[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,42,50,2846,[13,38,53,67,80,94,109,124,139,154,166,181,196,211,225,236,250,263,277,291,305,320,334,348,362,376,390,404,418,431,443,457,472,487,501,515,529,542,556,570,584,598,613,627,641,655,670,684,694,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1126640,2,"多选题","地表锚杆应根据（ ）进行选择。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","长度",false,{"key":24,"text":25,"correct":26},"B","地质条件",true,{"key":28,"text":29,"correct":26},"C","使用要求",{"key":31,"text":32,"correct":22},"D","刚度",{"key":34,"text":35,"correct":26},"E","锚固特性","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1126641,"下列关于暗挖隧道内常用的技术措施有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"超前锚杆",{"key":24,"text":45,"correct":26},"围岩深孔注浆",{"key":28,"text":47,"correct":26},"设置临时仰拱",{"key":31,"text":49,"correct":26},"管棚超前支护",{"key":34,"text":51,"correct":22},"冻结法","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1126642,"根据国内外经验，在下列场合中采用管棚超前支护的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"穿越地下和地面结构物修建地下工程",{"key":24,"text":60,"correct":26},"修建大断面地下工程",{"key":28,"text":62,"correct":26},"通过断层破碎带等特殊地层",{"key":31,"text":64,"correct":26},"特殊地段，如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工",{"key":34,"text":66,"correct":22},"通过硬岩区段",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":79,"analysis":37},1126643,"暗挖隧道外常用的辅助技术措施有（ ）。",[71,73,75,77,78],{"key":20,"text":72,"correct":26},"地表注浆加固",{"key":24,"text":74,"correct":22},"超前小导管注浆",{"key":28,"text":76,"correct":26},"冻结法固结地层",{"key":31,"text":45,"correct":22},{"key":34,"text":47,"correct":22},"AC",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":52,"analysis":37},1126644,"下列说法中，关于全断面开挖法的优点有（ ）。",[84,86,88,90,92],{"key":20,"text":85,"correct":26},"开挖对围岩的扰动次数少",{"key":24,"text":87,"correct":26},"工序简单",{"key":28,"text":89,"correct":26},"所有喷锚暗挖法开挖方式中工期最短",{"key":31,"text":91,"correct":26},"初期支护拆除量无",{"key":34,"text":93,"correct":22},"能充分利用围岩的自稳能力",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1126645,"下列属于台阶法开挖的优点的是（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":26},"灵活多变，适用性强",{"key":24,"text":101,"correct":26},"具有足够的作业空间",{"key":28,"text":103,"correct":26},"具有较快的施工速度",{"key":31,"text":105,"correct":22},"可以减少开挖对围岩的扰动次数",{"key":34,"text":107,"correct":22},"防水处理简单","ABC",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1126646,"在软土地基中，基坑内被动区的加固形式主要有（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"锚式加固",{"key":24,"text":116,"correct":26},"裙边加固",{"key":28,"text":118,"correct":26},"抽条加固",{"key":31,"text":120,"correct":26},"格栅加固",{"key":34,"text":122,"correct":26},"满堂加固","BCDE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},1126647,"关于小导管注浆加固技术，注浆材料可以选用（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"磨细水泥",{"key":24,"text":131,"correct":26},"改性水玻璃浆",{"key":28,"text":133,"correct":26},"普通水泥单液浆",{"key":31,"text":135,"correct":26},"水泥-水玻璃双液浆",{"key":34,"text":137,"correct":22},"水玻璃浆","BCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},1126648,"浅埋暗挖法施工地下结构需采用喷锚初期支护时，支护结构形式主要有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"喷射混凝土",{"key":24,"text":146,"correct":22},"钢筋喷射混凝土",{"key":28,"text":148,"correct":26},"钢筋网喷射混凝土",{"key":31,"text":150,"correct":26},"锚杆一钢筋网喷射混凝土",{"key":34,"text":152,"correct":26},"钢拱架一钢筋网喷射混凝土","CDE",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":165,"analysis":37},1126649,"一般采用管棚超前支护的场合有（ ）。",[158,160,161,163,164],{"key":20,"text":159,"correct":26},"隧道洞口段施工",{"key":24,"text":62,"correct":26},{"key":28,"text":162,"correct":22},"岩层较为坚硬的地段",{"key":31,"text":60,"correct":26},{"key":34,"text":58,"correct":26},"ABDE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":37},1126650,"在明挖基坑地基加固处理中，基坑内加固的目的主要有（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":26},"提高土体的强度和土体侧向抗力",{"key":24,"text":173,"correct":22},"减少坑底位移",{"key":28,"text":175,"correct":26},"保护基坑周边建筑物及地下管线",{"key":31,"text":177,"correct":26},"防止坑底土体隆起破坏",{"key":34,"text":179,"correct":26},"弥补围护墙插入深度不足","ACDE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":195,"analysis":37},1126651,"常规冻结法适用的边界条件（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"土体含水量大于10％",{"key":24,"text":188,"correct":26},"土体含水量大于2.5%",{"key":28,"text":190,"correct":22},"地下水流速为7～9m\u002Fd",{"key":31,"text":192,"correct":26},"地下水含盐量不大于3%",{"key":34,"text":194,"correct":26},"地下水流速不大于40m\u002Fd","BDE",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1126652,"下列小导管布设做法中错误的有（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"小导管采用焊接钢管或无缝钢管",{"key":24,"text":203,"correct":26},"钢管直径70～80mm，钢管长3～5m",{"key":28,"text":205,"correct":22},"钢管环向布设范围及环向间距由设计单位根据地层特性确定",{"key":31,"text":207,"correct":22},"超前小导管应从钢格栅的腹部穿过",{"key":34,"text":209,"correct":26},"前后两排小导管的水平支撑搭接长度不应小于3m","BE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":123,"analysis":37},1126653,"浅埋暗挖法中，（ ）防水效果差。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"正台阶法",{"key":24,"text":218,"correct":26},"双侧壁导坑法",{"key":28,"text":220,"correct":26},"中洞法",{"key":31,"text":222,"correct":26},"侧洞法",{"key":34,"text":224,"correct":26},"柱洞法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":79,"analysis":37},1126654,"下列浅埋暗挖的开挖方式中，（ ）造价低。",[229,230,232,234,235],{"key":20,"text":216,"correct":26},{"key":24,"text":231,"correct":22},"双侧壁法",{"key":28,"text":233,"correct":26},"全断面法",{"key":31,"text":222,"correct":22},{"key":34,"text":224,"correct":22},{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":165,"analysis":37},1126655,"下述关于管棚施工工艺要求中正确的有（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":26},"钻孔开始前，把钢管放在标准拱架上，测定钻孔孔位和钻机的中心，使两点一致",{"key":24,"text":243,"correct":26},"钢管应用U形螺栓与拱架稍加固定，以防止弯曲",{"key":28,"text":245,"correct":22},"应每隔1.5m对正在钻进的钻孔进行孔弯曲测定检查",{"key":31,"text":247,"correct":26},"钢管打入随钻孔同步进行，接头应采用厚壁管箍，上满丝扣，确保连接可靠",{"key":34,"text":249,"correct":26},"钢管打入后，应及时隔孔向钢管内及周围压注水泥浆或水泥砂浆",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":138,"analysis":37},1126656,"暗挖隧道外常用的技术措施有（ ）。",[254,255,257,259,261],{"key":20,"text":49,"correct":22},{"key":24,"text":256,"correct":26},"地表锚杆或地表注浆加固",{"key":28,"text":258,"correct":26},"冻结法固定地层",{"key":31,"text":260,"correct":26},"降低地下水位法",{"key":34,"text":262,"correct":22},"小导管周边注浆",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":52,"analysis":37},1126657,"污水中有机物浓度一般用（ ）来表示。",[267,269,271,273,275],{"key":20,"text":268,"correct":26},"BOD5",{"key":24,"text":270,"correct":26},"COD",{"key":28,"text":272,"correct":26},"TOD",{"key":31,"text":274,"correct":26},"TOC",{"key":34,"text":276,"correct":22},"BOT",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":138,"analysis":37},1126658,"关于预制拼装给排水构筑物现浇板缝施工说法，正确的有（ ）。",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"板缝部位混凝土表面不用凿毛",{"key":24,"text":284,"correct":26},"外模应分段随浇随支",{"key":28,"text":286,"correct":26},"内模一次安装到位",{"key":31,"text":288,"correct":26},"宜采用微膨胀水泥",{"key":34,"text":290,"correct":22},"板缝混凝土应与壁板混凝土强度相同",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":123,"analysis":37},1126659,"水池满水试验中，水位观测的要求有（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"测读水位的初读数与末读数之间的间隔时间应少于12h",{"key":24,"text":298,"correct":26},"水位测针的读数精确度应达1\u002F10mm",{"key":28,"text":300,"correct":26},"注水至设计水深24h后，开始测读水位测针的初读数",{"key":31,"text":302,"correct":26},"利用水位标尺测针观测.记录注水时的水位值",{"key":34,"text":304,"correct":26},"测定时间必须连续",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},1126660,"构筑物满水试验前必须具备的条件有（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"池内清理洁净",{"key":24,"text":312,"correct":22},"防水层施工完成",{"key":28,"text":314,"correct":26},"预留洞口已临时封堵",{"key":31,"text":316,"correct":22},"防腐层施工完成",{"key":34,"text":318,"correct":26},"构筑物强度满足设计要求","ACE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":123,"analysis":37},1126661,"以地表水作为水源的给水处理厂常规处理的工艺流程包括（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"初沉",{"key":24,"text":327,"correct":26},"混凝",{"key":28,"text":329,"correct":26},"过滤",{"key":31,"text":331,"correct":26},"沉淀",{"key":34,"text":333,"correct":26},"消毒",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":165,"analysis":37},1126662,"关于分节制作沉井的要求，正确的有（ ）。",[338,340,342,344,346],{"key":20,"text":339,"correct":26},"第一节制作高度必须高于刃脚部分",{"key":24,"text":341,"correct":26},"设计无要求时，前节混凝土强度应达到设计强度75%，方可浇筑后节混凝土",{"key":28,"text":343,"correct":22},"沉井每次接高时各部位的轴线位置应基本重合",{"key":31,"text":345,"correct":26},"混凝土施工缝处理应采用凹凸缝或设置钢板止水带，施工缝应凿毛并清理干净",{"key":34,"text":347,"correct":26},"分节制作.分次下沉的沉井严禁在接高施工过程中发生倾斜和突然下沉",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":165,"analysis":37},1126663,"城市污水处理厂的一级处理工艺单元有（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":26},"格栅",{"key":24,"text":355,"correct":26},"沉砂池",{"key":28,"text":357,"correct":22},"澄清池",{"key":31,"text":359,"correct":26},"沉淀池",{"key":34,"text":361,"correct":26},"接触池",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":195,"analysis":37},1126664,"再生水回用可用于（ ）。",[366,368,370,372,374],{"key":20,"text":367,"correct":22},"含城市绿化、洗澡用水",{"key":24,"text":369,"correct":26},"道路清扫",{"key":28,"text":371,"correct":22},"饮用水",{"key":31,"text":373,"correct":26},"建筑施工用水",{"key":34,"text":375,"correct":26},"消防用水",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":389,"analysis":37},1126665,"污水二级处理的方法有（ ）。",[380,382,384,386,387],{"key":20,"text":381,"correct":26},"活性污泥",{"key":24,"text":383,"correct":26},"生物膜",{"key":28,"text":385,"correct":26},"氧化塘",{"key":31,"text":329,"correct":22},{"key":34,"text":388,"correct":26},"土地处理","ABCE",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":319,"analysis":37},1126666,"钢筋混凝土水池设计上有（ ）要求。",[394,396,398,400,402],{"key":20,"text":395,"correct":26},"抗冻",{"key":24,"text":397,"correct":22},"抗氧化",{"key":28,"text":399,"correct":26},"抗渗",{"key":31,"text":401,"correct":22},"抗碳化",{"key":34,"text":403,"correct":26},"抗裂",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":52,"analysis":37},1126667,"给水预处理方法中化学氧化法预处理技术主要有（ ）。",[408,410,412,414,416],{"key":20,"text":409,"correct":26},"氯气预氧化",{"key":24,"text":411,"correct":26},"高锰酸钾",{"key":28,"text":413,"correct":26},"紫外光",{"key":31,"text":415,"correct":26},"臭氧",{"key":34,"text":417,"correct":22},"生物膜法",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":52,"analysis":37},1126668,"污水三级处理方法有（ ）。",[422,424,426,427,429],{"key":20,"text":423,"correct":26},"生物脱氮除磷",{"key":24,"text":425,"correct":26},"混凝沉淀",{"key":28,"text":329,"correct":26},{"key":31,"text":428,"correct":26},"活性炭吸附",{"key":34,"text":430,"correct":22},"土地处理法",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":442,"analysis":37},1126669,"城市污水二级处理通常采用的方法是微生物处理法，具体方式又主要分为（ ）。",[435,436,438,440,441],{"key":20,"text":423,"correct":22},{"key":24,"text":437,"correct":26},"活性污泥法",{"key":28,"text":439,"correct":22},"氧化还原",{"key":31,"text":417,"correct":26},{"key":34,"text":425,"correct":22},"BD",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":180,"analysis":37},1126670,"沉井施工中下沉施工控制要点有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":26},"下沉应平稳.均衡.缓慢，发生偏斜应 “随挖随纠.动中纠偏”",{"key":24,"text":450,"correct":22},"开挖顺序和方式没有严格要求",{"key":28,"text":452,"correct":26},"应按施工方案规定的顺序和方式开挖",{"key":31,"text":454,"correct":26},"做好沉井下沉监控测量",{"key":34,"text":456,"correct":26},"沉井下沉影响范围内的地面四周不得堆放任何东西，车辆来往要减少震动",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":471,"analysis":37},1126671,"地表水中杂质按颗粒大小以及存在形态分为（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"悬浮物质",{"key":24,"text":464,"correct":22},"微生物",{"key":28,"text":466,"correct":22},"颗粒态物质",{"key":31,"text":468,"correct":26},"胶体",{"key":34,"text":470,"correct":26},"溶解物质","ADE",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":486,"analysis":37},1126672,"污水处理工艺中，关于一级、二级处理正确的说法有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":26},"一级处理主要采用物理处理法",{"key":24,"text":479,"correct":22},"一级处理后的污水BOD5一般可去除40%左右",{"key":28,"text":481,"correct":26},"二级处理主要去除污水中呈胶体和溶解性状态的有机污染物质",{"key":31,"text":483,"correct":26},"二级处理通常采用微生物处理法",{"key":34,"text":485,"correct":22},"二次沉淀池是一级处理的主要构筑物之一","ACD",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":36,"analysis":37},1126673,"装配式预应力水池吊装的质量要点包括（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"有轻微裂缝的构件，可不进行鉴定",{"key":24,"text":494,"correct":26},"预制柱.梁及壁板等构件应标注中心线，并在杯槽.杯口上标出中心线",{"key":28,"text":496,"correct":26},"预制构件应按设计位置起吊，曲梁宜采用三点吊装。",{"key":31,"text":498,"correct":22},"曲梁应在梁的跨中临时支撑，待上部二期混凝土达到设计强度的50%及以上时，方可拆除支撑",{"key":34,"text":500,"correct":26},"吊绳与预制构件平面的交角不应小于45°；当小于45°时，应进行强度验算",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":442,"analysis":37},1126674,"根据场站工艺管线的要求，给排水管道宜采用的管材类型有（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"钢筋混凝土平口管",{"key":24,"text":508,"correct":26},"PE管",{"key":28,"text":510,"correct":22},"石棉管",{"key":31,"text":512,"correct":26},"球墨铸铁管",{"key":34,"text":514,"correct":22},"钢管",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":52,"analysis":37},1126675,"下列关于预制安装水池壁板缝混凝土施工的说法正确的是（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":26},"壁板接缝的内模宜一次安装到顶",{"key":24,"text":522,"correct":26},"浇筑前，接缝的壁板表面应洒水保持湿润",{"key":28,"text":524,"correct":26},"分段支模高度不宜超过1.5m",{"key":31,"text":526,"correct":26},"用于接头或拼缝的混凝土或砂浆，宜采用微膨胀和快速水泥",{"key":34,"text":528,"correct":22},"混凝土分层浇筑厚度不宜超过300mm",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":471,"analysis":37},1126676,"关于构筑物满水试验中水位观测的要求，下列叙述正确的有（ ）。",[533,535,537,539,540],{"key":20,"text":534,"correct":26},"采用水位测针测定水位",{"key":24,"text":536,"correct":22},"注水至设计水深后立即开始测读",{"key":28,"text":538,"correct":22},"水位测针的读数精确度应达1mm",{"key":31,"text":304,"correct":26},{"key":34,"text":541,"correct":26},"初读数与末读数间隔时间不少于24h",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":180,"analysis":37},1126677,"现浇混凝土水池池壁与顶板连续施工时做法正确的为（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":26},"池壁内模立柱不得同时作为顶板模板立柱",{"key":24,"text":549,"correct":22},"顶板支架的斜杆可与池壁模板的杆件相连接",{"key":28,"text":551,"correct":26},"顶板支架的横向连杆不得与池壁模板的杆件相连接",{"key":31,"text":553,"correct":26},"池壁模板可先安装一侧，绑完钢筋后，分层安装另一侧模板",{"key":34,"text":555,"correct":26},"池壁模板可采用一次安装到顶而分层预留操作窗口的施工方法",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":442,"analysis":37},1126678,"水池满水试验水池渗水量计算时浸湿面积包括（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"池盖",{"key":24,"text":563,"correct":26},"池壁",{"key":28,"text":565,"correct":22},"内隔墙",{"key":31,"text":567,"correct":26},"池底",{"key":34,"text":569,"correct":22},"水箱",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":389,"analysis":37},1126679,"设计蓄水深6m的圆形现浇预应力混凝土无盖水池进行满水试验，正确的做法有（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":26},"分3次向水池中注水，每次水位上升2m\u002Fd",{"key":24,"text":577,"correct":26},"每次注水间隔时间应不少于24h",{"key":28,"text":579,"correct":26},"水池渗水量过大时应停止注水，进行处理",{"key":31,"text":581,"correct":22},"本水池可不测定蒸发量",{"key":34,"text":583,"correct":26},"满水试验应在池体的防水层、防腐层施工之前进行",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":389,"analysis":37},1126680,"当构筑物无抗浮设计时，雨汛期水池施工中的抗浮措施有（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":26},"构筑物下及基坑内四周埋设排水盲管（盲沟）和抽水设备",{"key":24,"text":591,"correct":26},"基坑四周设防汛墙，防止外来水进入基坑",{"key":28,"text":593,"correct":26},"必要时放水进入构筑物，使构筑物内外无水位差",{"key":31,"text":595,"correct":22},"增加池体钢筋所占比例",{"key":34,"text":597,"correct":26},"备有应急供电和排水设施并保证其可靠性",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":612,"analysis":37},1126681,"关于现浇预应力钢筋混凝土水池的无粘结预应力筋布置安装要求，正确的有（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":26},"锚固肋数量和布置，应符合设计要求",{"key":24,"text":605,"correct":22},"设计无要求时，锚固肋数量宜为单数",{"key":28,"text":607,"correct":22},"设计无要求时，应保证张拉段无粘结预应力筋长不超过60m",{"key":31,"text":609,"correct":22},"无粘结预应力筋中不宜有接头",{"key":34,"text":611,"correct":26},"无粘结预应力筋不应有死弯，有死弯时必须切断","AE",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":180,"analysis":37},1126682,"关于现浇预应力钢筋混凝土水池的模板及支架拆除，下列说法中正确的有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":26},"应按模板支架设计方案、程序进行拆除",{"key":24,"text":620,"correct":22},"板、梁、拱、壳跨度≤8m，底模板应在结构强度≥75% 设计强度后拆除",{"key":28,"text":622,"correct":26},"板、梁、拱、壳跨度>8m，底模板应在结构强度≥100%设计强度后拆除",{"key":31,"text":624,"correct":26},"应在混凝土强度能保证其表面及棱角不因拆除模板而损坏时，拆除侧模板",{"key":34,"text":626,"correct":26},"模板及支架拆除时，应划定安全范围，设专人指挥和值守",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":52,"analysis":37},1126683,"沉井干封底做法正确的为（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":26},"在井点降水条件下施工应继续降水，并稳定保持地下水位距坑底不小于0.5m",{"key":24,"text":634,"correct":26},"封底前应整理好坑底和清除浮泥，对超挖部分应回填砂石至规定高程",{"key":28,"text":636,"correct":26},"采用全断面封底时，混凝土垫层应一次性连续浇筑",{"key":31,"text":638,"correct":26},"因有底梁或支撑梁而分格封底时，应对称逐格浇筑混凝土",{"key":34,"text":640,"correct":22},"底板混凝土强度达到设计强度的75%时，方可封填泄水井、停止降水",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":123,"analysis":37},1126684,"下列管道开槽的施工要求正确的有（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"槽底局部扰动或受水浸泡时，宜用混凝土回填",{"key":24,"text":648,"correct":26},"在沟槽边坡稳固后设置供施工人员上下沟槽的安全梯",{"key":28,"text":650,"correct":26},"槽底原状地基土不得扰动，机械开挖时槽底预留200～300mm土层由人工开挖.整平",{"key":31,"text":652,"correct":26},"人工开挖沟槽的槽深超过3m时应分层开挖，每层的深度不超过2m",{"key":34,"text":654,"correct":26},"采用机械挖槽时，沟槽分层的深度应按机械性能确定",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":669,"analysis":37},1126685,"不适用于砂卵石及含水地层的不开槽施工方法有（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"顶管",{"key":24,"text":662,"correct":22},"盾构",{"key":28,"text":664,"correct":22},"浅埋暗挖",{"key":31,"text":666,"correct":26},"定向钻",{"key":34,"text":668,"correct":26},"夯管","DE",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":138,"analysis":37},1126686,"适用管径800mm的不开槽施工方法有（ ）。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"盾构法",{"key":24,"text":677,"correct":26},"定向钻法",{"key":28,"text":679,"correct":26},"密闭式顶管法",{"key":31,"text":681,"correct":26},"夯管法",{"key":34,"text":683,"correct":22},"浅埋暗挖法",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":319,"analysis":37},1126687,"不开槽管道施工方法中，适用于给水排水管道及综合管道的方法包括（ ）。",[688,689,690,691,693],{"key":20,"text":675,"correct":26},{"key":24,"text":681,"correct":22},{"key":28,"text":683,"correct":26},{"key":31,"text":692,"correct":22},"水平定向钻法",{"key":34,"text":679,"correct":26},{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":52,"analysis":37},1126688,"沟槽开挖前编制的沟槽开挖方案应包含的主要内容有（ ）。",[698,700,702,704,706],{"key":20,"text":699,"correct":26},"沟槽施工平面布置图及开挖断面图",{"key":24,"text":701,"correct":26},"沟槽形式.开挖方法及堆土要求",{"key":28,"text":703,"correct":26},"施工设备机具的型号.数量及作业要求",{"key":31,"text":705,"correct":26},"施工安全.文明施工.沿线管线及构（建）筑物保护要求",{"key":34,"text":707,"correct":22},"安管方案",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":123,"analysis":37},1126689,"关于给水排水压力管道水压试验的准备工作，正确的有（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"管道未回填土且沟槽内无积水",{"key":24,"text":715,"correct":26},"应做好水源引接、排水等疏导方案",{"key":28,"text":717,"correct":26},"试验前应清除管道内的杂物",{"key":31,"text":719,"correct":26},"试验管段所有敞口应封闭，不得有渗漏水现象",{"key":34,"text":721,"correct":26},"试验管段不得用闸阀做堵板，不得含有消火栓、水锤消除器、安全阀等附件",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]