[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,31,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,426,438,450,462,474,486,498,510,518,529,540,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1126026,1,"单选题","施工成本目标控制的原则之一是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","实用性原则",false,{"key":24,"text":25,"correct":22},"B","开拓性原则",{"key":27,"text":28,"correct":22},"C","灵活性原则",{"key":30,"text":31,"correct":32},"D","全员成本原则",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1126027,"施工单位应当在危险性较大的分部分项工程（）编制专项方案",[38,40,42,44],{"key":20,"text":39,"correct":22},"确认前",{"key":24,"text":41,"correct":32},"施工前",{"key":27,"text":43,"correct":22},"确认后",{"key":30,"text":45,"correct":22},"测量后",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1126028,"下列脚手架工程专项施工方案必须进行专家论证的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"高度40m落地式钢管脚手架",{"key":24,"text":53,"correct":22},"提升高度80m附着式整体提升脚手架",{"key":27,"text":55,"correct":22},"提升高度60m附着式分片提升脚手架",{"key":30,"text":57,"correct":32},"架体高度20m及以上悬挑式脚手架",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1126029,"实施每季度实名制管理检查，对检查情况打分，年底综合评定的责任者是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"劳务企业",{"key":24,"text":65,"correct":22},"业主单位",{"key":27,"text":67,"correct":22},"分包单位",{"key":30,"text":69,"correct":32},"法人单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1126030,"应根据风力和大气湿度的具体情况，进行土方回填、转运作业，沿线应用（）降尘。",[74,76,78,80],{"key":20,"text":75,"correct":32},"洒水车",{"key":24,"text":77,"correct":22},"扫地车",{"key":27,"text":79,"correct":22},"湿麻袋",{"key":30,"text":81,"correct":22},"湿草包",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1126031,"根据国家有关规定，应当设置明显的安全警示标志的地点是（）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"施工现场入口处",{"key":24,"text":89,"correct":22},"砂石存放区",{"key":27,"text":91,"correct":22},"水泥仓库入口处",{"key":30,"text":93,"correct":22},"生活办公区",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1126032,"季度施工进度计划是在年度施工进度计划的基础上，按照（ ）施工原则编制。",[98,100,102,104],{"key":20,"text":99,"correct":22},"分部",{"key":24,"text":101,"correct":22},"分项",{"key":27,"text":103,"correct":22},"顺序",{"key":30,"text":105,"correct":32},"均衡",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1126033,"分包单位施工进度计划应是承包单位施工总进度计划的（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"基础",{"key":24,"text":113,"correct":32},"控制范围",{"key":27,"text":115,"correct":22},"依据",{"key":30,"text":117,"correct":22},"组成部分",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1126034,"项目进度控制总目标可按承包的专业或施工阶段分解为（）分目标。",[122,124,126,128],{"key":20,"text":123,"correct":22},"交工",{"key":24,"text":125,"correct":22},"时间",{"key":27,"text":127,"correct":32},"阶段",{"key":30,"text":129,"correct":22},"专业",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1126035,"项目经理部应及时进行施工进度控制总结的时间节点为在施工（ ）后。",[134,136,138,140],{"key":20,"text":135,"correct":32},"进度计划完成",{"key":24,"text":137,"correct":22},"分项工程完成",{"key":27,"text":139,"correct":22},"分部工程完成",{"key":30,"text":141,"correct":22},"分部工程进度计划完成",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1126036,"进行不合格让步接收时，项目部应向（）提出书面让步接收申请。",[146,148,150,152],{"key":20,"text":147,"correct":22},"质监站",{"key":24,"text":149,"correct":22},"监理",{"key":27,"text":151,"correct":32},"发包方",{"key":30,"text":153,"correct":22},"接管方",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1126037,"施工准备阶段质量管理的内容之一图纸会审，应由项目（ ）主持。",[158,160,162,164],{"key":20,"text":159,"correct":22},"质量负责人",{"key":24,"text":161,"correct":32},"技术负责人",{"key":27,"text":163,"correct":22},"负责人",{"key":30,"text":165,"correct":22},"生产负责人",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1126038,"施工过程质量控制中，不包括（）。",[170,172,174,176],{"key":20,"text":171,"correct":32},"质量计划制定",{"key":24,"text":173,"correct":22},"分项工程(工序)控制",{"key":27,"text":175,"correct":22},"特殊过程控制",{"key":30,"text":177,"correct":22},"不合格产品控制",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1126039,"道路基层用水泥土宜采用（ ）水泥稳定。",[182,184,186,188],{"key":20,"text":183,"correct":22},"高强",{"key":24,"text":185,"correct":32},"硅酸盐",{"key":27,"text":187,"correct":22},"早强",{"key":30,"text":189,"correct":22},"钢渣",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},1126040,"常温季节，石灰土基层需洒水养护（ ），养护期应封闭交通。",[194,196,198,200],{"key":20,"text":195,"correct":22},"28d",{"key":24,"text":197,"correct":22},"21d",{"key":27,"text":199,"correct":22},"14d",{"key":30,"text":201,"correct":32},"直至上层结构施工为止",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1126041,"人工施工水泥混凝土路面时，振动器的振动顺序为（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"平板式振捣器→插入式振捣器→振动梁(轻)→振动梁(重)→无缝钢管滚杆提浆赶浆",{"key":24,"text":209,"correct":22},"平板式振捣器→插入式振捣器→振动梁(重)→振动梁(轻)→无缝钢管滚杆提浆赶浆",{"key":27,"text":211,"correct":22},"插入式振捣器→平板式振捣器→振动梁(轻)→振动梁(重)→无缝钢管滚杆提浆赶浆",{"key":30,"text":213,"correct":32},"插入式振捣器→平板式振捣器→振动梁(重)→振动梁(轻)→无缝钢管滚杆提浆赶浆",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1126042,"为了防止钢筋骨架上浮，当灌注的混凝土面距钢筋骨架底部1m左右时，应（）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"降低混凝土灌注速度",{"key":24,"text":221,"correct":22},"改善混凝土流动性能",{"key":27,"text":223,"correct":22},"加快混凝土灌注速度",{"key":30,"text":225,"correct":22},"在首批混凝土中掺入缓凝剂",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1126043,"预应力筋张拉前应根据设计要求对孔道的（）进行实测。",[230,232,234,236],{"key":20,"text":231,"correct":32},"摩阻损失",{"key":24,"text":233,"correct":22},"直径",{"key":27,"text":235,"correct":22},"摩阻力",{"key":30,"text":237,"correct":22},"长度",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},1126044,"钻孔灌注桩初灌水下混凝土时，导管首次埋入混凝土的深度不应小于（）m。",[242,244,246,248],{"key":20,"text":243,"correct":22},"0．7",{"key":24,"text":245,"correct":22},"0．8",{"key":27,"text":247,"correct":22},"0．9",{"key":30,"text":249,"correct":32},"1．0",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1126045,"钻孔灌注桩单桩混凝土灌注时间宜控制在（）内。",[254,256,258,260],{"key":20,"text":255,"correct":22},"1．2倍混凝土初凝时间",{"key":24,"text":257,"correct":32},"1．5倍混凝土初凝时间",{"key":27,"text":259,"correct":22},"1．2倍混凝土终凝时间",{"key":30,"text":261,"correct":22},"1．5倍混凝土终凝时间",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1126046,"大体积混凝土构筑物拆模时，混凝土表面与中心、与外界气温的温差不超过（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"10℃",{"key":24,"text":269,"correct":32},"20℃",{"key":27,"text":271,"correct":22},"25℃",{"key":30,"text":273,"correct":22},"30℃",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1126047,"在燃气管道上开孔时无法满足管道开孔边缘与管道焊缝的间距要求时，应对以开孔中心为圆心、1．5倍开孔直径为半径的圆中所包容的全部焊缝进行（）检测。",[278,280,282,284],{"key":20,"text":279,"correct":22},"抽样",{"key":24,"text":281,"correct":32},"100％射线照相",{"key":27,"text":283,"correct":22},"试验",{"key":30,"text":285,"correct":22},"100％超声波",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1126048,"城镇供热管网施工质量检查与验收中无损检测数量当设计未规定时，其他无损探伤检测数量应按《》执行，且每个焊工不应少于一个焊缝。",[290,292,294,296],{"key":20,"text":291,"correct":22},"《城镇供热管网设计规范》CJJ 34—2010",{"key":24,"text":293,"correct":32},"《城镇供热管网工程施工及验收规范》CJJ 28—2014",{"key":27,"text":295,"correct":22},"地方性法规",{"key":30,"text":297,"correct":22},"北京市法规",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1126049,"柔性管道回填时间宜在一昼夜中（）气温时段。",[302,304,306,308],{"key":20,"text":303,"correct":22},"平均",{"key":24,"text":305,"correct":22},"最高",{"key":27,"text":307,"correct":32},"最低",{"key":30,"text":309,"correct":22},"管材要求的",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1126050,"施工工作井不得设在低洼处，井口应比周围地面高（）以上。",[314,316,318,320],{"key":20,"text":315,"correct":22},"0．2m",{"key":24,"text":317,"correct":32},"0．3m",{"key":27,"text":319,"correct":22},"0．4m",{"key":30,"text":321,"correct":22},"0．5m",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},1126051,"施工工作井井口（）范围内不得堆放材料。",[326,328,330,332],{"key":20,"text":327,"correct":22},"1．0m",{"key":24,"text":329,"correct":22},"1．5m",{"key":27,"text":331,"correct":32},"2．0m",{"key":30,"text":333,"correct":22},"2．5m",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1126052,"喷锚暗挖法二次衬砌应在（ ）后施工。",[338,340,342,344],{"key":20,"text":339,"correct":32},"初期支护变形稳定",{"key":24,"text":341,"correct":22},"地层变形稳定",{"key":27,"text":343,"correct":22},"隧道贯通",{"key":30,"text":345,"correct":22},"防水层施工完成",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},1126053,"关于应对基坑坍塌、淹埋事故的说法，正确的是（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早组织抢救仪器、设备",{"key":24,"text":353,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早组织抢险",{"key":27,"text":355,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早进行应急演练",{"key":30,"text":357,"correct":32},"及早发现坍塌、淹埋事故的征兆，及早组织施工人员撤离现场",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1126054,"地下水对基坑的危害与土质密切相关，当基坑处于（ ）地层时，在地下水作用下，容易造成坡面渗水、土粒流失、流沙，进而引起基坑坍塌。",[362,364,366,368],{"key":20,"text":363,"correct":22},"黏性土",{"key":24,"text":365,"correct":32},"砂土或粉土",{"key":27,"text":367,"correct":22},"弱风化岩层",{"key":30,"text":369,"correct":22},"卵砾石层",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1126055,"钻孔灌注桩施工用水上作业平台的台面高程，应比施工期间最高水位高（ ）以上。",[374,376,378,380],{"key":20,"text":375,"correct":32},"700mm",{"key":24,"text":377,"correct":22},"650mm",{"key":27,"text":379,"correct":22},"600mm",{"key":30,"text":381,"correct":22},"550mm",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":30,"analysis":33},1126056,"预制混凝土桩起吊时的强度应符合设计要求，设计无要求时，应达到设计强度的（ ）以上。",[386,388,390,392],{"key":20,"text":387,"correct":22},"90％",{"key":24,"text":389,"correct":22},"85％",{"key":27,"text":391,"correct":22},"80％",{"key":30,"text":393,"correct":32},"75％",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1126057,"竣工验收前建设单位应请（ ）对施工技术资料进行预验收。",[398,400,402,404],{"key":20,"text":399,"correct":22},"城建主管部门",{"key":24,"text":401,"correct":32},"当地城建档案部门",{"key":27,"text":403,"correct":22},"监理单位",{"key":30,"text":405,"correct":22},"质量监督部门",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1126058,"建设单位必须在竣工验收（）个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的工程质量监督机构。",[410,412,414,416],{"key":20,"text":411,"correct":22},"15",{"key":24,"text":413,"correct":22},"10",{"key":27,"text":415,"correct":32},"7",{"key":30,"text":417,"correct":22},"5",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":30,"analysis":33},1126059,"工程质量监督机构，应在竣工验收之日起（）个工作日内，向备案机关提交工程质量监督报告。",[422,423,424,425],{"key":20,"text":411,"correct":22},{"key":24,"text":413,"correct":22},{"key":27,"text":415,"correct":22},{"key":30,"text":417,"correct":32},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},1126060,"按《建设工程文件归档规范》GB／T50328--2014要求，建设单位应当在工程竣工验收后（）内，向城建档案馆报送一套符合规定的建设工程档案。",[430,432,434,436],{"key":20,"text":431,"correct":22},"15天",{"key":24,"text":433,"correct":22},"1个月",{"key":27,"text":435,"correct":22},"2个月",{"key":30,"text":437,"correct":32},"3个月",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1126061,"根据《必须招标的工程项目规定》 (中华人民共和国国家发展改革委员会令第16号) ，从2018 年6月1日起凡项目施工单项合同估算大于( )万元的必须进行招标。",[442,444,446,448],{"key":20,"text":443,"correct":32},"400",{"key":24,"text":445,"correct":22},"300",{"key":27,"text":447,"correct":22},"200",{"key":30,"text":449,"correct":22},"100",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1126062,"有效控制工程造价就是要做到( )。",[454,456,458,460],{"key":20,"text":455,"correct":32},"投资估算>设计概算>施工图预算>竣工结算",{"key":24,"text":457,"correct":22},"设计概算>投资估算>施工图预算>竣工结算",{"key":27,"text":459,"correct":22},"竣工结算>施工图预算>设计概算>投资估算",{"key":30,"text":461,"correct":22},"投资估算>施工图预算>设计概算>竣工结算",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},1126063,"施工项目合同变更、转让、终止和解除，应依（）规定进行。",[466,468,470,472],{"key":20,"text":467,"correct":22},"招标投标法",{"key":24,"text":469,"correct":22},"建筑法",{"key":27,"text":471,"correct":32},"合同法",{"key":30,"text":473,"correct":22},"劳动法",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1126064,"施工项目管理的核心是施工（ ）管理。",[478,480,482,484],{"key":20,"text":479,"correct":22},"质量",{"key":24,"text":481,"correct":22},"安全",{"key":27,"text":483,"correct":32},"成本",{"key":30,"text":485,"correct":22},"工期",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},1126065,"市政公用工程施工组织设计应经（）批准。",[490,492,494,496],{"key":20,"text":491,"correct":22},"项目经理",{"key":24,"text":493,"correct":22},"监理工程师",{"key":27,"text":495,"correct":32},"总承包单位技术负责人",{"key":30,"text":497,"correct":22},"项目技术负责人",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1126066,"不属于施工现场管理内容的是（）。",[502,504,506,508],{"key":20,"text":503,"correct":32},"维持社会交通秩序",{"key":24,"text":505,"correct":22},"施工现场封闭管理",{"key":27,"text":507,"correct":22},"施工现场的平面布置",{"key":30,"text":509,"correct":22},"施工现场场地与道路",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1126067,"项目进度控制总目标可按单位工程分解为（）分目标。",[514,515,516,517],{"key":20,"text":123,"correct":32},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":22},{"key":30,"text":129,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1126068,"施工项目质量保证计划应体现从资源投入到工程质量最终检验试验的（ ）控制。",[522,524,526,527],{"key":20,"text":523,"correct":32},"全过程",{"key":24,"text":525,"correct":22},"质量目标",{"key":27,"text":479,"correct":22},{"key":30,"text":528,"correct":22},"过程",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":30,"analysis":33},1126069,"水泥贮存期在（ ）内，不一定要进行性能试验。",[533,535,537,539],{"key":20,"text":534,"correct":22},"6个月",{"key":24,"text":536,"correct":22},"5个月",{"key":27,"text":538,"correct":22},"4个月",{"key":30,"text":437,"correct":32},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":30,"analysis":33},1126070,"预应力张拉应由（）主持。",[544,546,548,550],{"key":20,"text":545,"correct":22},"操作班长",{"key":24,"text":547,"correct":22},"施工员",{"key":27,"text":549,"correct":22},"技术员",{"key":30,"text":497,"correct":32},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":30,"analysis":33},1126071,"二次衬砌仰拱混凝土强度达到（）后人员方可通行，达到设计文件规定强度的（）后车辆方可通行（）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"10MPa;100%",{"key":24,"text":558,"correct":22},"10MPa;90%",{"key":27,"text":560,"correct":22},"5MPa;90%",{"key":30,"text":562,"correct":32},"5MPa;100%",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1126072,"压力试验用压力表的量程应为试验压力的（ ）倍。",[567,569,571,573],{"key":20,"text":568,"correct":22},"1．1～1．3",{"key":24,"text":570,"correct":22},"1．3～1．5",{"key":27,"text":572,"correct":32},"1．5～2",{"key":30,"text":574,"correct":22},"2～2．5",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},1126073,"施工现场安全管理体系不是（）必不可少的依据。",[579,581,583,585],{"key":20,"text":580,"correct":32},"准确识别工程重大危险源和不利环境因素",{"key":24,"text":582,"correct":22},"实现安全文明施工",{"key":27,"text":584,"correct":22},"评价安保体系、实现持续改进",{"key":30,"text":586,"correct":22},"事故预防",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},1126074,"放坡开挖基坑时，需要根据土的分类、力学指标和开挖深度确定沟槽的（）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"开挖方法",{"key":24,"text":594,"correct":22},"边坡防护措施",{"key":27,"text":596,"correct":32},"边坡坡度",{"key":30,"text":598,"correct":22},"开挖机具",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":24,"analysis":33},1126075,"加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置，（）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"码放高度不得超过2m；码放层数不宜超过2层",{"key":24,"text":606,"correct":32},"码放高度不得超过2m；码放层数不宜超过3层",{"key":27,"text":608,"correct":22},"码放高度不得超过3m；码放层数不宜超过2层",{"key":30,"text":610,"correct":22},"码放高度不得超过3m；码放层数不宜超过3层",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]