[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,30,50,2846,[13,34,46,58,70,82,94,106,118,130,140,152,164,176,188,200,212,224,236,248,260,272,284,296,307,319,331,342,353,362,374,386,394,402,411,423,432,443,455,465,477,489,500,512,524,536,548,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1125976,1,"单选题","关于竖井土方开挖安全控制要点的说法，错误的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","临近各类管线、建（构）筑物时，开挖前应对管线、建（构）筑物采取加固措施",false,{"key":24,"text":25,"correct":26},"B","采用先开挖后支护方式时，随开挖随支护，随支护随开挖，均衡施工",true,{"key":28,"text":29,"correct":22},"C","吊装出土时，土方容器下降落稳后，施工人员方可靠近作业",{"key":31,"text":32,"correct":22},"D","发现坍塌征兆时，必须停止作业，施工人员撤至安全地带","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1125977,"隧道内应加强通风，在有瓦斯的隧道内进行爆破作业必须遵守现行( )的有关规定。",[38,40,42,44],{"key":20,"text":39,"correct":22},"地下铁道工程施工及验收规范",{"key":24,"text":41,"correct":22},"公路桥涵施工技术规范",{"key":28,"text":43,"correct":26},"煤矿安全规程",{"key":31,"text":45,"correct":22},"城镇燃气输配工程施工及验收规范",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1125978,"支护结构破坏、土体失稳或过大变形对基坑周边环境及地下结构施工影响( )，则基坑侧壁安全等级定为一级。",[50,52,54,56],{"key":20,"text":51,"correct":26},"很严重",{"key":24,"text":53,"correct":22},"一般",{"key":28,"text":55,"correct":22},"轻微",{"key":31,"text":57,"correct":22},"不严重",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1125979,"地下水对基坑的危害与土质密切相关，当基坑处于( )地层时，在地下水作用下，容易造成坡面渗水、土粒流失、流沙，进而引起基坑坍塌。",[62,64,66,68],{"key":20,"text":63,"correct":22},"黏性土",{"key":24,"text":65,"correct":26},"砂土或粉土",{"key":28,"text":67,"correct":22},"弱风化岩层",{"key":31,"text":69,"correct":22},"卵砾石层",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1125980,"关于应对基坑坍塌、淹埋事故的说法，正确的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早组织抢救仪器、设备",{"key":24,"text":77,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早组织抢险",{"key":28,"text":79,"correct":22},"及早发现坍塌、淹埋事故的征兆，及早进行应急演练",{"key":31,"text":81,"correct":26},"及早发现坍塌、淹埋事故的征兆，及早组织施工人员撤离现场",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1125981,"预制土桩起吊时的强度应达到设计强度的( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"50%",{"key":24,"text":89,"correct":26},"75%",{"key":28,"text":91,"correct":22},"85%",{"key":31,"text":93,"correct":22},"100%",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1125982,"钻孔灌注桩施工用水上作业平台的台面高程，应比施工期间最高水位高( )以上。",[98,100,102,104],{"key":20,"text":99,"correct":26},"700mm",{"key":24,"text":101,"correct":22},"650mm",{"key":28,"text":103,"correct":22},"600mm",{"key":31,"text":105,"correct":22},"550mm",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1125983,"顶进小型箱涵穿越铁路路基时，可用调轨梁或( )加固线路。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工便梁",{"key":24,"text":113,"correct":26},"轨束梁",{"key":28,"text":115,"correct":22},"横梁",{"key":31,"text":117,"correct":22},"纵横梁",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1125984,"相邻桩之间净距小于5m时，应待邻桩混凝土强度达到( )后，方可进行本桩钻孔。",[122,124,126,128],{"key":20,"text":123,"correct":22},"3MPa",{"key":24,"text":125,"correct":26},"5MPa",{"key":28,"text":127,"correct":22},"8MPa",{"key":31,"text":129,"correct":22},"10MPa",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1125985,"预制混凝土桩起吊时的强度应符合设计要求，设计无要求时，应达到设计强度的( )以上。",[134,136,137,139],{"key":20,"text":135,"correct":22},"90%",{"key":24,"text":91,"correct":22},{"key":28,"text":138,"correct":22},"80%",{"key":31,"text":89,"correct":26},{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1125986,"箱涵顶进挖土施工，应在（）时间进行。",[144,146,148,150],{"key":20,"text":145,"correct":22},"列车低速运行时",{"key":24,"text":147,"correct":26},"列车运行间隙",{"key":28,"text":149,"correct":22},"列车运行时",{"key":31,"text":151,"correct":22},"列车减速运行时",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1125987,"箱涵顶进穿越铁路路基时，应( )开挖和顶进。",[156,158,160,162],{"key":20,"text":157,"correct":26},"在列车运行间隙",{"key":24,"text":159,"correct":22},"连续",{"key":28,"text":161,"correct":22},"快速",{"key":31,"text":163,"correct":22},"慢速",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1125988,"钻孔桩成孔后或因故停钻，应将钻具置于地面上，保持孔内护壁泥浆的( )，以防塌孔。",[168,170,172,174],{"key":20,"text":169,"correct":22},"黏度",{"key":24,"text":171,"correct":26},"高度",{"key":28,"text":173,"correct":22},"密度",{"key":31,"text":175,"correct":22},"相对密度",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},1125989,"沉桩作业应由具有经验的( )指挥。",[180,182,184,186],{"key":20,"text":181,"correct":22},"专职安全员",{"key":24,"text":183,"correct":22},"技术人员",{"key":28,"text":185,"correct":26},"技术工人",{"key":31,"text":187,"correct":22},"技术负责人",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1125990,"加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置，( )。",[192,194,196,198],{"key":20,"text":193,"correct":22},"码放高度不得超过2m；码放层数不宜超过2层",{"key":24,"text":195,"correct":26},"码放高度不得超过2m；码放层数不宜超过3层",{"key":28,"text":197,"correct":22},"码放高度不得超过3m；码放层数不宜超过2层",{"key":31,"text":199,"correct":22},"码放高度不得超过3m；码放层数不宜超过3层",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1125991,"混凝土桩制作时，预制构件的吊环必须采用( )制作。",[204,206,208,210],{"key":20,"text":205,"correct":22},"经过冷拉的HPB300级热轧钢筋",{"key":24,"text":207,"correct":26},"未经过冷拉的HPB300级热轧钢筋",{"key":28,"text":209,"correct":22},"HRB335级热轧钢筋",{"key":31,"text":211,"correct":22},"HRB400级热轧钢筋",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1125992,"附近有10kV电力架空线时，必须保证钻机与电力线的安全距离大于( )。",[216,218,220,222],{"key":20,"text":217,"correct":22},"4m",{"key":24,"text":219,"correct":22},"4.5m",{"key":28,"text":221,"correct":22},"5m",{"key":31,"text":223,"correct":26},"6m",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},1125993,"检验批及分项工程应由( )组织施工单位项目专业质量（技术）负责人等进行验收。",[228,230,232,234],{"key":20,"text":229,"correct":22},"项目经理",{"key":24,"text":231,"correct":22},"项目技术负责人",{"key":28,"text":233,"correct":22},"总监理工程师",{"key":31,"text":235,"correct":26},"监理工程师",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1125994,"关于分部工程、单位工程验收程序的说法，错误的是( )。",[240,242,244,246],{"key":20,"text":241,"correct":26},"分部工程应由施工单位项目经理组织监理单位和项目技术、质量负责人等进行验收",{"key":24,"text":243,"correct":22},"单位工程完工后，在施工单位自检合格基础上，由总监理工程师组织专业监理工程师对工程质量进行竣工预验收",{"key":28,"text":245,"correct":22},"预验收合格后，由施工单位向建设单位提交工程竣工报告，申请工程竣工验收",{"key":31,"text":247,"correct":22},"建设单位收到工程竣工报告后，其（项目）负责人组织施工、设计、勘察、监理等单位进行单位工程验收",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1125995,"验收批一般项目验收合格标准是：实测（允许偏差）项目抽样检验的合格率应达到( )，且超差点的最大偏差值应在( )倍范围内。",[252,254,256,258],{"key":20,"text":253,"correct":22},"70%，1.0",{"key":24,"text":255,"correct":26},"80%，1.5",{"key":28,"text":257,"correct":22},"70%，1.5",{"key":31,"text":259,"correct":22},"80%，1.0",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1125996,"施工技术资料的编制要求和移交期限应在( )中做出明确规定。",[264,266,268,270],{"key":20,"text":265,"correct":22},"工程监理规划",{"key":24,"text":267,"correct":22},"开工批准文件",{"key":28,"text":269,"correct":22},"施工组织设计",{"key":31,"text":271,"correct":26},"施工合同文件",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1125997,"施工技术资料应随施工进度及时( )，所需表格应按有关法规的规定认真填写。",[276,278,280,282],{"key":20,"text":277,"correct":26},"整理",{"key":24,"text":279,"correct":22},"填写",{"key":28,"text":281,"correct":22},"收集",{"key":31,"text":283,"correct":22},"打印",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1125998,"根据房屋建筑工程和市政基础设施工程竣工验收合格后进行备案的规定，工程质量监督机构应当在工程竣工验收之日起( )d内，向备案机关提交工程质量监督报告。",[288,290,292,294],{"key":20,"text":289,"correct":26},"5",{"key":24,"text":291,"correct":22},"10",{"key":28,"text":293,"correct":22},"15",{"key":31,"text":295,"correct":22},"20",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1125999,"参加单位工程验收的人员应具备工程建设相关专业的中级以上技术职称并具有( )年以上从事工程建设相关专业的工作经历，参加单位工程验收的签字人员应为各方项目负责人。",[300,302,304,306],{"key":20,"text":301,"correct":22},"2",{"key":24,"text":303,"correct":22},"3",{"key":28,"text":305,"correct":22},"4",{"key":31,"text":289,"correct":26},{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":28,"analysis":33},1126000,"下列选项中，不属于工程竣工报告主要内容的是( )。",[311,313,315,317],{"key":20,"text":312,"correct":22},"施工组织设计文件",{"key":24,"text":314,"correct":22},"工程施工质量检查结果",{"key":28,"text":316,"correct":26},"竣工图",{"key":31,"text":318,"correct":22},"符合法律法规及工程建设强制性标准情况",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1126001,"竣工验收前建设单位应请( )对施工技术资料进行预验收。",[323,325,327,329],{"key":20,"text":324,"correct":22},"城建主管部门",{"key":24,"text":326,"correct":26},"当地城建档案部门",{"key":28,"text":328,"correct":22},"监理单位",{"key":31,"text":330,"correct":22},"质量监督部门",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},1126002,"施工技术资料应有( )签署的意见或监理单位对认证项目的认证记录。",[335,337,339,341],{"key":20,"text":336,"correct":22},"项目部",{"key":24,"text":338,"correct":22},"设计单位",{"key":28,"text":340,"correct":26},"建设单位",{"key":31,"text":330,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1126003,"总承包工程项目，由总承包单位负责( )整理所有有关的施工技术资料。",[346,347,349,351],{"key":20,"text":281,"correct":22},{"key":24,"text":348,"correct":26},"汇集",{"key":28,"text":350,"correct":22},"清点",{"key":31,"text":352,"correct":22},"汇总",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},1126004,"房屋和市政暂行办法规定：工程质量监督机构应在工程竣工验收之日起( )日内，向备案机关提交工程质量监督报告。",[357,358,359,361],{"key":20,"text":293,"correct":22},{"key":24,"text":291,"correct":22},{"key":28,"text":360,"correct":22},"7",{"key":31,"text":289,"correct":26},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},1126005,"经返修或加固处理的分项工程、分部工程，虽然改变外形尺寸但仍能满足( )要求，可按技术处理方案文件和协商文件进行验收。",[366,368,370,372],{"key":20,"text":367,"correct":26},"结构安全和使用功能",{"key":24,"text":369,"correct":22},"结构强度和使用功能",{"key":28,"text":371,"correct":22},"结构安全和环境保护",{"key":31,"text":373,"correct":22},"结构稳定和环境保护",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},1126006,"按《建设工程文件归档整理规范》GB\u002FT50328-2001要求，建设单位应当在工程竣工验收后( )内，向城建档案馆报送一套符合规定的建设工程档案。",[378,380,382,384],{"key":20,"text":379,"correct":22},"15天",{"key":24,"text":381,"correct":22},"1个月",{"key":28,"text":383,"correct":22},"2个月",{"key":31,"text":385,"correct":26},"3个月",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},1126007,"工程质量监督机构，应在竣工验收之日起( )日内，向备案机关提交工程质量监督报告。",[390,391,392,393],{"key":20,"text":293,"correct":22},{"key":24,"text":291,"correct":22},{"key":28,"text":360,"correct":22},{"key":31,"text":289,"correct":26},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},1126008,"建设单位必须在竣工验收( )个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的工程质量监督机构。",[398,399,400,401],{"key":20,"text":293,"correct":22},{"key":24,"text":291,"correct":22},{"key":28,"text":360,"correct":26},{"key":31,"text":289,"correct":22},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1126009,"工程竣工验收合格之日起15d内，( )应向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[406,407,409,410],{"key":20,"text":338,"correct":22},{"key":24,"text":408,"correct":22},"施工单位",{"key":28,"text":340,"correct":26},{"key":31,"text":328,"correct":22},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1126010,"建设单位应当自工程竣工验收合格之日起（）地方人民政府建设行政主管部门备案。",[415,417,419,421],{"key":20,"text":416,"correct":26},"15日内，向工程所在地的县级以上",{"key":24,"text":418,"correct":22},"15日内，向工程所在地的地级以上",{"key":28,"text":420,"correct":22},"30日内，向工程所在地的县级以上",{"key":31,"text":422,"correct":22},"30日内，向工程所在地的地级以上",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1126011,"竣工验收前，（）应请当地城建档案管理机构对施工技术资料进行预验收，预验收合格后方可竣工验收。",[427,428,429,430],{"key":20,"text":340,"correct":26},{"key":24,"text":408,"correct":22},{"key":28,"text":328,"correct":22},{"key":31,"text":431,"correct":22},"施工总承包单位",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1126012,"施工技术文件应按国家规范要求，在工程竣工验收后（）个月内，由建设单位报当地城建档案机构归档。",[436,438,439,441],{"key":20,"text":437,"correct":22},"1",{"key":24,"text":303,"correct":26},{"key":28,"text":440,"correct":22},"6",{"key":31,"text":442,"correct":22},"12",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},1126013,"城市建设工程档案应分专业按（）组卷。",[447,449,451,453],{"key":20,"text":448,"correct":22},"分项工程",{"key":24,"text":450,"correct":22},"分部工程",{"key":28,"text":452,"correct":22},"单项工程",{"key":31,"text":454,"correct":26},"单位工程",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1126014,"市政工程竣工验收前，建设单位应请( )对施工资料进行预验收。",[459,460,462,463],{"key":20,"text":328,"correct":22},{"key":24,"text":461,"correct":22},"工程质量监督机构",{"key":28,"text":338,"correct":22},{"key":31,"text":464,"correct":26},"城建档案管理机构",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1126015,"下列情况宜采用邀请招标的是( )。",[469,471,473,475],{"key":20,"text":470,"correct":22},"招标人已依法成立",{"key":24,"text":472,"correct":22},"初步设计及概算已获批",{"key":28,"text":474,"correct":22},"招标范围、方法、组织形式等已经核准",{"key":31,"text":476,"correct":26},"项目技术复杂或有特殊要求，只有少数几家潜在投标人可供选择的",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1126016,"向监理工程师发出索赔意向通知，应在索赔事件发生后（ ）内方为有效。",[481,483,485,487],{"key":20,"text":482,"correct":22},"14d",{"key":24,"text":484,"correct":26},"28d",{"key":28,"text":486,"correct":22},"42d",{"key":31,"text":488,"correct":22},"56d",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},1126017,"发生工程变更时，应由承包人以正式函件首先向（ ）提出索赔申请。",[493,495,497,498],{"key":20,"text":494,"correct":22},"发包方负责人",{"key":24,"text":496,"correct":22},"业主代表",{"key":28,"text":235,"correct":26},{"key":31,"text":499,"correct":22},"主管发包方部门",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1126018,"合同工期内发生的每笔索赔均应形成完整资料，它是工程（）资料的组成部分。",[504,506,508,510],{"key":20,"text":505,"correct":26},"竣工",{"key":24,"text":507,"correct":22},"技术",{"key":28,"text":509,"correct":22},"合同",{"key":31,"text":511,"correct":22},"计量",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1126019,"合同风险管理主要内容之一是对可能发生或已经发生的风险进行有效的（）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"控制",{"key":24,"text":519,"correct":22},"分析",{"key":28,"text":521,"correct":22},"识别",{"key":31,"text":523,"correct":22},"评估",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1126020,"施工项目订立合同、洽商变更和记录必须采用（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"书面形式",{"key":24,"text":531,"correct":26},"书面形式并签字确认",{"key":28,"text":533,"correct":22},"电子文档",{"key":31,"text":535,"correct":22},"口头协议",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1126021,"承包方选择专业分包的合格分包商，应采用（ ）程序。",[540,542,544,546],{"key":20,"text":541,"correct":26},"招投标",{"key":24,"text":543,"correct":22},"招标",{"key":28,"text":545,"correct":22},"投标",{"key":31,"text":547,"correct":22},"评标",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1126022,"施工项目合同订立主体是发包方和承包方，具体履行合同各项约定的是受承包方委托的（）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"法人",{"key":24,"text":555,"correct":22},"法定代表人",{"key":28,"text":557,"correct":22},"代理人",{"key":31,"text":559,"correct":26},"项目负责人",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1126023,"轮番假定多因素中一个因素变化，逐个计算、确定其对成本的影响，该方法为（）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"比较法",{"key":24,"text":567,"correct":26},"因素分析法",{"key":28,"text":569,"correct":22},"比率法",{"key":31,"text":571,"correct":22},"差额计算法",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1126024,"成功的项目成本管理首先要让施工项目中各个环节上的管理人员树立强烈的( )。",[576,578,580,582],{"key":20,"text":577,"correct":26},"成本意识",{"key":24,"text":579,"correct":22},"创收意识",{"key":28,"text":581,"correct":22},"核算意识",{"key":31,"text":583,"correct":22},"节支意识",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},1126025,"企业和施工项目部选用施工成本管理方法应遵循的原则之一是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"实用性原则",{"key":24,"text":591,"correct":22},"分层统一原则",{"key":28,"text":593,"correct":22},"适应变化原则",{"key":31,"text":595,"correct":22},"业务系统化原则",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]