[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,35,50,2846,[13,34,46,58,69,81,93,105,117,129,141,153,165,177,189,201,212,224,236,248,260,272,284,296,308,316,328,340,352,364,376,388,400,412,424,436,448,460,472,484,496,504,516,528,540,552,564,576,588,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1126288,1,"单选题","关于打入桩施工技术要求的说法，错误的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","水泥混凝土桩要达到100%设计强度并具有28d龄期",false,{"key":24,"text":25,"correct":22},"B","在桩的打入过程中，应始终保持锤、桩帽和桩身在同一轴线上",{"key":27,"text":28,"correct":29},"C","打密集群桩，一般是由前排向后排打",true,{"key":31,"text":32,"correct":22},"D","打桩时以控制桩尖设计标高为主","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1126289,"相邻的无支护基坑深浅不等时，一般采用()的开挖施工顺序。",[38,40,42,44],{"key":20,"text":39,"correct":22},"先浅后深",{"key":24,"text":41,"correct":29},"先深后浅",{"key":27,"text":43,"correct":22},"同时进行",{"key":31,"text":45,"correct":22},"交替进行",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1126290,"适用于各类土（包括强风化岩）的深水基坑围堰是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"套箱围堰",{"key":24,"text":53,"correct":22},"土围堰",{"key":27,"text":55,"correct":29},"钢板桩围堰",{"key":31,"text":57,"correct":22},"钢筋混凝土板桩围堰",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1126291,"适用于10m深水基础的围堰是()。",[62,63,65,67],{"key":20,"text":51,"correct":22},{"key":24,"text":64,"correct":22},"土袋围堰",{"key":27,"text":66,"correct":22},"铁丝笼围堰",{"key":31,"text":68,"correct":29},"双壁钢围堰",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},1126292,"关于静力压桩法施工混凝土预制桩的说法，错误的是()。",[73,75,77,79],{"key":20,"text":74,"correct":22},"桩顶不易损坏",{"key":24,"text":76,"correct":22},"施工时无冲击力",{"key":27,"text":78,"correct":22},"沉桩精度较高",{"key":31,"text":80,"correct":29},"沉桩过程不产生挤土效应",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},1126293,"采用悬臂浇筑法施工预应力钢筋混凝土连续梁时，正确的合龙顺序是()。",[85,87,89,91],{"key":20,"text":86,"correct":22},"次跨一中跨一边跨",{"key":24,"text":88,"correct":22},"中跨一边跨一次跨",{"key":27,"text":90,"correct":29},"边跨一次跨一中跨",{"key":31,"text":92,"correct":22},"次跨一边跨一中跨",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1126294,"现浇预应力钢筋混凝土连续梁施工时，支架和模板完成后应进行预压，其作用是消除基础的沉陷和()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"支架弹性变形",{"key":24,"text":100,"correct":29},"支架非弹性变形",{"key":27,"text":102,"correct":22},"混凝土收缩及温度变形",{"key":31,"text":104,"correct":22},"混凝土连续梁预拱度",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1126295,"在移动模架上浇筑预应力混凝土连续梁时，浇筑分段工作缝必须设在()附近。",[109,111,113,115],{"key":20,"text":110,"correct":29},"弯矩零点",{"key":24,"text":112,"correct":22},"1\u002F4最大弯矩点",{"key":27,"text":114,"correct":22},"1／2最大弯矩点",{"key":31,"text":116,"correct":22},"弯矩最大点",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1126296,"关于承重模板支架搭设的说法，正确的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"脚手架宜利用支架体系搭设",{"key":24,"text":124,"correct":29},"支架底部应有良好的排水措施",{"key":27,"text":126,"correct":22},"支架搭设完毕后即可投入使用",{"key":31,"text":128,"correct":22},"地基承载力不影响支架的搭设",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},1126297,"采用悬臂浇筑法施工多跨预应力混凝土连续梁时，正确的浇筑顺序是()。",[133,135,137,139],{"key":20,"text":134,"correct":29},"0号块→主梁节段→边跨合龙段→中跨合龙段",{"key":24,"text":136,"correct":22},"0号块→主梁节段→中跨合龙段→边跨合龙段",{"key":27,"text":138,"correct":22},"主梁节段→0号块→边跨合龙段→中跨合龙段",{"key":31,"text":140,"correct":22},"主梁节段→0号块→中跨合龙段→边跨合龙段",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1126298,"关于箱涵顶进施工的做法，错误的是( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"由上向下开挖",{"key":24,"text":148,"correct":22},"不超前挖土",{"key":27,"text":150,"correct":29},"逆坡挖土",{"key":31,"text":152,"correct":22},"严禁扰动基底土壤",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},1126299,"（2018年真题）关于涵洞两侧回填施工中的做法，错误的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"涵洞两侧同时回填，两侧对称进行，高差不大于300mm",{"key":24,"text":160,"correct":22},"填方中使用渣土、工业废渣等，需经过试验确认可靠",{"key":27,"text":162,"correct":29},"在涵洞靠近防水层部位可填含有少量碎石的细粒土",{"key":31,"text":164,"correct":22},"现浇钢筋混凝土涵洞，其胸腔回填土在混凝土强度达到设计强度70%后进行",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1126300,"钢筋的级别、种类和直径应按设计要求选用。当需要代换时，应由()单位作变更设计。",[169,171,173,175],{"key":20,"text":170,"correct":22},"建设",{"key":24,"text":172,"correct":22},"监理",{"key":27,"text":174,"correct":22},"施工",{"key":31,"text":176,"correct":29},"原设计",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},1126301,"某项目部一次进场80套锚具，至少应取()套做外观检查。",[181,183,185,187],{"key":20,"text":182,"correct":22},"3",{"key":24,"text":184,"correct":22},"5",{"key":27,"text":186,"correct":22},"8",{"key":31,"text":188,"correct":29},"10",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1126302,"现浇混凝土盖梁前，搭设施工脚手架时不能实施选项()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"通道必须设置临边防护",{"key":24,"text":196,"correct":29},"必须与承重支架相连接",{"key":27,"text":198,"correct":22},"必须可靠接地",{"key":31,"text":200,"correct":22},"必须验收合格后方可使用",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1126303,"同一天进场的同批次、同规格100t预应力钢筋，最少应分为()批检验。",[205,207,209,210],{"key":20,"text":206,"correct":22},"1",{"key":24,"text":208,"correct":29},"2",{"key":27,"text":182,"correct":22},{"key":31,"text":211,"correct":22},"4",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1126304,"预应力筋切断不得采用()切割。",[216,218,220,222],{"key":20,"text":217,"correct":22},"切断机",{"key":24,"text":219,"correct":22},"砂轮锯",{"key":27,"text":221,"correct":29},"电弧",{"key":31,"text":223,"correct":22},"乙炔―氧气",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1126305,"施工中钢筋接头受力状态不清的，应按()处理。",[228,230,232,234],{"key":20,"text":229,"correct":29},"受拉",{"key":24,"text":231,"correct":22},"受压",{"key":27,"text":233,"correct":22},"偏压",{"key":31,"text":235,"correct":22},"受剪",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1126306,"承重结构以受压为主的桥型是()。",[240,242,244,246],{"key":20,"text":241,"correct":22},"梁式桥",{"key":24,"text":243,"correct":29},"拱式桥",{"key":27,"text":245,"correct":22},"悬索桥",{"key":31,"text":247,"correct":22},"刚架桥",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1126307,"下列桥梁类型中，属于按用途分类的是（）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"石拱桥",{"key":24,"text":255,"correct":29},"人行桥",{"key":27,"text":257,"correct":22},"特长桥",{"key":31,"text":259,"correct":22},"钢架桥",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1126308,"关于预应力钢铰线张拉的说法，错误的是()。",[264,266,268,270],{"key":20,"text":265,"correct":22},"构件混凝土强度不得低于设计值的75%",{"key":24,"text":267,"correct":22},"当设计无要求时，张拉顺序可采用对称张拉",{"key":27,"text":269,"correct":22},"长20m梁直线预应力钢铰线可采用一端张拉方式",{"key":31,"text":271,"correct":29},"工作人员可站在张拉千斤顶后面随时观察张拉情况",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},1126309,"关于先张法和后张法预应力梁施工的说法，错误的是()。",[276,278,280,282],{"key":20,"text":277,"correct":22},"两者使用的预制台座不同",{"key":24,"text":279,"correct":22},"预应力张拉都需采用千斤顶",{"key":27,"text":281,"correct":29},"两者放张顺序一致",{"key":31,"text":283,"correct":22},"后张法预应力管道需压浆处理",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1126310,"预应力构件施工中属于先张法的工序是()。",[288,290,292,294],{"key":20,"text":289,"correct":29},"放张",{"key":24,"text":291,"correct":22},"预留孔道",{"key":27,"text":293,"correct":22},"预应力管道清洗",{"key":31,"text":295,"correct":22},"孔道压浆",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1126311,"在设计未规定的情况下，采用后张法施工的C50预应力混凝土T型梁强度达到()MPa时可进行预应力张拉。",[300,302,304,306],{"key":20,"text":301,"correct":22},"25",{"key":24,"text":303,"correct":22},"30",{"key":27,"text":305,"correct":22},"35",{"key":31,"text":307,"correct":29},"40",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1126312,"下列桥型中，在竖向荷载作用下，桥墩或桥台主要承受水平推力的是()。",[312,313,314,315],{"key":20,"text":247,"correct":22},{"key":24,"text":245,"correct":22},{"key":27,"text":243,"correct":29},{"key":31,"text":241,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1126313,"（2018年真题）商品混凝土的（ ）应满足混凝土的凝结速度和浇筑速度的要求。",[320,322,324,326],{"key":20,"text":321,"correct":22},"配合比",{"key":24,"text":323,"correct":29},"运输能力",{"key":27,"text":325,"correct":22},"坍落度",{"key":31,"text":327,"correct":22},"粗骨料",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},1126314,"（2018年真题）在安装墩、台模板时，其底部应与基础预埋件或钢筋连接牢固，上部应采用（ ）固定。",[332,334,336,338],{"key":20,"text":333,"correct":22},"剪刀撑",{"key":24,"text":335,"correct":22},"木方",{"key":27,"text":337,"correct":22},"点焊",{"key":31,"text":339,"correct":29},"拉杆",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1126315,"直接或间接承受汽车等荷载作用，对桥梁结构安全起保证作用的部件是（ ）。2017真题",[344,346,348,350],{"key":20,"text":345,"correct":29},"桥台基础",{"key":24,"text":347,"correct":22},"桥面沥青混凝土铺装",{"key":27,"text":349,"correct":22},"桥梁栏杆",{"key":31,"text":351,"correct":22},"桥面排水系统",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1126316,"（2019年）多孔标准跨径总长为500m的桥梁属于（）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"特大桥",{"key":24,"text":359,"correct":29},"大桥",{"key":27,"text":361,"correct":22},"中桥",{"key":31,"text":363,"correct":22},"小桥",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1126317,"（2019年）钢筋与钢板的T形连接，宜采用（）",[368,370,372,374],{"key":20,"text":369,"correct":22},"闪光对焊",{"key":24,"text":371,"correct":22},"电阻点焊",{"key":27,"text":373,"correct":29},"电弧焊",{"key":31,"text":375,"correct":22},"氯弧焊",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1126318,"（2019年）关于预应力混凝土结构模板拆除的说法，正确的是（）。",[380,382,384,386],{"key":20,"text":381,"correct":29},"侧模应在预应力张拉前拆除",{"key":24,"text":383,"correct":22},"侧模应在预应力张拉后拆除",{"key":27,"text":385,"correct":22},"模板拆除应遵循先支先拆，后支后拆的原则",{"key":31,"text":387,"correct":22},"连续梁结构的模板应从支座向跨中方向依次循环卸落",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1126319,"（2020年真题）拱桥的承重结构以受()为主",[392,394,396,398],{"key":20,"text":393,"correct":22},"拉",{"key":24,"text":395,"correct":29},"压",{"key":27,"text":397,"correct":22},"弯",{"key":31,"text":399,"correct":22},"扭",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1126320,"（2020年真题）下列措施中，可以达到消除挂篮组装非弹性变形的是()",[404,406,408,410],{"key":20,"text":405,"correct":22},"提高安全系数",{"key":24,"text":407,"correct":22},"减轻挂篮重量",{"key":27,"text":409,"correct":22},"空载试运行",{"key":31,"text":411,"correct":29},"载重试验",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},1126321,"（2020年真题）下列河床地层中，不宜使用钢板桩围堰的是()",[416,418,420,422],{"key":20,"text":417,"correct":22},"砂类土",{"key":24,"text":419,"correct":22},"碎石土",{"key":27,"text":421,"correct":29},"含有大漂石的卵石土",{"key":31,"text":423,"correct":22},"强风化岩",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},1126322,"（2020年真题）下列影响因素中，不属于设置支架施工预拱度应考虑的是()",[428,430,432,434],{"key":20,"text":429,"correct":22},"支架承受施工荷载引起的弹性变形",{"key":24,"text":431,"correct":22},"支架杆件接头和卸落设备受载后压缩产生的非弹性变形",{"key":27,"text":433,"correct":29},"支架立柱在环境温度下的线膨胀或压缩变形",{"key":31,"text":435,"correct":22},"支架基础受载后的沉降",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1126323,"基坑开挖一段后先浇筑顶板，在顶板保护下，自上而下开挖、支撑和浇筑结构内衬的施工方法称为()。",[440,442,444,446],{"key":20,"text":441,"correct":22},"明挖顺作法",{"key":24,"text":443,"correct":22},"明挖逆作法",{"key":27,"text":445,"correct":22},"盖挖顺作法",{"key":31,"text":447,"correct":29},"盖挖逆作法",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1126324,"与基坑明挖法相比，盖挖法施工最显著的优点是()。",[452,454,456,458],{"key":20,"text":453,"correct":22},"施工成本较低",{"key":24,"text":455,"correct":22},"出土速度快",{"key":27,"text":457,"correct":22},"围护变形小",{"key":31,"text":459,"correct":29},"可尽快恢复交通",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1126325,"在软土地层修建地铁车站，需要尽快恢复上部路面交通时，车站基坑施工方法宜选择()。",[464,466,468,470],{"key":20,"text":465,"correct":22},"明挖法",{"key":24,"text":467,"correct":29},"盖挖法",{"key":27,"text":469,"correct":22},"盾构法",{"key":31,"text":471,"correct":22},"浅埋暗挖法",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1126326,"采用螺旋输送机出土的是()盾构。",[476,478,480,482],{"key":20,"text":477,"correct":22},"手掘式",{"key":24,"text":479,"correct":22},"网格",{"key":27,"text":481,"correct":29},"土压平衡",{"key":31,"text":483,"correct":22},"泥水平衡",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1126327,"浅埋暗挖法中，适用于小跨度，连续使用可扩成大跨度的是()。",[488,490,492,494],{"key":20,"text":489,"correct":22},"全断面法",{"key":24,"text":491,"correct":22},"正台阶环向开挖法",{"key":27,"text":493,"correct":22},"单侧壁导坑法",{"key":31,"text":495,"correct":29},"中洞法",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},1126328,"某地铁区间隧道，位于含水量大的粉质细砂层，地面沉降控制严格，且不具备降水条件，宜采用（ ）施工。",[500,501,502,503],{"key":20,"text":471,"correct":22},{"key":24,"text":465,"correct":22},{"key":27,"text":469,"correct":29},{"key":31,"text":467,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1126329,"（2019年）矿山法施工的地铁车站不采用()结构形式。",[508,510,512,514],{"key":20,"text":509,"correct":29},"框架",{"key":24,"text":511,"correct":22},"单拱",{"key":27,"text":513,"correct":22},"双拱",{"key":31,"text":515,"correct":22},"三拱",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1126330,"（2020年真题）适用于黏性土、粉土、杂填土、黄土、砂、卵石，但对施工精度、工艺和混凝土配合比均有严格要求的隔水帷幕的施工方法是()",[520,522,524,526],{"key":20,"text":521,"correct":22},"高压喷射注浆法",{"key":24,"text":523,"correct":22},"注浆法",{"key":27,"text":525,"correct":22},"水泥土搅拌法",{"key":31,"text":527,"correct":29},"咬合式排桩",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":31,"analysis":33},1126331,"采用锁口管接头的地下连续墙的施工工序包括：①开挖沟槽，②吊放钢筋笼，③下导管，④吊放接头管，⑤拔出接头管，⑥灌注水下混凝土，⑦导墙施工。正确的地下连续墙施工顺序是()。",[532,534,536,538],{"key":20,"text":533,"correct":22},"⑤→⑦→①→④→②→③→⑥",{"key":24,"text":535,"correct":22},"①→⑦→④→②→③→⑤→⑥",{"key":27,"text":537,"correct":22},"⑦→④→①→③→②→⑥→⑤",{"key":31,"text":539,"correct":29},"⑦→①→④→②→③→⑥→⑤",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},1126332,"下列支撑形式中，不能周转使用的是()。",[544,546,548,550],{"key":20,"text":545,"correct":29},"现浇钢筋混凝土支撑",{"key":24,"text":547,"correct":22},"钢管支撑",{"key":27,"text":549,"correct":22},"H型钢支撑",{"key":31,"text":551,"correct":22},"工字钢支撑",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1126333,"采用明沟排水，当沟槽开挖接近地下水位时，施工顺序为()。",[556,558,560,562],{"key":20,"text":557,"correct":29},"挖集水井→安装水泵排水→挖临时排水沟→挖排水沟外侧的土→加深排水沟",{"key":24,"text":559,"correct":22},"挖临时排水沟→挖排水沟外侧的土→加深排水沟→安装水泵排水→挖集水井",{"key":27,"text":561,"correct":22},"挖临时排水沟→安装水泵排水→挖集水井→挖排水沟外侧的土→加深排水沟",{"key":31,"text":563,"correct":22},"挖集水井→挖临时排水沟→挖排水沟外侧的土→安装水泵排水→加深排水沟",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1126334,"可采用冲击式打桩机施工的基坑围护结构是（）。",[568,570,572,574],{"key":20,"text":569,"correct":29},"钢板桩",{"key":24,"text":571,"correct":22},"钻孔灌注桩",{"key":27,"text":573,"correct":22},"深层搅拌桩",{"key":31,"text":575,"correct":22},"地下连续墙",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":31,"analysis":33},1126335,"下列地下连续墙的接头形式中，属于刚性接头的是（）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"锁口管接头",{"key":24,"text":583,"correct":22},"波纹管接头",{"key":27,"text":585,"correct":22},"楔形接头",{"key":31,"text":587,"correct":29},"钢筋承插式接头",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},1126336,"依靠自重维持稳定，一般不设置支撑，又可用来形成止水帷幕的基坑围护结构是()。",[592,593,595,596],{"key":20,"text":569,"correct":22},{"key":24,"text":594,"correct":22},"SMW工法桩",{"key":27,"text":575,"correct":22},{"key":31,"text":597,"correct":29},"深层搅拌桩挡墙",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":27,"analysis":33},1126337,"（2018年真题）下列基坑放坡要求中，说法错误的是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"放坡应以控制分级坡高和坡度为主",{"key":24,"text":605,"correct":22},"放坡设计与施工时应考虑雨水的不利影响",{"key":27,"text":607,"correct":29},"上级放坡坡度宜缓于下坡放坡坡度",{"key":31,"text":609,"correct":22},"分级放坡时，宜设置分级过度平台",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]