[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,4,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,224,236,248,260,271,283,295,305,313,324,336,346,358,367,379,389,401,413,425,437,449,461,473,485,497,509,521,531,543,555,564,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1124623,1,"单选题","为提高对污染物的去除效果，改善和提高饮用水水质，除了常规处理工艺之外，还有预处理和深度处理工艺。下列属于深度处理技术的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","黏土吸附",false,{"key":24,"text":25,"correct":26},"B","吹脱法",true,{"key":28,"text":29,"correct":22},"C","生物膜法",{"key":31,"text":32,"correct":22},"D","高锰酸钾氧化","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1124624,"下列厂站构筑物中，属于污水处理构筑物的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"配水井",{"key":24,"text":41,"correct":22},"混凝沉淀池",{"key":28,"text":43,"correct":22},"反应池",{"key":31,"text":45,"correct":26},"生物塘",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1124625,"常用的给水处理方法中，混凝沉淀目的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"去除水中粗大颗粒杂质",{"key":24,"text":53,"correct":26},"去除水中胶体和悬浮杂质等",{"key":28,"text":55,"correct":22},"去除水中病毒和细菌",{"key":31,"text":57,"correct":22},"降低水中钙.镁离子含量，使硬水软化",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1124626,"沉井刃脚的垫层采用砂垫层上铺垫木方案时，以下说法中错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"砂垫层分布在刃脚中心线两侧，应考虑方便抽除垫木",{"key":24,"text":65,"correct":22},"砂垫层宜采用中粗砂，并应分层铺设.分层夯实",{"key":28,"text":67,"correct":22},"垫木铺设应使刃脚底面在同一水平面上，并符合设计起沉标高的要求",{"key":31,"text":69,"correct":26},"定位垫木的布置应使沉井成三点着力状态",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1124627,"金属止水带接头应分别采用折叠咬接或搭接；咬接或搭接必须采用（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"双面焊接",{"key":24,"text":77,"correct":22},"单面焊接",{"key":28,"text":79,"correct":22},"搭接",{"key":31,"text":81,"correct":22},"绑接",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1124628,"关于厂站水处理工艺管线的特点，说法错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"水流性能好",{"key":24,"text":89,"correct":26},"抗弯性能好",{"key":28,"text":91,"correct":22},"抗腐蚀性高",{"key":31,"text":93,"correct":22},"抗地层变位性好",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1124629,"地下水中铁、锰含量超过生活饮用水卫生标准时，要采用（ ）去除铁、锰。",[98,100,102,104],{"key":20,"text":99,"correct":22},"投加混凝剂",{"key":24,"text":101,"correct":22},"增设预沉池或沉淀池",{"key":28,"text":103,"correct":22},"加氯接触消毒",{"key":31,"text":105,"correct":26},"淹没式生物滤池",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1124630,"城市污水处理厂典型的工艺流程是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"污水→格栅→沉砂池→二沉池→生物处理池→出水",{"key":24,"text":113,"correct":26},"污水→格栅→沉砂池→初沉池→生物处理池→二沉池→出水",{"key":28,"text":115,"correct":22},"污水→格栅→混凝→沉淀→过滤→消毒",{"key":31,"text":117,"correct":22},"污水→格栅→曝气氧化→混凝沉淀→消毒→出水",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1124631,"下列哪个不是根据水质类型划分的污水的处理方法（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"物理处理法",{"key":24,"text":125,"correct":22},"生物处理法",{"key":28,"text":127,"correct":26},"自然沉淀法",{"key":31,"text":129,"correct":22},"化学处理法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1124632,"关于沉井下沉监控测量的说法，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"下沉时标高.轴线位移每班至少测量一次",{"key":24,"text":137,"correct":26},"封底前自沉速率应大于10mm\u002F8h",{"key":28,"text":139,"correct":22},"如发生异常情况应加密量测",{"key":31,"text":141,"correct":22},"大型沉井应进行结构变形和裂缝观测",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1124633,"张拉段无粘结预应力筋长度大于25m而小于50m时，宜采用（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"一端张拉",{"key":24,"text":149,"correct":26},"两端张拉",{"key":28,"text":151,"correct":22},"分段张拉",{"key":31,"text":153,"correct":22},"电热张拉",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1124634,"对浊度小于3mg\u002FL的河水，一般给水处理厂方法广泛采用的常规处理流程是（ ）。（09真题） A",[158,160,162,164],{"key":20,"text":159,"correct":22},"原水→过滤",{"key":24,"text":161,"correct":22},"原水→接触过滤→消毒",{"key":28,"text":163,"correct":26},"原水→混凝.沉淀或澄清→过滤→消毒",{"key":31,"text":165,"correct":22},"原水→调蓄预沉→混凝.沉淀→过滤→消毒",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1124636,"水位测针的读数精确度应达到（ ）mm。",[170,172,174,176],{"key":20,"text":171,"correct":26},"0.1",{"key":24,"text":173,"correct":22},"0.01",{"key":28,"text":175,"correct":22},"1",{"key":31,"text":177,"correct":22},"0.001",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1124637,"满水试验时水位上升速度不宜超过（ ）m\u002Fd。",[182,184,185,187],{"key":20,"text":183,"correct":22},"0.5",{"key":24,"text":175,"correct":22},{"key":28,"text":186,"correct":22},"1.5",{"key":31,"text":188,"correct":26},"2",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},1124638,"张拉段无黏结预应力筋长度小于（ ）m时宜采用一端张拉。",[193,195,197,199],{"key":20,"text":194,"correct":22},"15",{"key":24,"text":196,"correct":22},"2O",{"key":28,"text":198,"correct":26},"25",{"key":31,"text":200,"correct":22},"30",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1124639,"某贮水池设计水深6m，满水试验时，池内注满水所需最短时间为（ ）d。",[205,207,209,211],{"key":20,"text":206,"correct":22},"3.5",{"key":24,"text":208,"correct":22},"4.0",{"key":28,"text":210,"correct":22},"4.5",{"key":31,"text":212,"correct":26},"5.0",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1124640,"水池施工中，橡胶止水带的接头方法是（ ）。",[217,219,220,222],{"key":20,"text":218,"correct":26},"热接",{"key":24,"text":79,"correct":22},{"key":28,"text":221,"correct":22},"粘接",{"key":31,"text":223,"correct":22},"叠接",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1124641,"构筑物水池满水试验流程为（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"试验准备→水池内水位观测→水池注水→蒸发量测定→整理试验结论",{"key":24,"text":231,"correct":22},"试验准备→水池注水→蒸发量测定→水池内水位观测→整理试验结论",{"key":28,"text":233,"correct":26},"试验准备→水池注水→水池内水位观测→蒸发量测定→整理试验结论",{"key":31,"text":235,"correct":22},"试验准备→蒸发量测定→水池注水→整理试验结论→水池内水位观测",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},1124642,"单元组合式现浇钢筋混凝土水池工艺流程中，不含（ ）工序。",[240,242,244,246],{"key":20,"text":241,"correct":22},"土方开挖及地基处理",{"key":24,"text":243,"correct":22},"中心支柱浇筑",{"key":28,"text":245,"correct":22},"底板分块浇筑",{"key":31,"text":247,"correct":26},"顶板浇筑",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1124643,"辅助法沉井时，沉井外壁可采用阶梯形以减少下沉摩擦阻力时，在井外壁与土体之间应灌入（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"细砂",{"key":24,"text":255,"correct":22},"中砂",{"key":28,"text":257,"correct":26},"黄砂",{"key":31,"text":259,"correct":22},"黏土",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1124644,"沉井下沉监控量测做法错误的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"下沉时高程、轴线位移每班至少测量一次",{"key":24,"text":267,"correct":26},"终沉时，每班测一次，严格控制超沉",{"key":28,"text":269,"correct":22},"沉井封底前自沉速率应小于10mm\u002F8h",{"key":31,"text":141,"correct":22},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1124645,"现浇钢筋混凝土水池的防水层、水池外部防腐层施工以及池外回填土施工之前，应先做的是（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"严密性试验",{"key":24,"text":278,"correct":22},"水池闭水试验",{"key":28,"text":280,"correct":22},"渗水试验",{"key":31,"text":282,"correct":26},"水池满水试验",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1124647,"在软土或不稳定土层中采用横排撑板支撑，开始支撑的沟槽开挖深度不得超过（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"0.4m",{"key":24,"text":290,"correct":22},"0.6m",{"key":28,"text":292,"correct":22},"0.8m",{"key":31,"text":294,"correct":26},"1.0m",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1124648,"人工开挖多层沟槽的层间留台宽度时，直槽开挖不应小于（ ）m。",[299,300,302,304],{"key":20,"text":183,"correct":26},{"key":24,"text":301,"correct":22},"0.8",{"key":28,"text":303,"correct":22},"1.2",{"key":31,"text":186,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1124649,"除设计有要求外，压力管道水压试验的管段长度不宜大于（ ）km。",[309,310,311,312],{"key":20,"text":183,"correct":22},{"key":24,"text":175,"correct":26},{"key":28,"text":186,"correct":22},{"key":31,"text":188,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1124650,"采用手掘式顶管机时，应将地下水位降至管底（ ）以下。",[317,319,320,322],{"key":20,"text":318,"correct":26},"0.5m",{"key":24,"text":288,"correct":22},{"key":28,"text":321,"correct":22},"0.3m",{"key":31,"text":323,"correct":22},"0.2m",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1124651,"开挖深度在5m以内的沟槽，坡顶无荷载时，中密的砂土的边坡坡度最陡为（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":26},"1:1",{"key":24,"text":331,"correct":22},"1:0.75",{"key":28,"text":333,"correct":22},"1:0.67",{"key":31,"text":335,"correct":22},"1:0.5",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1124652,"关于水压试验主试验阶段，当停止注水补压，稳定（ ）min后压力下降不超过所允许压力下降数值时，将试验压力降至工作压力。",[340,342,343,345],{"key":20,"text":341,"correct":22},"10",{"key":24,"text":194,"correct":26},{"key":28,"text":344,"correct":22},"20",{"key":31,"text":200,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1124653,"球墨铸铁管（有水泥砂浆衬里）、钢管（有水泥砂浆衬里）、化学建材管浸泡（ ）h后，才进行水压试验。",[350,352,354,356],{"key":20,"text":351,"correct":22},"12",{"key":24,"text":353,"correct":26},"24",{"key":28,"text":355,"correct":22},"36",{"key":31,"text":357,"correct":22},"72",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1124654,"内径大于1000mm的现浇钢筋混凝土管渠，预（自）应力混凝土管、预应力钢筒混凝土管试验管段注满水后浸泡时间应不少于（ ）h。",[362,363,365,366],{"key":20,"text":353,"correct":22},{"key":24,"text":364,"correct":22},"48",{"key":28,"text":357,"correct":26},{"key":31,"text":351,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},1124655,"在城市给水排水管道工程不开槽法施工方法中，浅埋暗挖法施工适用性强，其适用管径为（ ）mm。",[371,373,375,377],{"key":20,"text":372,"correct":22},"300—4000",{"key":24,"text":374,"correct":22},"200—1800",{"key":28,"text":376,"correct":22},"大于3000",{"key":31,"text":378,"correct":26},"大于1000",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1124656,"人工开挖沟槽的槽深超过（ ）m时应该分层开挖。",[383,385,387,388],{"key":20,"text":384,"correct":22},"4",{"key":24,"text":386,"correct":26},"3",{"key":28,"text":188,"correct":22},{"key":31,"text":175,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1124657,"关于城市给水排水管道焊接，焊接接口内壁错边量不宜超过管壁厚度的（ ），且不得大于2mm。",[393,395,397,399],{"key":20,"text":394,"correct":22},"5%",{"key":24,"text":396,"correct":26},"10%",{"key":28,"text":398,"correct":22},"15%",{"key":31,"text":400,"correct":22},"20%",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1124658,"关于不开槽管道施工，起吊时工作井内严禁站人，当吊运重物下井距作业面底部小于（ ）mm，操作人员方可近前工作。",[405,407,409,411],{"key":20,"text":406,"correct":26},"500",{"key":24,"text":408,"correct":22},"800",{"key":28,"text":410,"correct":22},"1000",{"key":31,"text":412,"correct":22},"1200",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1124659,"盾构法施工用于穿越地面障碍的给水排水主干管道工程，直径一般在（ ）mm以上。",[417,419,421,423],{"key":20,"text":418,"correct":22},"6000",{"key":24,"text":420,"correct":22},"5000",{"key":28,"text":422,"correct":22},"4000",{"key":31,"text":424,"correct":26},"3000",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1124660,"用于砌筑沟道的机制烧结砖强度等级符合设计要求，一般不宜低于（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"MU7.5",{"key":24,"text":432,"correct":26},"MU10",{"key":28,"text":434,"correct":22},"MU15",{"key":31,"text":436,"correct":22},"MU25",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1124661,"不属于城市给水排水管道全断面修复的方法是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"爆管法",{"key":24,"text":444,"correct":22},"缠绕法",{"key":28,"text":446,"correct":22},"内衬法",{"key":31,"text":448,"correct":22},"喷涂法",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1124662,"不同种类、不同材质、不同结构管道抢修方法不尽相同，如预应力钢筋混凝土管一般可用（ ）后再用卡盘压紧固定。",[453,455,457,459],{"key":20,"text":454,"correct":22},"补焊或盖压补焊",{"key":24,"text":456,"correct":26},"补麻.补灰",{"key":28,"text":458,"correct":22},"两合揣袖",{"key":31,"text":460,"correct":22},"转换接口连接",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1124663,"不开槽管道施工方法中，适用于钢管的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"定向钻",{"key":24,"text":468,"correct":26},"夯管",{"key":28,"text":470,"correct":22},"盾构",{"key":31,"text":472,"correct":22},"密闭式顶管",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1124664,"给水排水管道做功能性试验，下列说法错误的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"给水排水管道功能性试验分为压力管道的水压试验和无压管道的严密性试验",{"key":24,"text":480,"correct":22},"压力管道水压试验进行实际渗水量测定时，宜采用注水法进行",{"key":28,"text":482,"correct":26},"管道严密性试验只能采用闭水试验",{"key":31,"text":484,"correct":22},"水压试验合格的管道方可通水投入运行",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1124665,"设计无要求时可按经验公式B=D0+2×（b1+b2+b3）确定沟槽底部开挖宽度，其中D0为（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"管直径",{"key":24,"text":492,"correct":26},"管外径",{"key":28,"text":494,"correct":22},"管内径",{"key":31,"text":496,"correct":22},"管壁厚",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1124666,"关于排水管道闭气试验适用条件，错误的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"混凝土类的无压管道在回填土前进行的严密性试验",{"key":24,"text":504,"correct":26},"地下水位应低于管外底100mm",{"key":28,"text":506,"correct":22},"下雨时不得进行闭气试验",{"key":31,"text":508,"correct":22},"环境温度为-15～50℃",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1124667,"排水不良造成地基土扰动时，扰动深度在100mm以内时，宜回填（ ）进行处理。",[513,515,517,519],{"key":20,"text":514,"correct":26},"级配砂砾",{"key":24,"text":516,"correct":22},"卵石",{"key":28,"text":518,"correct":22},"块石",{"key":31,"text":520,"correct":22},"砾石",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1124668,"小口径金属管道，当无地层变形控制要求且顶力满足施工要求时，可采用（ ）。",[525,527,529,530],{"key":20,"text":526,"correct":26},"挤密土层顶管法",{"key":24,"text":528,"correct":22},"盾构法",{"key":28,"text":466,"correct":22},{"key":31,"text":468,"correct":22},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1124669,"相同条件下放坡开挖沟槽，可采用最陡边坡的土层是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"经井点降水后的软土",{"key":24,"text":538,"correct":22},"中密砂土",{"key":28,"text":540,"correct":26},"硬塑黏土",{"key":31,"text":542,"correct":22},"硬塑粉土",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":28,"analysis":33},1124670,"下列关于缠绕法的说法中，错误的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"可以长距离施工，施工速度快",{"key":24,"text":550,"correct":22},"可适应大曲率半径的弯管和管径的变化",{"key":28,"text":552,"correct":26},"不能利用现有检查井",{"key":31,"text":554,"correct":22},"管道的过流断面有损失",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},1124671,"施工距离短的不开槽施工方法是（ ）。",[559,560,561,563],{"key":20,"text":472,"correct":22},{"key":24,"text":470,"correct":22},{"key":28,"text":562,"correct":22},"浅埋暗挖",{"key":31,"text":466,"correct":26},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1124672,"全断面修复的方法中，适用于管线长度在600m以内各类管道的修复是（ ）。",[568,569,570,571],{"key":20,"text":446,"correct":26},{"key":24,"text":444,"correct":22},{"key":28,"text":448,"correct":22},{"key":31,"text":442,"correct":22},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":28,"analysis":33},1124673,"关于给排水工程中圆井砌筑表述错误的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"排水管道检查井内的流槽，宜与井壁同时进行砌筑",{"key":24,"text":579,"correct":22},"砌块应垂直砌筑",{"key":28,"text":581,"correct":26},"砌筑后钻孔安装踏步",{"key":31,"text":583,"correct":22},"内外井壁应采用水泥砂浆勾缝",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},1124674,"破管外挤也称爆管法，下列不属于爆管法的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"气动爆管",{"key":24,"text":591,"correct":22},"液动爆管",{"key":28,"text":593,"correct":22},"切割爆管",{"key":31,"text":595,"correct":26},"爆破爆管",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]