[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,32,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,368,380,392,404,416,428,440,450,462,474,486,498,510,522,534,546,558,570,578,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1126076,1,"单选题","关于项目部职业健康安全管理的说法，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","策划本项目职业卫生设施可从职工工作用的饮水设施开始考虑",false,{"key":24,"text":25,"correct":26},"B","项目部职业健康安全管理方案中的具体措施可与劳动保护、职业病防治相结合",true,{"key":28,"text":29,"correct":22},"C","策划本项目职业卫生设施可从更衣室或存衣箱，工作服洗涤、干燥、消毒设备开始考虑",{"key":31,"text":32,"correct":22},"D","策划本项目职业卫生设施可从食物的加热设备开始考虑","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1126077,"下列选项中，不属于工程竣工报告主要内容的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工组织设计文件",{"key":24,"text":41,"correct":22},"工程施工质量检查结果",{"key":28,"text":43,"correct":26},"竣工图",{"key":31,"text":45,"correct":22},"符合法律法规及工程建设强制性标准情况",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1126078,"某市政工程估价为5千万元，招标人可要求每个投标人提供保证金最高额为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"100 万元",{"key":24,"text":53,"correct":26},"50 万元",{"key":28,"text":55,"correct":22},"60 万元",{"key":31,"text":57,"correct":22},"40 万元",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1126079,"在国内工程总承包中，往往同时存在（ ）等方面风险。",[62,64,66,68],{"key":20,"text":63,"correct":22},"经济、技术、商务",{"key":24,"text":65,"correct":26},"经济、技术、公共关系",{"key":28,"text":67,"correct":22},"政治、技术、法律",{"key":31,"text":69,"correct":22},"政治、经济、法律",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1126080,"施工项目部实现有效的全过程成本管理的保证和基础是建立健全（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"统计制度",{"key":24,"text":77,"correct":26},"责任制度",{"key":28,"text":79,"correct":22},"考核制度",{"key":31,"text":81,"correct":22},"会计制度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1126081,"开挖深度为16m的人工挖孔桩工程（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"不需要编制专项方案也不需要专家论证",{"key":24,"text":89,"correct":22},"不需要编制专项方案但需要专家论证",{"key":28,"text":91,"correct":22},"要编制专项方案，但不需要专家论证",{"key":31,"text":93,"correct":26},"要编制专项方案并需要专家论证",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1126082,"施工现场应按照现行国家标准制定降噪措施，并应对施工现场的噪声值进行（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"记录、分析",{"key":24,"text":101,"correct":22},"记录、统计",{"key":28,"text":103,"correct":22},"记录、研究",{"key":31,"text":105,"correct":26},"监测、记录",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1126083,"按质量计划中关于工程分包和物资采购的规定，经招标程序选择并评价分包方和供应商，保存评价记录；其执行人为项目（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"项目负责人",{"key":24,"text":113,"correct":22},"生产负责人",{"key":28,"text":115,"correct":22},"技术负责人",{"key":31,"text":117,"correct":22},"质量负责人",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1126084,"用作基层的无机结合料的控制指标之一是（ ）无侧限抗压强度。",[122,124,126,128],{"key":20,"text":123,"correct":22},"3d",{"key":24,"text":125,"correct":26},"7d",{"key":28,"text":127,"correct":22},"14d",{"key":31,"text":129,"correct":22},"28d",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1126085,"压浆过程中及压浆后48h内，结构混凝土的温度不得低于（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"3℃",{"key":24,"text":137,"correct":22},"4℃",{"key":28,"text":139,"correct":26},"5℃",{"key":31,"text":141,"correct":22},"6℃",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1126086,"在有缝钢管上焊接分支管时，分支管外壁与其他焊缝中心的距离，应大于分支管外径，且不得小于（）mm。",[146,148,150,152],{"key":20,"text":147,"correct":26},"70",{"key":24,"text":149,"correct":22},"80",{"key":28,"text":151,"correct":22},"90",{"key":31,"text":153,"correct":22},"100",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1126087,"施工机械、运输车辆的最外着力点与施工工作井边距离不得小于（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"1．0m",{"key":24,"text":161,"correct":22},"1．2m",{"key":28,"text":163,"correct":26},"1．5m",{"key":31,"text":165,"correct":22},"1．8m",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1126088,"施工技术资料应有（ ）签署的意见或监理单位对认证项目的认证记录。",[170,172,174,176],{"key":20,"text":171,"correct":22},"项目部",{"key":24,"text":173,"correct":22},"设计单位",{"key":28,"text":175,"correct":26},"建设单位",{"key":31,"text":177,"correct":22},"质量监督部门",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1126089,"投标人不需响应招标文件对投标人资格条件的要求是( )。",[182,184,186,188],{"key":20,"text":183,"correct":26},"所有制",{"key":24,"text":185,"correct":22},"项目负责人资格",{"key":28,"text":187,"correct":22},"财务状况",{"key":31,"text":189,"correct":22},"技术能力",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1126090,"以下选项中属于合同风险分散和转移的措施是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"增设风险合同条款",{"key":24,"text":197,"correct":22},"加强索赔管理",{"key":28,"text":199,"correct":26},"向保险公司投保",{"key":31,"text":201,"correct":22},"增设保值条款",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1126091,"在施工成本目标控制中，最有效的方法之一是按施工图预算实行（）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"量入为出",{"key":24,"text":209,"correct":22},"两算对比",{"key":28,"text":211,"correct":22},"成本核算",{"key":31,"text":213,"correct":22},"成本分析",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1126092,"工程施工阶段设置道路、组织排水、搭建临时设施、堆放物料和停放机械设备，应当按照（）布置。",[218,220,222,224],{"key":20,"text":219,"correct":22},"业主指定",{"key":24,"text":221,"correct":22},"现场需要",{"key":28,"text":223,"correct":22},"监理指定",{"key":31,"text":225,"correct":26},"施工总平面图",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1126093,"月、旬(或周)施工进度计划是（ ）性计划。",[230,232,234,236],{"key":20,"text":231,"correct":22},"控制",{"key":24,"text":233,"correct":22},"支撑",{"key":28,"text":235,"correct":26},"实施",{"key":31,"text":237,"correct":22},"阶段",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1126094,"关于特殊过程质量控制的说法，正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"对工程施工项目质量计划规定的特殊过程，应设置分部质量控制点",{"key":24,"text":245,"correct":26},"除应执行一般过程控制的规定外，还应由专业技术人员编制专门的作业指导书",{"key":28,"text":247,"correct":22},"缺少经验的工序应安排试验，编制成作业指导书，按需要进行首件(段)验收",{"key":31,"text":249,"correct":22},"编制的作业指导书，应经监理工程师审批后执行",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1126095,"关于城镇道路路基雨期施工的说法，正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"集中力量，全面开挖，快速施工",{"key":24,"text":257,"correct":26},"坚持当天挖完、压完，不留后患",{"key":28,"text":259,"correct":22},"填土路基应按2％～4％以上的横坡整平压实",{"key":31,"text":261,"correct":22},"因雨翻浆地段，用重型压路机重新压实",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1126096,"大体积混凝土养护，不仅要满足其强度增长需要，还应通过（ ）控制，防止其开裂。",[266,268,270,272],{"key":20,"text":267,"correct":26},"温度",{"key":24,"text":269,"correct":22},"应变",{"key":28,"text":271,"correct":22},"湿度",{"key":31,"text":273,"correct":22},"应力",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1126097,"关于柔性管道回填的说法，错误的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"柔性管道的沟槽回填质量控制是柔性管道工程施工质量控制的关键",{"key":24,"text":281,"correct":22},"现场试验段主要用以确定压实机械和施工参数",{"key":28,"text":283,"correct":26},"在设计的管基有效支承角范围必须用中粗砂、黏土填充密实，与管壁紧密接触",{"key":31,"text":285,"correct":22},"管道回填从管底基础部位开始到管顶以上500mm范围内，必须采用人工回填",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1126098,"同一暗挖隧道相对开挖(非爆破方法)的两开挖面距离为（）倍洞跨且不小于10m时，一端应停止掘进，并保持开挖面稳定。",[290,292,294,296],{"key":20,"text":291,"correct":22},"1．5",{"key":24,"text":293,"correct":26},"2．0",{"key":28,"text":295,"correct":22},"2．5",{"key":31,"text":297,"correct":22},"3．0",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1126099,"钻孔灌注桩施工中施工现场附近有电力架空线路时，当电压为1-10kV钻机的安全距离为（ ）m。",[302,304,306,308],{"key":20,"text":303,"correct":22},"2",{"key":24,"text":305,"correct":22},"4",{"key":28,"text":307,"correct":26},"6",{"key":31,"text":309,"correct":22},"8",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1126100,"关于桥梁工程施工质量验收要求，错误的是（）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"工程的观感质量应由验收人员现场检查，并应共同确认",{"key":24,"text":317,"correct":22},"检验批的质量应按主控项目和一般项目进行验收",{"key":28,"text":319,"correct":22},"隐蔽工程在隐蔽前应由施工单位通知监理单位进行验收，并应形成验收文件",{"key":31,"text":321,"correct":26},"对涉及结构安全和使用功能的分部工程应进行100％检测",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1126101,"为避免孔口高程误差，应认真校核原始水准点和各孔口绝对高程，每根桩开孔前（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"实行签证手续",{"key":24,"text":329,"correct":22},"测量钻机平台高程",{"key":28,"text":331,"correct":26},"复测桩位孔口高程",{"key":31,"text":333,"correct":22},"测量护筒上口高程",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1126102,"关于工作井土方开挖安全控制要点的说法，错误的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"邻近各类管线、建(构)筑物时，开挖前应对管线、建(构)筑物采取加固措施",{"key":24,"text":341,"correct":26},"采用先开挖后支护方式时，随开挖随支护，随支护随开挖，均衡施工",{"key":28,"text":343,"correct":22},"吊装出土时，土方容器下降落稳后，施工人员方可靠近作业",{"key":31,"text":345,"correct":22},"发现坍塌征兆时，必须停止作业，施工人员撤至安全地带",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1126103,"劳务分包应实施实名制管理，其执行主体是（ ）和项目部。",[350,352,354,356],{"key":20,"text":351,"correct":22},"发包方",{"key":24,"text":353,"correct":26},"承包方",{"key":28,"text":355,"correct":22},"分包方",{"key":31,"text":357,"correct":22},"监理方",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1126104,"施工成本目标控制主要依据之一是（ ）。",[362,364,365,367],{"key":20,"text":363,"correct":22},"成本目标",{"key":24,"text":211,"correct":22},{"key":28,"text":366,"correct":26},"成本计划",{"key":31,"text":213,"correct":22},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1126105,"钻孔灌注桩灌注水下混凝土时，导管底端至孔底的距离应为（）m。",[372,374,376,378],{"key":20,"text":373,"correct":22},"0．6～0．7",{"key":24,"text":375,"correct":22},"0．5～0．6",{"key":28,"text":377,"correct":26},"0．3～0．5",{"key":31,"text":379,"correct":22},"0．2～0．3",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1126106,"隧道内应加强通风，在有瓦斯的隧道内进行爆破作业必须遵守现行（）的有关规定。",[384,386,388,390],{"key":20,"text":385,"correct":22},"地下铁道工程施工及验收规范",{"key":24,"text":387,"correct":22},"公路桥涵施工技术规范",{"key":28,"text":389,"correct":26},"煤矿安全规程",{"key":31,"text":391,"correct":22},"城镇燃气输配工程施工及验收规范",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},1126107,"后张法预应力筋张拉后，孔道（ ）压浆。",[396,398,400,402],{"key":20,"text":397,"correct":22},"宜尽早",{"key":24,"text":399,"correct":22},"不急于",{"key":28,"text":401,"correct":26},"应及时",{"key":31,"text":403,"correct":22},"暂缓",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1126108,"相邻桩之间净距小于5m时，应待邻桩混凝土强度达到（）后，方可进行本桩钻孔。",[408,410,412,414],{"key":20,"text":409,"correct":22},"3MPa",{"key":24,"text":411,"correct":26},"5MPa",{"key":28,"text":413,"correct":22},"8MPa",{"key":31,"text":415,"correct":22},"10MPa",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1126109,"（2011年真题）关于打入桩施工技术要求的说法，错误的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"水泥混凝土桩要达到100%设计强度并具有28d龄期",{"key":24,"text":423,"correct":22},"在桩的打入过程中，应始终保持锤、桩帽和桩身在同一轴线上",{"key":28,"text":425,"correct":26},"打密集群桩，一般是由前排向后排打",{"key":31,"text":427,"correct":22},"打桩时以控制桩尖设计标高为主",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1126110,"（2013年真题）关于静力压桩法施工混凝土预制桩的说法，错误的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"桩顶不易破坏",{"key":24,"text":435,"correct":22},"施工时无冲击力",{"key":28,"text":437,"correct":22},"沉桩精度较高",{"key":31,"text":439,"correct":26},"沉桩过程不产生挤土效应",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1126111,"（2012年真题）钻孔灌注桩灌注水下混凝土，在桩顶设计标高以上加灌一定高度，其作用是（ ）。 A、避免导管漏浆 B、防止桩身夹泥断桩 C、保证桩顶混凝土质量 D、放慢混凝土灌注速度",[444,445,446,447,448],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":449,"text":449,"correct":22},"E",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1126112,"（2013年真题）关于梁板吊放技术要求的说法，错误的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"捆绑吊点距梁端悬出的长度不得大于设计规定",{"key":24,"text":457,"correct":26},"采用千斤绳吊放混凝土T型梁时，可采用让两个翼板受力的方法",{"key":28,"text":459,"correct":22},"钢梁经过验算不超过容许应力时，可采用人字千斤绳起吊",{"key":31,"text":461,"correct":22},"各种起吊设备在每次组装后，初次使用时，应先进行试吊",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1126113,"（2011年真题）设置现浇预应力混凝土连续梁支架预拱度时，不考虑的变形值是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"卸架后上部构造本身及活载一半所产生的竖向挠度",{"key":24,"text":469,"correct":22},"支架在荷载作用下的弹性压缩和非弹性压缩",{"key":28,"text":471,"correct":26},"支架基底在荷载作用下的弹性沉降",{"key":31,"text":473,"correct":22},"由混凝土收缩及温度变化而引起的挠度",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1126114,"（2015年真题）采用悬臂浇筑法施工多跨预应力混凝土连续梁时，正确的浇筑顺序是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"0号块→主梁节段→边跨合龙段→中跨合龙段",{"key":24,"text":481,"correct":22},"0号块→主梁节段→中跨合龙段→边跨合龙段",{"key":28,"text":483,"correct":22},"主梁节段→0号块→边跨合龙段→中跨合龙段",{"key":31,"text":485,"correct":22},"主梁节段→0号块→中跨合龙段→边跨合龙段",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1126115,"（2014年真题）关于承重模板支架搭设的说法，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"脚手架宜利用支架搭设方法",{"key":24,"text":493,"correct":26},"支架底部应有良好的排水措施",{"key":28,"text":495,"correct":22},"支架搭设完毕后，即可投入使用",{"key":31,"text":497,"correct":22},"地基承载力不影响支架的搭设",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},1126116,"（2013年真题）关于箱涵顶进施工的做法，错误的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"由上向下开挖",{"key":24,"text":505,"correct":22},"不超前挖土",{"key":28,"text":507,"correct":26},"逆坡挖土",{"key":31,"text":509,"correct":22},"严禁扰动基底土壤",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1126118,"（2012年真题）基坑边坡挂网喷射混凝土施工完成后，应喷水养护，一般养护不少于（ ）d。",[514,516,518,520],{"key":20,"text":515,"correct":22},"3",{"key":24,"text":517,"correct":22},"5",{"key":28,"text":519,"correct":26},"7",{"key":31,"text":521,"correct":22},"14",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},1126119,"（2013年真题）关于先张法和后张法预应力梁施工的说法，错误的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"两者使用的预制台座不同",{"key":24,"text":529,"correct":22},"预应力张拉都需采用千斤顶",{"key":28,"text":531,"correct":26},"两者放张顺序一致",{"key":31,"text":533,"correct":22},"后张法预应力管道需压浆处理",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1126120,"（2016年真题）关于预应力钢铰线张拉的说法，错误的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"长20m梁直线预应力钢绞线可采用一端张拉方式",{"key":24,"text":541,"correct":22},"构件混凝土强度不得低于设计值的75％",{"key":28,"text":543,"correct":22},"当设计无要求时，张拉顺序可采用对称张拉",{"key":31,"text":545,"correct":26},"工作人员可站在张拉千斤顶后面随时观察张拉情况",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},1126121,"（2016年真题）下列桥型中，在竖向荷载作用下，桥墩或桥台主要承受水平推力的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"悬索桥",{"key":24,"text":553,"correct":22},"梁式桥",{"key":28,"text":555,"correct":26},"拱式桥",{"key":31,"text":557,"correct":22},"刚架桥",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},1126124,"（2017年真题）直接或间接承受汽车等荷载作用，对桥梁结构安全起保证作用的部件是（ ）",[562,564,566,568],{"key":20,"text":563,"correct":26},"桥台基础",{"key":24,"text":565,"correct":22},"桥面沥青混凝土铺装",{"key":28,"text":567,"correct":22},"桥梁栏杆",{"key":31,"text":569,"correct":22},"桥面排水系统",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1126125,"（2015年真题）承重结构以受压为主的桥型是（ ）。",[574,575,576,577],{"key":20,"text":553,"correct":22},{"key":24,"text":555,"correct":26},{"key":28,"text":551,"correct":22},{"key":31,"text":557,"correct":22},{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},1126126,"（2014年真题）下列桥梁类型中，属于按用途分类的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"石拱桥",{"key":24,"text":585,"correct":26},"人行桥",{"key":28,"text":587,"correct":22},"特长桥",{"key":31,"text":557,"correct":22},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},1126127,"（2016年真题）钢筋的级别、种类和直径应按设计要求选用，当需要代换时，应由（ ）单位作变更设计。",[593,595,597,599],{"key":20,"text":594,"correct":22},"施工",{"key":24,"text":596,"correct":22},"建设",{"key":28,"text":598,"correct":22},"监理",{"key":31,"text":600,"correct":26},"原设计",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":20,"analysis":33},1126128,"（2015年真题）施工中钢筋接头受力状态不清的，应按（ ）处理。",[605,607,609,611],{"key":20,"text":606,"correct":26},"受拉",{"key":24,"text":608,"correct":22},"受压",{"key":28,"text":610,"correct":22},"偏压",{"key":31,"text":612,"correct":22},"受剪",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]