焊接时应使焊缝自由收缩，不得使焊口加速冷却",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":198,"analysis":37},1126706,"管道焊接在零度以下气温中应注意的事项有（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":26},"消除管道上的冰.霜.雪",{"key":24,"text":261,"correct":26},"现场应有防风.防雪措施",{"key":28,"text":263,"correct":26},"应在焊口两侧50mm范围内对焊件进行预热",{"key":31,"text":265,"correct":22},"安装直埋供热管道时，应排除地下水或积水",{"key":34,"text":267,"correct":22},"钢外护筒应采用对接焊",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1126707,"关于供热管道用蒸汽清（吹）洗表述正确的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"蒸汽管道必须用蒸汽吹洗",{"key":24,"text":275,"correct":26},"蒸汽吹洗的排汽管应引出室外，管口不得朝下",{"key":28,"text":277,"correct":22},"吹洗出口管在有条件情况下，以斜上方60°为宜",{"key":31,"text":279,"correct":26},"吹洗次数应为2～3次，每次的间隔时间宜为20～30min",{"key":34,"text":281,"correct":22},"蒸汽吹洗可以不暖管","BD",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":37},1126708,"供热管网补偿器中，热媒易泄露的是（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"自然补偿",{"key":24,"text":290,"correct":22},"波纹管补偿",{"key":28,"text":292,"correct":26},"球形补偿",{"key":31,"text":294,"correct":26},"套筒补偿",{"key":34,"text":296,"correct":22},"方形补偿","CD",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":198,"analysis":37},1126709,"利用补偿材料的变形来吸收热伸长的补偿器有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":26},"自然补偿器",{"key":24,"text":305,"correct":26},"方形补偿器",{"key":28,"text":307,"correct":26},"波纹管补偿器",{"key":31,"text":309,"correct":22},"套筒补偿器",{"key":34,"text":311,"correct":22},"球形补偿器",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":321,"analysis":37},1126710,"利用自身的可伸缩性吸收管道热伸长的补偿器有（ ）。",[316,317,318,319,320],{"key":20,"text":303,"correct":22},{"key":24,"text":305,"correct":22},{"key":28,"text":307,"correct":26},{"key":31,"text":311,"correct":22},{"key":34,"text":309,"correct":26},"CE",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":125,"analysis":37},1126712,"关于城镇供热管网试验说法正确的是（ ）。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"强度试验的试验压力为1.25倍设计压力，且不得低于0.6MPa",{"key":24,"text":329,"correct":22},"严密性试验的试验压力为1.15倍设计压力，且不得低于0.6MPa",{"key":28,"text":331,"correct":26},"强度试验其目的是试验管道本身与安装时焊口的强度",{"key":31,"text":333,"correct":26},"严密性试验是在各管段强度试验合格且应该是管道安装内容全部完成后进行",{"key":34,"text":335,"correct":26},"严密性试验是在零件、法兰等以及施焊工序全部完成后进行",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":350,"analysis":37},1126713,"地下燃气管道不得从（ ）穿越。",[340,342,344,346,348],{"key":20,"text":341,"correct":26},"大型构筑物",{"key":24,"text":343,"correct":22},"小型构筑物",{"key":28,"text":345,"correct":22},"河流",{"key":31,"text":347,"correct":26},"堆积易燃、易爆材料场地",{"key":34,"text":349,"correct":26},"具有腐蚀性液体的场地","ADE",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":365,"analysis":37},1126714,"要求介质单向流通的阀门有（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"蝶阀",{"key":24,"text":358,"correct":26},"安全阀",{"key":28,"text":360,"correct":26},"减压阀",{"key":31,"text":362,"correct":26},"止回阀",{"key":34,"text":364,"correct":26},"截止阀","BCDE",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":380,"analysis":37},1126715,"燃气管道的附属设备有（ ）。",[370,372,374,376,378],{"key":20,"text":371,"correct":26},"阀门",{"key":24,"text":373,"correct":22},"波形管",{"key":28,"text":375,"correct":26},"补偿器",{"key":31,"text":377,"correct":26},"排水器",{"key":34,"text":379,"correct":22},"排气管","ACD",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":52,"analysis":37},1126716,"燃气管道的阀门安装要注意的问题主要是（ ）。",[385,387,389,391,393],{"key":20,"text":386,"correct":26},"方向性",{"key":24,"text":388,"correct":26},"安装的位置要便于操作维修",{"key":28,"text":390,"correct":22},"阀门的手轮要向下",{"key":31,"text":392,"correct":22},"阀门手轮宜位于膝盖高",{"key":34,"text":394,"correct":26},"根据阀门的工作原理确定其安装位置",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":365,"analysis":37},1126717,"燃气钢质管道聚乙烯防腐涂层做法正确的有（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"钢管表面预处理等级不低于Sa1级",{"key":24,"text":402,"correct":26},"表面预处理过的钢管应在4h内进行涂覆，超过4h或钢管表面返锈时，应重新处理",{"key":28,"text":404,"correct":26},"聚乙烯层涂覆时，应确保焊缝两侧的聚乙烯完全辊压密实，焊缝两侧不应出现空洞",{"key":31,"text":406,"correct":26},"聚乙烯层涂覆后，应用水冷却至钢管温度不高于60℃",{"key":34,"text":408,"correct":26},"固定口可采用辐射交联聚乙烯热收缩套",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":125,"analysis":37},1126718,"下面关于燃气管道吹扫的表述中正确的有（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"管道及其附件组装完成并试压合格后，应按设计要求进行气体吹扫或清管球清扫",{"key":24,"text":416,"correct":22},"每次吹扫管道长度不宜超过1km，吹扫球应按介质流动方向进行，以避免补偿器内套管被破坏",{"key":28,"text":418,"correct":26},"吹扫结果可用贴有纸或白布的板置于吹扫口检查",{"key":31,"text":420,"correct":26},"5min内靶上无铁锈脏物则认为合格",{"key":34,"text":422,"correct":26},"吹扫后，将集存在阀室放散管内的脏物排出，清扫干净",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":67,"analysis":37},1126719,"燃气管道利用道路桥梁跨越河流时，其技术要求有（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":26},"燃气管道输送压力不应大于0.4MPa，必须采取安全防护措施",{"key":24,"text":430,"correct":26},"敷设于桥梁上的燃气管道应采用加厚的无缝钢管或焊接钢管",{"key":28,"text":432,"correct":26},"燃气管道在桥梁上的部分要提高防腐等级",{"key":31,"text":434,"correct":22},"燃气管道输送压力不应大于1MPa，可不做任何处理",{"key":34,"text":436,"correct":26},"燃气管道在桥梁上的部分应设置必要的补偿和减振措施",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":365,"analysis":37},1126720,"当管道内燃气输送压力不同时，对管道的（ ）也不同。（09考点）",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"试验方法",{"key":24,"text":444,"correct":26},"材质要求",{"key":28,"text":446,"correct":26},"安装质量要求",{"key":31,"text":448,"correct":26},"检验标准",{"key":34,"text":450,"correct":26},"运行管理要求",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":465,"analysis":37},1126721,"穿越铁路的燃气管道的套管应符合的要求，正确的有（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":26},"套管顶至铁路轨底不应小于1.2m，并应符合铁路管理部门的要求",{"key":24,"text":458,"correct":22},"套管宜采用铸铁管",{"key":28,"text":460,"correct":22},"套管内径应比燃气管道外径大50mm以上",{"key":31,"text":462,"correct":22},"套管两端与燃气管的间隙应采用刚性材料密封",{"key":34,"text":464,"correct":26},"套管端部距路堤坡脚外距离不应小于2.0m","AE",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":198,"analysis":37},1126722,"地下燃气管道不得在堆放（ ）的场地下面穿越，并不宜与其他管道或电缆同沟敷设。",[470,472,474,476,478],{"key":20,"text":471,"correct":26},"易燃材料",{"key":24,"text":473,"correct":26},"易爆材料",{"key":28,"text":475,"correct":26},"具有腐蚀性液体",{"key":31,"text":477,"correct":22},"建筑管材",{"key":34,"text":479,"correct":22},"建筑材料",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":140,"analysis":37},1126723,"燃气管道非开挖修复技术主要有（ ）。",[484,486,488,490,492],{"key":20,"text":485,"correct":26},"胀管法",{"key":24,"text":487,"correct":22},"刷涂法",{"key":28,"text":489,"correct":26},"管道穿插技术",{"key":31,"text":491,"correct":22},"补丁法",{"key":34,"text":493,"correct":26},"翻转内衬法",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},1126724,"燃气管道穿过（ ）时，应将燃气管道敷于套管内。",[498,500,502,504,506],{"key":20,"text":499,"correct":26},"排水管",{"key":24,"text":501,"correct":26},"高速公路",{"key":28,"text":503,"correct":22},"河底",{"key":31,"text":505,"correct":26},"联合地沟",{"key":34,"text":507,"correct":26},"隧道","ABDE",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":198,"analysis":37},1126725,"聚乙烯燃气管材贮存的做法中正确的有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":26},"严禁与油类或化学品混合存放",{"key":24,"text":516,"correct":26},"管材应水平堆放在平整的支撑物或地面上",{"key":28,"text":518,"correct":26},"当直管采用三角形式堆放或两侧加支撑保护的矩形堆放时，堆放高度不宜超过1.5m",{"key":31,"text":520,"correct":22},"应按不同规格尺寸和不同类别分别存放，并应遵守“后进先出”原则",{"key":34,"text":522,"correct":22},"从生产到使用期间，存放时间不宜超过2 年",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":537,"analysis":37},1126726,"HDPE膜材料质量应由（ ）在现场抽样检查。",[527,529,531,533,535],{"key":20,"text":528,"correct":26},"供货单位",{"key":24,"text":530,"correct":22},"施工单位",{"key":28,"text":532,"correct":22},"设计单位",{"key":31,"text":534,"correct":26},"建设单位",{"key":34,"text":536,"correct":22},"监理单位","AD",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":282,"analysis":37},1126727,"土工合成材料膨润土垫（GCL）铺设做法错误的是（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"进行GCL铺设作业，每一工作面施工前均要对基底进行修整和检验",{"key":24,"text":545,"correct":26},"对铺开的GCL进行调整，调整搭接宽度，控制在150±50mm范围内",{"key":28,"text":547,"correct":22},"拉平GCL，确保无褶皱、无悬空现象，与基础层贴实",{"key":31,"text":549,"correct":26},"GCL的搭接应采用下压上的搭接方式",{"key":34,"text":551,"correct":22},"注意避免出现十字搭接，应尽量采用品形分布",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":225,"analysis":37},1126728,"生活垃圾填埋场不得建在下列地区（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":26},"居民密集居住区",{"key":24,"text":559,"correct":22},"荒漠地区",{"key":28,"text":561,"correct":26},"自然保护区",{"key":31,"text":563,"correct":26},"地下水补给区",{"key":34,"text":565,"correct":26},"尚未开采的地下蕴矿区",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":67,"analysis":37},1126729,"生活垃圾填埋场泥质防水层的施工控制要点有（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"控制膨润土进货质量",{"key":24,"text":573,"correct":26},"确定膨润土的最佳掺量",{"key":28,"text":575,"correct":26},"控制拌合均匀度.含水量及泥质防水层的碾压压实度",{"key":31,"text":577,"correct":22},"控制膨润土垫的铺设质量",{"key":34,"text":579,"correct":26},"保证质量检验",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":96,"analysis":37},1126730,"HDPE膜铺设质量抽样检验时，要求（ ）项目合格率为100％。 A",[584,586,588,590,592],{"key":20,"text":585,"correct":26},"锚固沟回填土密实度",{"key":24,"text":587,"correct":26},"气压检测",{"key":28,"text":589,"correct":26},"真空检测",{"key":31,"text":591,"correct":26},"强度测试",{"key":34,"text":593,"correct":22},"拉力测试",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":96,"analysis":37},1126731,"关于生活垃圾卫生填埋场HDPE膜的施工要求，正确的有（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":26},"铺设应一次展开到位",{"key":24,"text":601,"correct":26},"应为膜尺寸变化留出伸缩量",{"key":28,"text":603,"correct":26},"应对膜下保护层采取防、排水措施",{"key":31,"text":605,"correct":26},"应防止膜受风力影响破坏",{"key":34,"text":607,"correct":22},"膜应全部展开后统一焊接",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":380,"analysis":37},1126732,"在保证膨润土拌合土层满足抗渗设计要求的前提下，节约成本的最佳做法有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"选好土源及拌合场地",{"key":24,"text":615,"correct":22},"确定拌合土层的厚度",{"key":28,"text":617,"correct":26},"优选最佳配比",{"key":31,"text":619,"correct":26},"严格控制含水率，保证压实度",{"key":34,"text":621,"correct":22},"根据土源土壤的细度减少膨润土的掺加量",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":537,"analysis":37},1126733,"泥质防水层施工质量检验项目包括（ ）试验。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"压实度",{"key":24,"text":629,"correct":22},"密封",{"key":28,"text":631,"correct":22},"化学稳定性",{"key":31,"text":633,"correct":26},"渗水试验",{"key":34,"text":635,"correct":22},"厚度",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":96,"analysis":37},1126734,"垃圾填埋场选址时应该慎重，注意对环境的影响，必须（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":26},"远离饮用水源",{"key":24,"text":643,"correct":26},"尽量少占良田",{"key":28,"text":645,"correct":26},"利用当地地形",{"key":31,"text":647,"correct":26},"利用荒地",{"key":34,"text":649,"correct":22},"把减少投资放在重要考虑因素之首",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":169,"analysis":37},1126735,"在路基压实施工中，路基压实的方式有（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":22},"超重力压实",{"key":24,"text":657,"correct":26},"重力压实",{"key":28,"text":659,"correct":26},"振动压实",{"key":31,"text":661,"correct":22},"人工夯实",{"key":34,"text":663,"correct":22},"机械夯实",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":678,"analysis":37},1126736,"填方路基施工时，应做到（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"当地面坡度陡于1：5时，需修成台阶形式，每级台阶宽度不得小于1.0m，台阶顶面应向外倾斜",{"key":24,"text":671,"correct":26},"填方高度内的管涵顶面应在还土500mm以上才能用压路机碾压",{"key":28,"text":673,"correct":22},"碾压时先轻后重，最后碾压不应小于8t压路机",{"key":31,"text":675,"correct":26},"填土不得使用腐殖土、生活垃圾、淤泥等",{"key":34,"text":677,"correct":26},"根据测量中心线桩和下坡脚桩，分层填土、分层压实","BDE",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":678,"analysis":37},1126737,"下列关于路基边缘压实度不足的防治措施，说法正确的有（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"亏坡补宽时要贴坡填筑",{"key":24,"text":686,"correct":26},"提高路基边缘带压实遍数",{"key":28,"text":688,"correct":22},"严格按照设计宽度施工，不得超宽填筑",{"key":31,"text":690,"correct":26},"控制碾压顺序",{"key":34,"text":692,"correct":26},"校正坡脚线位置",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":508,"analysis":37},1126738,"有条件时，土基压实应做试验段，以取得（ ）等施工参数。",[697,699,701,703,705],{"key":20,"text":698,"correct":26},"碾压遍数",{"key":24,"text":700,"correct":26},"碾压机具组合",{"key":28,"text":702,"correct":22},"摊铺长度",{"key":31,"text":704,"correct":26},"路基预沉量值",{"key":34,"text":706,"correct":26},"每层虚铺厚度",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":96,"analysis":37},1126739,"石方路基施工中，先修筑试验段的目的有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":26},"确定松铺厚度",{"key":24,"text":714,"correct":26},"确定压实机具组合",{"key":28,"text":716,"correct":26},"确定压实遍数",{"key":31,"text":718,"correct":26},"沉降差",{"key":34,"text":720,"correct":22},"确定温度变化差",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":96,"analysis":37},1126740,"属于排水固结类处理地基的方法有（ ）等。",[725,727,729,731,733],{"key":20,"text":726,"correct":26},"砂井预压",{"key":24,"text":728,"correct":26},"塑料排水板预压",{"key":28,"text":730,"correct":26},"真空预压",{"key":31,"text":732,"correct":26},"降水预压",{"key":34,"text":734,"correct":22},"砂桩预压",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]