[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":693},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,40,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,165,177,189,201,213,225,237,249,261,273,285,303,317,332,347,362,376,390,405,420,434,448,462,476,489,504,519,534,548,563,578,593,608,622,636,650,664,679],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1126538,1,"单选题","各类土经水泥稳定后，强度由高到低依次是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","（砾）石和砂砾―砂性土―粉性土和黏性土",true,{"key":24,"text":25,"correct":26},"B","（砾）石和砂砾―粉性土和黏性土―砂性土",false,{"key":28,"text":29,"correct":26},"C","粉性土和黏性土―砂性土―（砾）石和砂砾",{"key":31,"text":32,"correct":26},"D","砂性土―（砾）石和砂砾―粉性土和黏性土","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1126539,"设置现浇预应力混凝土连续梁支架预拱度时，不考虑的变形是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"卸架后上部构造本身及活载一半所产生的竖向挠度",{"key":24,"text":41,"correct":26},"支架在荷载作用下的弹性压缩和非弹性压缩",{"key":28,"text":43,"correct":22},"支架基底在荷载作用下的弹性沉陷",{"key":31,"text":45,"correct":26},"由混凝土收缩及温度变化而引起的挠度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1126540,"钢桁梁安装时，大面积节点板高强螺栓施拧应采用的顺序为()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"由中央向外",{"key":24,"text":53,"correct":26},"由外向中央",{"key":28,"text":55,"correct":26},"由上向下",{"key":31,"text":57,"correct":26},"由下向上",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1126541,"地铁区间隧道的建筑限界应考虑()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"设备和管线安装尺寸、厚度",{"key":24,"text":65,"correct":26},"施工误差",{"key":28,"text":67,"correct":26},"测量误差",{"key":31,"text":69,"correct":26},"结构沉降",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1126542,"沉井井壁最下端做成刀刃状，其主要功用是()。",[74,76,78,80],{"key":20,"text":75,"correct":26},"便于挖土",{"key":24,"text":77,"correct":26},"节约建筑材料",{"key":28,"text":79,"correct":26},"减轻自重",{"key":31,"text":81,"correct":22},"减少下沉阻力",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1126543,"城市排水泵站中溢流井的功能是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"调节水量",{"key":24,"text":89,"correct":22},"紧急排放",{"key":28,"text":91,"correct":26},"作为水泵出水口",{"key":31,"text":93,"correct":26},"稳定出水井水位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1126544,"关于承插式混凝土管道接口安装质量的说法，错误的是()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"接口应平直",{"key":24,"text":101,"correct":26},"环向间隙应均匀",{"key":28,"text":103,"correct":26},"填料密实、饱满",{"key":31,"text":105,"correct":22},"抹带宽度、厚度合格",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1126545,"下列检测垃圾填埋场防渗效果的方法中，错误的是()。",[110,112,114,116],{"key":20,"text":111,"correct":26},"在填埋垃圾之前的填埋场影响区域内打水质观测井",{"key":24,"text":113,"correct":26},"设两层排水系统时，从提升泵井中抽取水样",{"key":28,"text":115,"correct":22},"在垃圾填埋区内打水质观测井",{"key":31,"text":117,"correct":26},"填埋垃圾前后从水质观测井中抽取水样进行比较",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1126546,"干燥地区园林假山常用的基础材料是()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"桩基",{"key":24,"text":125,"correct":26},"石基",{"key":28,"text":127,"correct":22},"灰土基",{"key":31,"text":129,"correct":26},"钢筋混凝土基",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1126547,"选择锤击沉桩设备的一般思路为()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"选择锤重→选择锤型→选择桩架",{"key":24,"text":137,"correct":22},"选择锤型→选择锤重→选择桩架",{"key":28,"text":139,"correct":26},"选择桩架→选择锤重→选择锤型",{"key":31,"text":141,"correct":26},"选择桩架→选择锤型→选择锤重",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1126548,"道路用石灰稳定土的石灰剂量是指石灰干重占()的百分率。",[146,148,150,152],{"key":20,"text":147,"correct":26},"干石灰土重",{"key":24,"text":149,"correct":26},"石灰土重",{"key":28,"text":151,"correct":22},"干土重",{"key":31,"text":153,"correct":26},"原状土重",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1126549,"现浇预应力混凝土梁支架施工时，设置预拱度要考虑的下述变形值中，不符合规范要求的是()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"卸架后上部构造本身及全部活载所产生的竖向挠度",{"key":24,"text":161,"correct":26},"支架在荷载作用下的弹性和非弹性压缩",{"key":28,"text":163,"correct":26},"支架基底在荷载作用下的非弹性沉降",{"key":31,"text":45,"correct":26},{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1126550,"软土地区地下连续墙成槽时，不会造成槽壁坍塌的是()。",[169,171,173,175],{"key":20,"text":170,"correct":26},"槽壁泥浆黏度过低",{"key":24,"text":172,"correct":26},"导墙建在软弱填土中",{"key":28,"text":174,"correct":26},"槽段划分过长",{"key":31,"text":176,"correct":22},"导墙过深",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1126551,"沉井施工铺垫木时，以n表示垫木根数，以Q表示第一节沉井重量，L和b表示垫木的长和宽，[σ]表示基底土容许承压力，则垫木根数计算公式为()。",[181,183,185,187],{"key":20,"text":182,"correct":26},"n=2Q\u002F(Lb[σ])",{"key":24,"text":184,"correct":22},"n=Q\u002F(Lb[σ])",{"key":28,"text":186,"correct":26},"n=Q\u002F(2Lb[σ])",{"key":31,"text":188,"correct":26},"n=Q\u002F(3Lb[σ])",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1126552,"将草皮切成30mm×30mm方块播种的草坪铺植方法是()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"点铺",{"key":24,"text":196,"correct":26},"间铺",{"key":28,"text":198,"correct":26},"密铺",{"key":31,"text":200,"correct":26},"茎铺",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1126553,"假山的施工工艺流程为()。",[205,207,209,211],{"key":20,"text":206,"correct":26},"放线挖槽→拉底→基础施工→扫缝→中层施工→收顶→检查→完形",{"key":24,"text":208,"correct":26},"放线挖槽→基础施工→拉底→中层施工→扫缝→检查→收顶→完形",{"key":28,"text":210,"correct":26},"放线挖槽→拉底→基础施工→中层施工→扫缝→收顶→检查→完形",{"key":31,"text":212,"correct":22},"放线挖槽→基础施工→拉底→中层施工→扫缝→收顶→检查→完形",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1126554,"某市政工程的网络计划图如下，其合理的合同工期应是()个月。",[217,219,221,223],{"key":20,"text":218,"correct":26},"6",{"key":24,"text":220,"correct":26},"8",{"key":28,"text":222,"correct":26},"9",{"key":31,"text":224,"correct":22},"10",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1126555,"城市污水处理厂污泥处理常用的流程为()。",[229,231,233,235],{"key":20,"text":230,"correct":26},"污泥消化→污泥浓缩→机械脱水→干燥与焚烧",{"key":24,"text":232,"correct":26},"机械脱水→污泥浓缩→污泥消化→干燥与焚烧",{"key":28,"text":234,"correct":22},"污泥浓缩→污泥消化→机械脱水→干燥与焚烧",{"key":31,"text":236,"correct":26},"污泥浓缩→机械脱水→污泥消化→干燥与焚烧",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1126556,"钻孔灌注桩钢筋骨架的起吊方法宜采用()。",[241,243,245,247],{"key":20,"text":242,"correct":26},"吊点位于骨架上部的一点拖吊",{"key":24,"text":244,"correct":26},"吊点位于骨架中心的一点吊",{"key":28,"text":246,"correct":22},"吊点位于骨架下部及中上部的二点吊",{"key":31,"text":248,"correct":26},"吊点平均分布于骨架上的三点吊",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1126557,"下列选项中，只属于有圬工基础管涵施工工序的是()。",[253,255,257,259],{"key":20,"text":254,"correct":26},"开挖基坑",{"key":24,"text":256,"correct":22},"浇筑混凝土基础",{"key":28,"text":258,"correct":26},"安装管节",{"key":31,"text":260,"correct":26},"修筑出入端墙",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1126558,"为保证树木成活，树木定植后浇第一遍水应在()小时内进行。",[265,267,269,271],{"key":20,"text":266,"correct":22},"24h",{"key":24,"text":268,"correct":26},"36h",{"key":28,"text":270,"correct":26},"48h",{"key":31,"text":272,"correct":26},"72h",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1126559,"下列关于静力压桩法特点的说法中错误的是()。",[277,279,281,283],{"key":20,"text":278,"correct":26},"产生的振动较小",{"key":24,"text":280,"correct":26},"桩顶不易损坏",{"key":28,"text":282,"correct":26},"不易产生偏心沉桩",{"key":31,"text":284,"correct":22},"机械设备可快速移动",{"id":286,"libraryId":5,"type":287,"typeLabel":288,"stem":289,"options":290,"answer":302,"analysis":33},1126560,2,"多选题","混凝土配合比的设计步骤包括（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"初步配合比设计阶段",{"key":24,"text":294,"correct":22},"试验室配合比设计阶段",{"key":28,"text":296,"correct":22},"基准配合比设计阶段",{"key":31,"text":298,"correct":22},"施工配合比设计阶段",{"key":300,"text":301,"correct":26},"E","配合比实施使用阶段","ABCD",{"id":304,"libraryId":5,"type":287,"typeLabel":288,"stem":305,"options":306,"answer":302,"analysis":33},1126561,"在钢筋下料前，应核对（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"钢筋品种",{"key":24,"text":310,"correct":22},"钢筋规格",{"key":28,"text":312,"correct":22},"钢筋等级",{"key":31,"text":314,"correct":22},"钢筋加工数量",{"key":300,"text":316,"correct":26},"钢筋化学成分",{"id":318,"libraryId":5,"type":287,"typeLabel":288,"stem":319,"options":320,"answer":331,"analysis":33},1126562,"设计预应力混凝土结构模板时，应考虑施加预应力后（ ）等。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"构件的上拱",{"key":24,"text":324,"correct":22},"支座螺栓位移",{"key":28,"text":326,"correct":26},"构件的非弹性变形",{"key":31,"text":328,"correct":22},"预埋件位移",{"key":300,"text":330,"correct":22},"构件的弹性压缩","ABDE",{"id":333,"libraryId":5,"type":287,"typeLabel":288,"stem":334,"options":335,"answer":346,"analysis":33},1126563,"下列符合桥面防水系统施工技术要求有（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"基层强度 应达到设计强度的80%，方可进行防水层施工",{"key":24,"text":339,"correct":26},"基层混凝土 要进行粗糙度的处理，一般采用人工打磨处理",{"key":28,"text":341,"correct":26},"防水涂料施工不宜在风力大于3级时施工",{"key":31,"text":343,"correct":26},"防水卷材施工温度应大于0度",{"key":300,"text":345,"correct":22},"涂料防水层施工完成后要采取保护措施，防止其他作业破坏","AE",{"id":348,"libraryId":5,"type":287,"typeLabel":288,"stem":349,"options":350,"answer":361,"analysis":33},1126564,"钢绞线进场的检验要求，包括（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":26},"检验有一项不合格则该批钢绞线报废",{"key":24,"text":354,"correct":22},"检查质量证明书和包装",{"key":28,"text":356,"correct":26},"分批检验，每批重量不大于65t",{"key":31,"text":358,"correct":22},"每批少于3盘应全数检验",{"key":300,"text":360,"correct":22},"每批大于3盘则任取3盘","BDE",{"id":363,"libraryId":5,"type":287,"typeLabel":288,"stem":364,"options":365,"answer":302,"analysis":33},1126565,"锚具、夹具及连接器进场验收时，应按出厂合格证和质量证明书进行核查，核查的内容包括（ ）。",[366,368,370,372,374],{"key":20,"text":367,"correct":22},"锚固性能",{"key":24,"text":369,"correct":22},"型号",{"key":28,"text":371,"correct":22},"规格",{"key":31,"text":373,"correct":22},"数量",{"key":300,"text":375,"correct":26},"外观检查",{"id":377,"libraryId":5,"type":287,"typeLabel":288,"stem":378,"options":379,"answer":389,"analysis":33},1126566,"钢筋混凝土结构所用钢筋的（ ）等均应符合设计要求和现行国家标准。",[380,382,384,385,387],{"key":20,"text":381,"correct":22},"品种",{"key":24,"text":383,"correct":26},"等级",{"key":28,"text":371,"correct":22},{"key":31,"text":386,"correct":26},"牌号",{"key":300,"text":388,"correct":22},"性能","ACE",{"id":391,"libraryId":5,"type":287,"typeLabel":288,"stem":392,"options":393,"answer":404,"analysis":33},1126567,"后张法施工中，在没有设计要求的桥梁某些特殊部位，可以采用符合要求的（ ），且管壁厚不得小于2mm的管道。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"平滑钢管",{"key":24,"text":397,"correct":26},"粗糙的塑料管",{"key":28,"text":399,"correct":22},"高密度聚乙烯管",{"key":31,"text":401,"correct":26},"低密度聚氯乙烯管",{"key":300,"text":403,"correct":26},"粗糙的螺纹管","AC",{"id":406,"libraryId":5,"type":287,"typeLabel":288,"stem":407,"options":408,"answer":419,"analysis":33},1126568,"桥梁按照用途划分，正确的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"人行桥",{"key":24,"text":412,"correct":22},"渡槽",{"key":28,"text":414,"correct":26},"圬工桥",{"key":31,"text":416,"correct":26},"钢筋混凝土桥",{"key":300,"text":418,"correct":26},"栈桥","AB",{"id":421,"libraryId":5,"type":287,"typeLabel":288,"stem":422,"options":423,"answer":404,"analysis":33},1126569,"下列关于伸缩装置的说法，正确的有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":22},"伸缩装置应能够满足桥梁纵.横.竖三向的变形要求",{"key":24,"text":427,"correct":26},"伸缩装置应具有可靠的防排水系统，防水系统应符合注满水48h无渗漏的要求",{"key":28,"text":429,"correct":22},"伸缩装置不得露天存放",{"key":31,"text":431,"correct":26},"伸缩装置安装前应由安全员检查签字后方可固定",{"key":300,"text":433,"correct":26},"伸缩装置产生显著错位时，应进行强度性能检测",{"id":435,"libraryId":5,"type":287,"typeLabel":288,"stem":436,"options":437,"answer":302,"analysis":33},1126570,"桥梁分类的方式很多，通常从（ ）等方面来划分。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"受力特点",{"key":24,"text":441,"correct":22},"建桥材料",{"key":28,"text":443,"correct":22},"适用跨度",{"key":31,"text":445,"correct":22},"施工条件",{"key":300,"text":447,"correct":26},"投资预算",{"id":449,"libraryId":5,"type":287,"typeLabel":288,"stem":450,"options":451,"answer":419,"analysis":33},1126571,"在预应力混凝土中，当氯离子总含量超过0.06%时，可以采取的防锈措施有（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"提高混凝土密实度",{"key":24,"text":455,"correct":22},"掺加阻锈剂",{"key":28,"text":457,"correct":26},"减小保护层厚度",{"key":31,"text":459,"correct":26},"掺加减水剂",{"key":300,"text":461,"correct":26},"加入引气剂",{"id":463,"libraryId":5,"type":287,"typeLabel":288,"stem":464,"options":465,"answer":475,"analysis":33},1126572,"锚具、夹具和连接器进场时，除应按出厂合格证和质量证明书核查其锚固性能类别、型号、规格及数量外，还应按规定进行（ ）。",[466,467,469,471,473],{"key":20,"text":375,"correct":22},{"key":24,"text":468,"correct":26},"强度检验",{"key":28,"text":470,"correct":22},"硬度检验",{"key":31,"text":472,"correct":22},"静载锚固性能试验",{"key":300,"text":474,"correct":26},"动载锚固性能试验","ACD",{"id":477,"libraryId":5,"type":287,"typeLabel":288,"stem":478,"options":479,"answer":419,"analysis":33},1126573,"下列桥梁类型中，属于按主要承重结构所用的材料进行划分的有（ ）。",[480,481,483,485,487],{"key":20,"text":414,"correct":22},{"key":24,"text":482,"correct":22},"钢桥",{"key":28,"text":484,"correct":26},"运水桥",{"key":31,"text":486,"correct":26},"跨线桥",{"key":300,"text":488,"correct":26},"铁路桥",{"id":490,"libraryId":5,"type":287,"typeLabel":288,"stem":491,"options":492,"answer":503,"analysis":33},1126574,"运送混凝土拌合物的容器或管道应不漏浆、（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":26},"吸水",{"key":24,"text":496,"correct":26},"干燥",{"key":28,"text":498,"correct":22},"内壁光滑",{"key":31,"text":500,"correct":22},"能保证卸料及输送畅通",{"key":300,"text":502,"correct":26},"外壁粗糙","CD",{"id":505,"libraryId":5,"type":287,"typeLabel":288,"stem":506,"options":507,"answer":518,"analysis":33},1126575,"下列后张法预应力孔道压浆与封锚规定中，正确的有（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":26},"压浆过程中及压浆后24h内，结构混凝土的温度不得低于5℃",{"key":24,"text":511,"correct":22},"多跨连续有连接器的预应力筋孔道，应张拉完一段灌注一段",{"key":28,"text":513,"correct":22},"压浆作业，每一工作班应留取不少于3组砂浆试块，标养28d",{"key":31,"text":515,"correct":22},"当白天气温高于35℃时，压浆宜在夜间进行",{"key":300,"text":517,"correct":26},"封锚混凝土的强度等级不宜低于结构混凝土强度等级的75%，且不低于30MPa","BCD",{"id":520,"libraryId":5,"type":287,"typeLabel":288,"stem":521,"options":522,"answer":533,"analysis":33},1126576,"关于混凝土拌合物坍落度的检测规定，正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":22},"应在搅拌地点和浇筑地点分别随机取样检测",{"key":24,"text":526,"correct":26},"混凝土从出料至人模的时间不超过20min，可仅在搅拌地点检测",{"key":28,"text":528,"correct":26},"每一工作班或每一单元结构物检测不应少于一次",{"key":31,"text":530,"correct":22},"评定时应以浇筑地点的测值为准",{"key":300,"text":532,"correct":22},"在检测坍落度时，还应观察混凝土拌合物的黏聚性和保水性","ADE",{"id":535,"libraryId":5,"type":287,"typeLabel":288,"stem":536,"options":537,"answer":475,"analysis":33},1126577,"下列预应力张拉施工规定中，正确的有（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"预应力筋的张拉控制应力必须符合设计规定",{"key":24,"text":541,"correct":26},"预应力筋采用应力控制方法张拉时，应以理论伸长值进行校核",{"key":28,"text":543,"correct":22},"伸长值应从初应力时开始量测",{"key":31,"text":545,"correct":22},"实际伸长值与理论伸长值的差值应符合设计要求",{"key":300,"text":547,"correct":26},"设计无规定时，实际伸长值与理论伸长值之差应控制在5%以内",{"id":549,"libraryId":5,"type":287,"typeLabel":288,"stem":550,"options":551,"answer":562,"analysis":33},1126578,"下列说法中，关于钢筋现场绑扎的规定正确的有（ ）。",[552,554,556,558,560],{"key":20,"text":553,"correct":22},"圆形柱所有竖向钢筋弯钩平面应朝向圆心",{"key":24,"text":555,"correct":22},"梁和柱的箍筋弯钩叠合处，应位于梁和柱角的受力钢筋处，并错开设置",{"key":28,"text":557,"correct":26},"矩形柱角部竖向钢筋的弯钩平面与模板面的夹角应为15°",{"key":31,"text":559,"correct":22},"钢筋的交叉点应采用钢丝绑牢，必要时可辅以点焊",{"key":300,"text":561,"correct":26},"绑扎接头搭接长度范围内的箍筋间距：当钢筋受拉时应小于10d，且不得大于200mm","ABD",{"id":564,"libraryId":5,"type":287,"typeLabel":288,"stem":565,"options":566,"answer":577,"analysis":33},1126579,"下列说法中属于梁式桥特征的有（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":26},"在竖向荷载作用下存在较大水平反力",{"key":24,"text":570,"correct":22},"外力作用方向与承重结构的轴线接近垂直",{"key":28,"text":572,"correct":22},"与同样跨径的其他结构体系相比，梁内产生的弯矩最大",{"key":31,"text":574,"correct":26},"通常需用预应力钢筋混凝土建造",{"key":300,"text":576,"correct":22},"通常需用抗弯能力强的材料建造","BCE",{"id":579,"libraryId":5,"type":287,"typeLabel":288,"stem":580,"options":581,"answer":592,"analysis":33},1126580,"选择桥梁支座类型的依据有（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":22},"支承反力",{"key":24,"text":585,"correct":22},"跨度",{"key":28,"text":587,"correct":22},"建筑高度",{"key":31,"text":589,"correct":26},"水平转角",{"key":300,"text":591,"correct":22},"预期位移量","ABCE",{"id":594,"libraryId":5,"type":287,"typeLabel":288,"stem":595,"options":596,"answer":607,"analysis":33},1126581,"模板支架系统设置预拱度需要考虑的因素（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"支架基础受载后的沉降",{"key":24,"text":600,"correct":26},"支架系统设计计算的荷载",{"key":28,"text":602,"correct":22},"设计文件要求的预拱度",{"key":31,"text":604,"correct":22},"支架承受荷载后的弹性变形",{"key":300,"text":606,"correct":22},"杆件接头处的非弹性变形","ACDE",{"id":609,"libraryId":5,"type":287,"typeLabel":288,"stem":610,"options":611,"answer":592,"analysis":33},1126582,"关于支架、拱架搭设要求，正确的有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"支架立柱底端必须放置垫板或混凝土垫块",{"key":24,"text":615,"correct":22},"支架通行孔的两边应加护桩，夜间应设警示灯",{"key":28,"text":617,"correct":22},"易受漂流物冲撞的河中支架应设牢固的防护设施",{"key":31,"text":619,"correct":26},"支架或拱架应与施工脚手架、便桥相连",{"key":300,"text":621,"correct":22},"支架、拱架安装完毕，经检验合格后方可安装模板",{"id":623,"libraryId":5,"type":287,"typeLabel":288,"stem":624,"options":625,"answer":518,"analysis":33},1126583,"下列关于桥梁支座的说法，错误的有（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"支座必须具有足够的承载能力，以保证可靠的传递支座反力",{"key":24,"text":629,"correct":22},"支座对桥梁变形的约束要尽可能的大",{"key":28,"text":631,"correct":22},"桥梁支座不可更换",{"key":31,"text":633,"correct":22},"桥梁支座是连接桥梁上下部结构的重要部件，位于垫石和墩台之间",{"key":300,"text":635,"correct":26},"桥梁支座是桥梁的重要传力装置",{"id":637,"libraryId":5,"type":287,"typeLabel":288,"stem":638,"options":639,"answer":607,"analysis":33},1126584,"后张法预应力锚具和连接器按锚固方式不同，可分为（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":22},"支承式",{"key":24,"text":643,"correct":26},"楔紧式",{"key":28,"text":645,"correct":22},"握裹式",{"key":31,"text":647,"correct":22},"组合式",{"key":300,"text":649,"correct":22},"夹片式",{"id":651,"libraryId":5,"type":287,"typeLabel":288,"stem":652,"options":653,"answer":389,"analysis":33},1126585,"关于沉入桩施工技术要点，正确的有（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":22},"沉桩时，桩锤、桩帽或送桩帽应和桩身在同一中心线上",{"key":24,"text":657,"correct":26},"桩身垂直度偏差不得超过1%",{"key":28,"text":659,"correct":22},"接桩可采用焊接、法兰连接或机械连接",{"key":31,"text":661,"correct":26},"终止锤击应以控制贯入度为主，桩端设计标高为辅",{"key":300,"text":663,"correct":22},"沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护",{"id":665,"libraryId":5,"type":287,"typeLabel":288,"stem":666,"options":667,"answer":678,"analysis":33},1126586,"关于灌注桩水下混凝土灌注用导管要求的说法，正确的有( )。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"导管直径宜为20～30cm，节长宜为3m",{"key":24,"text":671,"correct":26},"导管不得漏水，试压的压力宜为孔底静水压力的1.2倍",{"key":28,"text":673,"correct":22},"导管采用法兰盘接头宜加锥形活套",{"key":31,"text":675,"correct":22},"导管轴线偏差不宜超过孔深的0.5%，且不宜大于10cm",{"key":300,"text":677,"correct":22},"采用螺旋丝扣型接头时必须有防止松脱装置","CDE",{"id":680,"libraryId":5,"type":287,"typeLabel":288,"stem":681,"options":682,"answer":475,"analysis":33},1126587,"下列重力式混凝土墩、台施工要求中，正确的有（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"墩台混凝土浇筑前应对基础混凝土顶面做凿毛处理，清除锚筋污锈",{"key":24,"text":686,"correct":26},"墩台混凝土宜水平分层浇筑，每层高度宜为1m",{"key":28,"text":688,"correct":22},"墩台混凝土分块浇筑时，每块面积不得小于50m2",{"key":31,"text":690,"correct":22},"明挖基础上灌筑墩、台第一层混凝土时，要防止水分被基础吸收",{"key":300,"text":692,"correct":26},"应选用水化热较大的混凝土",[694,697,700,703,706,709],{"id":15,"name":695,"category":7,"favorite":696},"领导干部任职前廉政法规知识测试题",92,{"id":698,"name":699,"category":7,"favorite":15},595,"建筑结构与设备",{"id":701,"name":702,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":704,"name":705,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":707,"name":708,"category":7,"favorite":8},534,"BIM工程师",{"id":710,"name":708,"category":7,"favorite":8},535]