[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,36,50,2846,[13,34,46,58,70,82,94,106,118,130,142,153,163,175,187,199,210,222,234,246,258,270,282,294,306,318,330,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1126338,1,"单选题","（2018年真题）在基坑放坡开挖时，下列做法错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","坡面设置土钉",false,{"key":24,"text":25,"correct":26},"B","坡项1.5m范围内堆放应急土袋",true,{"key":28,"text":29,"correct":22},"C","坡面挂网喷射混凝土",{"key":31,"text":32,"correct":22},"D","土工织物覆盖坡面","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1126339,"（2018年真题）对于浅基坑软土地基，能提高地基承载力且方法简单操作方便的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"水泥土搅拌法",{"key":24,"text":41,"correct":22},"压密注浆法",{"key":28,"text":43,"correct":26},"换填材料加固法",{"key":31,"text":45,"correct":22},"格栅式加固法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1126340,"单管高压喷射注浆法喷射的介质为()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"水泥浆液",{"key":24,"text":53,"correct":22},"净水",{"key":28,"text":55,"correct":22},"空气",{"key":31,"text":57,"correct":22},"膨润土泥浆",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1126341,"关于地下连续墙施工的说法，错误的是（ ）。2017真题",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工振动小，噪声低",{"key":24,"text":65,"correct":26},"不适用于卵砾石地层",{"key":28,"text":67,"correct":22},"刚度大，开挖深度大",{"key":31,"text":69,"correct":22},"可作为主体结构的一部分",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1126342,"（2020年真题）在软弱地层的基坑工程中，支撑结构挡土的应力传递路径是()",[74,76,78,80],{"key":20,"text":75,"correct":22},"土压力→围檩→围护桩→支撑",{"key":24,"text":77,"correct":22},"土压力→围护桩→支撑→围檁",{"key":28,"text":79,"correct":22},"土压力→围檩→支撑→围护桩",{"key":31,"text":81,"correct":26},"土压力→围护桩→围檩→支撑",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1126343,"下图是喷锚暗挖法中单侧壁导坑法的施工方法示意图，正常的施工顺序为()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"b→c→a",{"key":24,"text":89,"correct":26},"a→b→c",{"key":28,"text":91,"correct":22},"c→b→a",{"key":31,"text":93,"correct":22},"b→a→c",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1126344,"浅埋暗挖法开挖方式中，将结构断面分成上下多个工作面、分步开挖的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"全断面开挖法",{"key":24,"text":101,"correct":22},"侧洞法",{"key":28,"text":103,"correct":22},"中洞法",{"key":31,"text":105,"correct":26},"台阶开挖法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1126345,"关于暗挖隧道小导管注浆加固技术的说法，错误的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"根据工程条件试验确定浆液及其配合比",{"key":24,"text":113,"correct":22},"应严格控制小导管的长度、开孔率、安设角度和方向",{"key":28,"text":115,"correct":22},"小导管的尾部必须设置封堵孔，防止漏浆",{"key":31,"text":117,"correct":26},"注浆时间应由试验确定，注浆压力可不控制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1126346,"地铁车站结构施工质量控制中，不属于接缝防水控制重点的是()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"预留孔洞",{"key":24,"text":125,"correct":22},"后浇带",{"key":28,"text":127,"correct":22},"施工缝",{"key":31,"text":129,"correct":22},"变形缝",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1126347,"关于小导管注浆说法错误的是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"超前小导管支护必须配合钢拱架使用",{"key":24,"text":137,"correct":26},"钢管长度8～30m不等",{"key":28,"text":139,"correct":22},"钢管应沿拱的环向向外设置外插角",{"key":31,"text":141,"correct":22},"两排小导管在纵向应有一定搭接长度",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1126348,"当地层条件差、断面特别大时，浅埋暗挖隧道施工不宜采用()。",[146,147,149,151],{"key":20,"text":103,"correct":22},{"key":24,"text":148,"correct":22},"柱洞法",{"key":28,"text":150,"correct":22},"洞桩法",{"key":31,"text":152,"correct":26},"全断面法",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1126349,"将结构断面分成两个部分，即分成上下两个工作面，分步开挖的浅埋暗挖施工方法称为()。",[157,159,160,161],{"key":20,"text":158,"correct":26},"台阶法",{"key":24,"text":152,"correct":22},{"key":28,"text":103,"correct":22},{"key":31,"text":162,"correct":22},"单侧壁导坑法",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1126350,"关于小导管注浆的说法，错误的是()。",[167,169,171,173],{"key":20,"text":168,"correct":26},"在软弱、破碎地层中凿孔后易塌孔时，必须采取超前小导管支护",{"key":24,"text":170,"correct":22},"超前小导管必须配合钢拱架使用",{"key":28,"text":172,"correct":22},"在条件允许时，可以在地面进行超前注浆加固",{"key":31,"text":174,"correct":22},"在有导洞时，可在导洞内对隧道周边进行径向注浆加固",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":28,"analysis":33},1126351,"关于小导管注浆加固技术的说法，错误的是()。",[179,181,183,185],{"key":20,"text":180,"correct":22},"小导管支护和超前加固必须配合钢拱架使用",{"key":24,"text":182,"correct":22},"小导管安装位置应正确并具备足够的有效长度",{"key":28,"text":184,"correct":26},"小导管采用直径70~180mm的无缝钢管",{"key":31,"text":186,"correct":22},"钢管沿隧道纵向的搭接长度一般不小于1m",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1126352,"暗挖隧道环形开挖预留核心土法施工工艺流程中，紧接在“开挖环形拱部→架立钢支撑→喷射混凝土”后的工序是（）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"封底",{"key":24,"text":194,"correct":22},"二次衬砌",{"key":28,"text":196,"correct":22},"接长钢支撑",{"key":31,"text":198,"correct":26},"开挖核心土和下台阶",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1126353,"浅埋暗挖法修建隧道的施工方法中，对围岩的扰动次数最少的是()。",[203,204,206,208],{"key":20,"text":152,"correct":26},{"key":24,"text":205,"correct":22},"正台阶环形开挖法",{"key":28,"text":207,"correct":22},"中隔壁法",{"key":31,"text":209,"correct":22},"CRD法",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1126354,"下图为隧道正台阶环形开挖法的示意图，施工中应最先开挖()。",[214,216,218,220],{"key":20,"text":215,"correct":22},"a",{"key":24,"text":217,"correct":26},"b",{"key":28,"text":219,"correct":22},"c和d",{"key":31,"text":221,"correct":22},"e",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1126355,"（2020年真题）竖井马头门破除施工工序有：①预埋暗梁、②破除拱部、③破除侧墙、④拱部地层加固、⑤破除底板，正确的顺序为（）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"①→②→③→④→⑤",{"key":24,"text":229,"correct":26},"①→④→②→③→⑤",{"key":28,"text":231,"correct":22},"①→④→③→②→⑤",{"key":31,"text":233,"correct":22},"①→②→④→③→⑤",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1126356,"城市污水一级处理工艺中采用的构筑物是()。",[238,240,242,244],{"key":20,"text":239,"correct":22},"污泥消化池",{"key":24,"text":241,"correct":26},"沉砂池",{"key":28,"text":243,"correct":22},"二次沉淀池",{"key":31,"text":245,"correct":22},"污泥浓缩池",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1126357,"污水处理方法中，属于物理处理法的是()。",[250,252,254,256],{"key":20,"text":251,"correct":22},"氧化还原法",{"key":24,"text":253,"correct":26},"沉淀法",{"key":28,"text":255,"correct":22},"生物膜法",{"key":31,"text":257,"correct":22},"活性污泥法",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1126358,"某自来水厂工艺流程为：原水→空气分离器→活性氧化铝滤池→清水池→用户，用于去除地下水中的()。",[262,264,266,268],{"key":20,"text":263,"correct":22},"铁",{"key":24,"text":265,"correct":22},"锰",{"key":28,"text":267,"correct":26},"氟",{"key":31,"text":269,"correct":22},"铅",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1126359,"城市污水处理厂典型的工艺流程为()。",[274,276,278,280],{"key":20,"text":275,"correct":22},"沉砂池→格栅→初沉池→曝气池→二沉池→消毒",{"key":24,"text":277,"correct":26},"格栅→沉砂池→初沉池→曝气池→二沉池→消毒",{"key":28,"text":279,"correct":22},"初沉池→格栅→沉砂池→曝气池→二沉池→消毒",{"key":31,"text":281,"correct":22},"消毒→格栅→沉砂池→初沉池→曝气池→二沉池",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1126360,"用以除去水中粗大颗粒杂质的给水处理方法是（）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"过滤",{"key":24,"text":289,"correct":22},"软化",{"key":28,"text":291,"correct":22},"混凝土沉淀",{"key":31,"text":293,"correct":26},"自然沉淀",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1126361,"地表水作为饮用水源时，给水处理主要的去除对象是()。",[298,300,302,304],{"key":20,"text":299,"correct":26},"悬浮物和胶体",{"key":24,"text":301,"correct":22},"某些有机物",{"key":28,"text":303,"correct":22},"溶解氧",{"key":31,"text":305,"correct":22},"钙镁离子",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},1126362,"（2018年真题）污水三级处理是在一级、二级处理之后，进一步处理可导致水体富营养化的（ ）可溶性无机物。",[310,312,314,316],{"key":20,"text":311,"correct":22},"钠、碘",{"key":24,"text":313,"correct":22},"钙、镁",{"key":28,"text":315,"correct":22},"铁、锰",{"key":31,"text":317,"correct":26},"氮、磷",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},1126363,"关于污水处理厂试运行的规定，错误的是（ ）。2017真题",[322,324,326,328],{"key":20,"text":323,"correct":22},"参加试运行人员须经培训考试合格",{"key":24,"text":325,"correct":22},"单机试车后再进行设备机组试运行",{"key":28,"text":327,"correct":26},"全厂联机运行时间为12h",{"key":31,"text":329,"correct":22},"试运行之前，所有单项工程验收合格",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1126364,"（2020年真题）下列污水处理构筑物中，主要利用物理作用去除污染物的是（）。",[334,336,337,339],{"key":20,"text":335,"correct":22},"曝气池",{"key":24,"text":241,"correct":26},{"key":28,"text":338,"correct":22},"氧化沟",{"key":31,"text":340,"correct":22},"脱氮除磷池",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},1126365,"跨径为1.8m的钢筋混凝土板，混凝土强度最低达到设计强度标准值的()时，方可拆除其模板及支架。",[345,347,349,351],{"key":20,"text":346,"correct":26},"50%",{"key":24,"text":348,"correct":22},"60%",{"key":28,"text":350,"correct":22},"75%",{"key":31,"text":352,"correct":22},"100%",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1126366,"构筑物满水试验时向池内注水，每次注水高度应为设计水深的()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"1\u002F2",{"key":24,"text":360,"correct":26},"1\u002F3",{"key":28,"text":362,"correct":22},"1\u002F4",{"key":31,"text":364,"correct":22},"1\u002F5",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1126367,"钢筋混凝土水池满水试验标准中，允许渗水量不得超过()L\u002F(㎡?d)。",[369,371,373,375],{"key":20,"text":370,"correct":26},"2",{"key":24,"text":372,"correct":22},"2.5",{"key":28,"text":374,"correct":22},"3",{"key":31,"text":376,"correct":22},"3.5",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1126368,"下列施工内容中，属于排水下沉法沉井施工内容的是（）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"浇筑水下混凝土",{"key":24,"text":384,"correct":26},"降低地下水",{"key":28,"text":386,"correct":22},"水中挖土",{"key":31,"text":388,"correct":22},"水下封底",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1126369,"沉井用水枪冲土下沉，施工设备不包括()。",[393,395,397,399],{"key":20,"text":394,"correct":22},"高压水泵",{"key":24,"text":396,"correct":22},"吸泥器",{"key":28,"text":398,"correct":22},"供水管路",{"key":31,"text":400,"correct":26},"多瓣抓斗",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1126370,"水处理构筑物满水试验()之后进行。",[405,407,409,411],{"key":20,"text":406,"correct":22},"对混凝土结构，是在防水层施工",{"key":24,"text":408,"correct":22},"对混凝土结构，是在防腐层施工",{"key":28,"text":410,"correct":22},"对装配式预应力混凝土结构，是在保护层喷涂",{"key":31,"text":412,"correct":26},"对砌体结构，是在防水层施工",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1126371,"（2018年真题）塑料或橡胶止水带接头应采用（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"热接",{"key":24,"text":420,"correct":22},"叠接",{"key":28,"text":422,"correct":22},"咬接",{"key":31,"text":424,"correct":22},"对接",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1126372,"关于给水排水构筑物砌筑材料的技术要求，错误的是（ ）。2017真题",[429,431,433,435],{"key":20,"text":430,"correct":22},"机制烧结砖强度等级一般不低于MU10",{"key":24,"text":432,"correct":26},"设计无要求时，石材强度等级不得小于20MPa",{"key":28,"text":434,"correct":22},"混凝土砌块应符合设计要求和相关标准规定",{"key":31,"text":436,"correct":22},"水泥砂浆强度不应低于M10",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1126373,"关于防水构筑物变形缝处橡胶止水带施工技术要求，错误的是（ ）。2017真题",[441,443,445,447],{"key":20,"text":442,"correct":22},"填缝板应用模板固定牢固",{"key":24,"text":444,"correct":26},"止水带应用铁钉固定牢固",{"key":28,"text":446,"correct":22},"留置垂直施工缝时，端头必须安放模板，设置止水带",{"key":31,"text":448,"correct":22},"止水带的固定和安装，必须由项目技术员，质检员验收",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1126374,"（2019年）应根据钢筋直径、钢材、现场条件确定钢筋（）",[453,455,457,459],{"key":20,"text":454,"correct":22},"计量",{"key":24,"text":456,"correct":22},"切断",{"key":28,"text":458,"correct":22},"弯曲",{"key":31,"text":460,"correct":26},"连接",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1126375,"下列砌筑要求中，不属于圆井砌筑施工要点的是()。",[465,467,469,471],{"key":20,"text":466,"correct":26},"根据样板挂线，先砌中心的一列砖，并找准高程后接砌两侧",{"key":24,"text":468,"correct":22},"井内的流槽宜与井壁同时砌筑",{"key":28,"text":470,"correct":22},"用砌块逐层砌筑收口时，偏心收口的每层收进不应大于50mm",{"key":31,"text":472,"correct":22},"砌筑时应同时安装踏步",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1126376,"在无地下水的均匀土层中开挖4.5m深基坑，如果坑顶无荷载，基坑坑壁坡度不宜大于1:1的土类是（）",[477,479,481,483],{"key":20,"text":478,"correct":26},"砂类土",{"key":24,"text":480,"correct":22},"砾类土",{"key":28,"text":482,"correct":22},"粉土质砂",{"key":31,"text":484,"correct":22},"黏质土",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},1126377,"关于无压管道闭水试验准备工作的说法，错误的是()。",[489,491,493,495],{"key":20,"text":490,"correct":22},"管道及检查井外观质量已验收合格",{"key":24,"text":492,"correct":22},"管道未回填土且沟槽内无积水",{"key":28,"text":494,"correct":26},"试验管段所有敞口应封闭",{"key":31,"text":496,"correct":22},"做好水源引接、排水疏导等方案",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1126378,"（2018年真题）在不含地下水的软士层中，控制精度低的柔性管道施工，一般采用（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"顶管法",{"key":24,"text":504,"correct":22},"盾构法",{"key":28,"text":506,"correct":26},"定向钻",{"key":31,"text":508,"correct":22},"夯管法",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},1126379,"（2020年真题）关于给水排水管道功能性试验的说法，正确的是（）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"给水管道的功能性试验分为闭水试验和闭气试验",{"key":24,"text":516,"correct":22},"压力管道水压试验采用内渗法测定",{"key":28,"text":518,"correct":22},"无压管道的闭水试验要全管段进行闭水试验",{"key":31,"text":520,"correct":26},"管道内径大于700mm时，可抽取1\u002F3井段试验",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},1126380,"（2020年真题）适用于砂卵石土层，施工精度高，施工速度快，埋设直径800mm给水管道的不开槽施工法为（）。",[525,526,528,530],{"key":20,"text":506,"correct":22},{"key":24,"text":527,"correct":22},"夯管",{"key":28,"text":529,"correct":26},"密闭式顶管",{"key":31,"text":531,"correct":22},"浅埋暗挖",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1126381,"（2019年）市政工程埋地给排水管道不采用（）",[536,538,540,542],{"key":20,"text":537,"correct":22},"原状土基础",{"key":24,"text":539,"correct":22},"砂石基础",{"key":28,"text":541,"correct":22},"混凝土条基",{"key":31,"text":543,"correct":26},"砌块基础",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},1126382,"（2019年）下列方法中，用于排水管道更新的是（）",[548,550,552,554],{"key":20,"text":549,"correct":22},"缠绕法",{"key":24,"text":551,"correct":22},"内衬法",{"key":28,"text":553,"correct":26},"爆管法",{"key":31,"text":555,"correct":22},"喷涂法",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1126383,"设置于供热管道型钢支架根部的护墩，其作用是()。",[560,562,564,566],{"key":20,"text":561,"correct":22},"防撞",{"key":24,"text":563,"correct":26},"防水",{"key":28,"text":565,"correct":22},"防变形",{"key":31,"text":567,"correct":22},"防冲击",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1126384,"供热管网中，占据空间大的补偿器是()。",[572,574,576,578],{"key":20,"text":573,"correct":22},"球形补偿器",{"key":24,"text":575,"correct":26},"方形补偿器",{"key":28,"text":577,"correct":22},"套筒补偿器",{"key":31,"text":579,"correct":22},"波纹管补偿器",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1126385,"关于零度气温以下热力管道焊接的说法，错误的是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"应清除管道上的冰、霜、雪",{"key":24,"text":587,"correct":22},"焊接时应保证焊缝自由收缩",{"key":28,"text":589,"correct":26},"应在焊缝完全冷却之前敲打掉焊缝表面焊渣",{"key":31,"text":591,"correct":22},"应防止焊口的加速冷却",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},1126386,"热力管道球阀焊接要求中，符合规范要求的是()。",[596,598,600,602],{"key":20,"text":597,"correct":26},"焊接过程中要进行冷却",{"key":24,"text":599,"correct":22},"安装焊接时，球阀应关闭",{"key":28,"text":601,"correct":22},"焊接完立即投入使用",{"key":31,"text":603,"correct":22},"用阀门手轮作为吊装承重点",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":31,"analysis":33},1126387,"热力管网试运行应连续运行()。",[608,610,612,614],{"key":20,"text":609,"correct":22},"24h",{"key":24,"text":611,"correct":22},"36h",{"key":28,"text":613,"correct":22},"48h",{"key":31,"text":615,"correct":26},"72h",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]